The document is a site development plan for a temporary field office for ESDC & ROW. It includes a basketball area, parking area, warehouse, office type EF, lounge, drivers area, genset area, and booster tank. It also shows existing manhole locations and a temporary office for ESDC & ROW sample room. Perspective and elevation views are provided with labeling of walls, ceilings, floors, and ground lines.

Uploaded by

JOMINA D SAFLOR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views8 pages

Esdc Row

The document is a site development plan for a temporary field office for ESDC & ROW. It includes a basketball area, parking area, warehouse, office type EF, lounge, drivers area, genset area, and booster tank. It also shows existing manhole locations and a temporary office for ESDC & ROW sample room. Perspective and elevation views are provided with labeling of walls, ceilings, floors, and ground lines.

Uploaded by

JOMINA D SAFLOR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

EXISTING

MANHOLE

TEMPORARY
OFFICE FOR ESDC SAMPLE
& ROW ROOM

MPCALA OFFICE

IC-DPWH-DESIGNER'S
OFFICE

ENTRY
EXIT
SERVICE
ENTRANCE
BASKETBALL AREA
PARKING AREA
WAREHOUSE DRIVERS GENSET
OFFICE TYPE EF LOUNGE
TYPE
BOOSTER
TANK

SITE DEVELOPMENT PLAN


SCALE NTS PERSPECTIVE VIEW
SCALE NTS

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
ATE 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW CHEC E Y
SITE DEVELOPMENT PLAN
AS SHOWN
PRC NO. Validity:
RE ISIO S
PTR NO. Date: A AA AS ARI AS PHI IPPI ES

TIN NO.
1 2 3 4 1 2 3 4 A B C

W
B TOP OF CEILING
W W
2 2 1
A TOP OF CEILING

W
2
W
2
W
1 FINISH FLOOR LEVEL
FINISH FLOOR LEVEL GROUND LINE
A A GROUND LINE

LEFT-SIDE ELEVATION
SCALE 1: 100 MTS
FRONT ELEVATION
SCALE 1: 100 MTS
B
W W
2 2

C B A
C
W

B
1
4 3 2 1

TOP OF CEILING

TOP OF CEILING
ESDC, ROW FLOOR PLAN FINISH FLOOR LEVEL
SCALE 1: 100 MTS
GROUND LINE
W W W
1 2 2

FINISH FLOOR LEVEL


GROUND LINE

RIGHT-SIDE ELEVATION
SCALE 1: 100 MTS

REAR ELEVATION
SCALE 1: 100 MTS

FFL

TYPE/NAME : D2/ FIBERBOARD FLUSH TYPE/NAME : W1/ ALUMINUM ANODIZED TYPE/NAME : W2/ ALUMINUM ANODIZED
DOOR SLIDING WINDOW SLIDING WINDOW
DESCRIPTION: 6mm FIBERBOARD HIGH DESCRIPTION: 6mm THK. CLEAR DESCRIPTION: 6mm THK. CLEAR GLASS ON
DENSITY PLYWOOD, SINGLE RABBIT GLASS ON ANALOK ALUMINUM FRAME ANALOK ALUMINUM FRAME
WOOD JAMB
QUANTITY: 4
QUANTITY: 3
QUANTITY: 2

SCHEDULE OF DOORS & WINDOWS


SCALE 1: 50 MTS

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
DATE : 10-15-2020 ARCHITECTURAL DETAILS
TEMPORARY FIELD OFFICE FOR ESDC & ROW CHECKED BY:
FLOOR PLAN
AS SHOWN
PRC NO. Validity: ELEVATION
REVISIONS:
SCHEDULE OF DOORS & WINDOWS
PTR NO. Date: LANGKAAN 2, DASMARINAS, PHILIPPINES

TIN NO.
1 2 3 4

A
SEE DETAIL 1

+.30m ON FILL

+.30m ON FILL

DETAIL 2 (TOP VIEW)


