3.45 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.
00
1.33 1.33 1.34 1.34 1.33 1.33
C
S
W W W
2 2 2
1.40
1.40
D D EXISTING CR
1 D
1
1.60
1.60
1
1.50
1.50
5.50
5.50
5.00
W
3
5.00
35.20
W
3
L
S
15.00
RUBBERIZED PAINTED AREA
23.80
5.00
W
3
5.00
W
3
28.50
UP UP
3.95
4 OPEN
BELOW
EXISTING EXISTING
BLEACHER BLEACHER
EMERGENCY
1.40
1.15
W W W W W W W EXIT
2 2 2 1 2 2 2
0.20
1.15
3.40 12.00 2.00 4.00 2.00 12.00 4.00 6.20
FLOOR PLAN
SCALE 1:125 MTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED AND PREPARED : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
CY.2023 PROJECT
REPUBLIC OF THE PHILIPPINES DETAILED ENGINEERING DESIGN PLAN FOR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REPAIR/ REHABILITATION OF
REGION - XIII MULTI- PURPOSE BUILDING (MUNICIPAL FLOOR PLAN
A 2
SURIGAODELNORTE GYMNASIUM),BRGY SAN PEDRO
SISON,SURIGAO DEL NORTE MICHAEL ANGELO D. GORGONIO RAUL L. PRECIADOS ROMMEL A. PIAPE DOHJIE B. MORALES, MPA MARCELINO M. OPERARIO
2NDDISTRICTENGINEERINGOFFICE 2 8 12
LOCATION: BRGY.SAN PEDRO,SISON, SURIGAO DEL NORTE ENGINEERING AIDE ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SURIGAO CITY SOURCE OF FUND: GAA 2023
APPROPRIATION: P DATE: DATE: DATE: DATE: DATE: