0% found this document useful (0 votes)
9 views11 pages

Pag-IBIG 4PH Housing Loan Guide

Uploaded by

alonaserrato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views11 pages

Pag-IBIG 4PH Housing Loan Guide

Uploaded by

alonaserrato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Pag-IBIG Fund

COVERAGE

Purchase of Residential Units


constructed in the
housing projects
accredited under the
4PH Program
ELIGIBILITY REQUIREMENTS
Active Member with 24 Months contribution
Not more than 65 y/o at the time of application and insurable, not
more than 70 at loan maturity

Has capacity to acquire & encumber real property

Passed satisfactory CIBI


No outstanding Short Term Loan in arrears on Pag-IBIG account

that was foreclosed, cancelled, boughtback


due to default.
NEW! ELIGIBILITY REQUIREMENTS under 4PH

Must be a nominee of the LGU, DMW, or any participating


Organization/Institution as lead agency, and/or DHSUD based on the
prioritization of the beneficiaries in accordance with the ff:
1 First-Time homeowner
2 Within the low-income classification
NOTE: If not a First-Time Homeownerand/or do not meet the prescribed low income classification

• May not be entitled to the interest subsidy but may qualify for
other forms of subsidy.
• HL application will still be taken out under this program.
INTEREST RATE & LOAN TERM

Interest Rate

• DHSUD IR subsidy not to exceed 5%


• Subsidized Interest Rate = Prevailing IR less DHSUD
Interest Subsidy

Loan Term
• Maximum of 30 Years
Update!
DHSUD & NEDA Joint Memorandum Cir. 2023-003

Building Unit Sizes (sqm) Selling Price

10 Floors and
above 27 1,620,000
4PH SUPPORT

Subsidized
Interest
Rate
Price LGU
Amortization
Subsidy Support
4PH SUPPORT –AMORTIZATION TABLE
(with 5% Interest subsidy from National Government thru DHSUD)

Monthly
Insurance Required
Amort (MA) DHSUD IS Borrower’s MA *Borrower Required Difference
No. FA @ IR 6.250% GMI –
Loan Amount @5 @ 1.250% s Total GMI in RGMI
of (sq. m.) Reg.
(P & I) % MRI / SRI NLI MA @ Subsidized Due to
Store MA @
(a) (b) 1.250% MA Govt
y 6.250%
@1.250% Subsidy

10
an
d
Up 27 1,620,000.0 9,974.62 6,724.23 3,250.39 364.50 286.90 3,901.79 28,498.91 15,424.79 13,074.12
0

*exclusive of Estate Management @


P25.00/sq.m.
**based on GAP computation
4PH SUPPORT –AMORTIZATION TABLE
(with 5% Interest subsidy from National Government thru DHSUD)

Monthly Insurance Required


DHSUD is Borrower’s *Borrowe Required Difference
No. of FA Amort (MA) GMI –
Loan @5% (b) MA @ rs Total GMI in RGMI
Storey (sq. @ IR 6.250% Reg.
Amount 1.250% MRI / SRI NLI MA @ MA @ Subsidized Due to
m.) (P & I)
(a) 1.250% 6.250% MA Govt
@1.250% Subsidy

10
and
Up
27 1,620,000.00 12,125.21 6,726.53 5,398.68 364.50 286.90 6,050.08 28,498.91 15,424.79 13,074.12

*exclusive of Estate Management @


P25.00/sq.m.
**based on LAP computation
Thank you.

You might also like