C SEE DETAIL 2

DETAIL 1 (TOP VIEW)

FOUNDATION PLAN
SCALE 1: 100 MTS

GROUND LINE NOTE: USE 50mm x 75mm x 3mm Thk


C-CHANNEL FOR WINDOW AND DOOR
OPENING

WALL CONNECTION DETAILS

WALL FOOTING

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
DATE 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW C EC ED B STRUCTURAL DETAILS
AS SHOWN
PRC NO. Validity: FOUNDATION PLAN
RE ISIONS
PTR NO. Date: LANG AAN 2 DAS ARINAS ILI INES

TIN NO.
1 3 4
1 2 3 4

A
A

EXISTING ROOFING FOR


COVERED PARKING

B
B

C
C

ROOF PLAN CEILING FRAMING


SCALE 1: 100 MTS
SCALE 1: 100 MTS

TRUSS DETAILS DETAILS

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
A 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW C C B STRUCTURAL/ARCHITECTURAL DETAILS
ROOF PLAN AS SHOWN
PRC NO. Validity: CEILING FRAMING

PTR NO. Date: A AA 2 A A A

TIN NO.
1 2 3 4

EXISTING
MANHOLE
MDP-3

TEMPORARY A
OFFICE FOR ESDC SAMPLE
& ROW ROOM

MDP-2
MDP-4
MPCALA OFFICE

IC-DPWH-DESIGNER'S
OFFICE
ACU -1

ENTRY
EXIT
MDP-5

RETROFITTING:
BAR BUS EXTENSION

USE SERVICE ENTRANCE TYPE CABLE -


SERVICE B
ENTRANCE
8mm2 IN 20mm Ø PVC PIPE EMBEDDED
BASKETBALL AREA
PARKING AREA
WAREHOUSE DRIVERS GENSET
OFFICE TYPE EF LOUNGE
TYPE
BOOSTER
TANK

SITE DEVELOPMENT PLAN


SCALE NTS POWER LAYOUT PLAN
SCALE 1: 100 MTS

1 2 3 4 1 2 3 4

ACU -1 ACU -1 ACU -1 ACU -1 ACU -1 ACU -1


A A
g g g 30 AT 30 AT 30 AT 30 AT 30 AT 30 AT
a a c c
0.75 HP 0.75 HP 0.75 HP 0.75 HP 0.75 HP 0.75 HP

MDP MDP-6 MDP-7 MDP-8 MDP-9 MDP-10 MDP-11


g g g
a a c c

f f f
b b d d

f f f
b b d d

Sab Scd
B e e e
B
Sefg
e e e

C C

MDP-1

LIGHTING LAYOUT PLAN ACU LAYOUT PLAN


SCALE 1: 100 MTS
SCALE 1: 100 MTS

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
ATE 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW CHEC E BY ELECTRICAL DETAILS
POWER LAYOUT PLAN AS SHOWN
PRC NO. Validity: LIGHTING LAYOUT PLAN
RE ISIO S
ACU LAYOUT PLAN
PTR NO. Date: A AA 2 AS ARI AS PHI IPPI ES

TIN NO.
GENERAL ELECTRICAL NOTES AND SPECIFICATIONS

1. ALL ELECTRICAL WORKS HEREIN, SHALL BE DONE IN ACCORDANCE WITH


APPLICABLE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE, REQUIREMENTS OF THE LOCAL AUTHORITIES ENFORCING
THE CODE, REQUIREMENTS OF THE POWER SERVICE COMPANY CONCERNED.

2. ALL JUNCTION UTILITY, SQUARE AND PULL BOXES SHALL BE GAUGE #18 OR
APPROVED EQUIVALENT AND SHALL BE PAINTED WITH ONE COAT PRIMER
PRIOR TO INSTALLATION.

3. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED


TYPE, APPROPRIATE WITH THE LOCATION AND INTENDED USE.

4. POWER SUPPLY SHALL BE 230 VOLTS, 3 PHASE, 60 HERTZ, THREE WIRE SYSTEM.

5. ALL WORKS HEREIN, SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A


DULY QUALIFIED AND LICENSED ELECTRICAL ENGINEER OR MASTER
ELECTRICIAN.

6. MINIMUM SIZE OF CONDUCTOR SHALL BE 3.5mm T.W. IN 20mm TRADE SIZE.

FEEDER: ON FREE AIR: 3-8.0mm2 THWN + 1-3.5mm2 TW (G)


7. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHT ABOVE
ON RACE WAY: 3-14mm2 THWN + 1-5.5mm2 TW (G) SERVICE
FINISHED FLOOR LEVEL UNLESS OTHERWISE NOTED.
ENTRANCE
MAIN: 70 AT, 250 AF/225 AF, 3P, 230V, MCCB 3Ø, 230V, 60Hz

A. WALL SWITCHES 1.50 mts.


B. CONVENIENCE OUTLET 0.30 mts. PANEL: MDP
C. C.O. ABOVE COUNTER 0.30 mts. FEED (FROM SERVICE ENTRANCE):
D.PANEL BOARD 1.80 mts. IF OVERHEAD: TOP
IF UNDERGROUND: BOTTOM SERVICE
E. ACU OUTLET 1.50 mts.
SURFACE MOUNTED ENTRANCE
ECB
8. ALL VERTICAL AND HORIZONTAL CONDUIT SHALL BE CONCEALED OR EMBEDDED VOLTAGE: 230 V
ON CONCRETE WALL AND FLOORS PHASE: 3
WIRE: 3 + G CONVANS
9. ALL CONDUITS SHALL BE PROPERLY REAMED PRIOR TO INSTALLATION TO AVOID ENCLOSURE: NEMA 1
NOTE: EXISTING ECB AT SERVICE
DAMAGES TO THE SKIN OF THE WIRE. MIN. KAIC: 10 ENTRANCE TO BE CUSTOMIZED IN
MDP
(OFFICE B)
THIS MANNER
10. WORKMANSHIP OF THE WORK THROUGHOUT SHALL BE EXECUTED IN THE
BEST AND MOST THOROUGH MANNER KNOWN TO THE TRADE AND TO THE MDP
SATISFACTION OF THE ENGINEER. (OFFICE A)

11. COORDINATE TO MPCALA FOR THE OWNER'S SUPPLIED MATERIALS.

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
DATE : 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW CHECKED BY: ELECTRICAL DETAILS
ELECTRICAL NOTES AS SHOWN
PRC NO. Validity: SCHEDULE OF LOADS
REVISIONS:
SINGLE-LINE DIAGRAM
PTR NO. Date: LANGKAAN 2, DASMARINAS, PHILIPPINES

TIN NO.
1 2 3 4

W W
2 2 EXISTING

A MANHOLE

(TAP TO EXISTING STREET


DRAINAGE LINE)

CO
CO
TCGI-ESDC DCCD-ESDC ROW OFFICE
LAV LAV
FD FD
B
WC WC OUTLET
W W
2 2
CO (TAP TO EXISTING
URI
CO

FD
LAV

WC
LAV

WC
FD
OUTLET
SEPTIC TANK STREET
DRAINAGE LINE)
C CO
URI
VSTR
SEPTIC TANK
VSTR
CO
VSTR 100mm DIA. PVC SOIL PIPE

VSTR 100mm DIA. PVC SOIL PIPE

SEWAGE & SANITARY LAYOUT PLAN


SCALE 1: 100 MTS ENLARGE PLAN

1 2 3 4

A
W
2
W
2 FAU FAU

TCGI-ESDC DCCD-ESDC ROW OFFICE

FAU FAU
B
W W
2 2
FAU FAU

FAU FAU (TAP TO NEAREST WATER SUPPLY)


C
(TAP TO NEAREST WATER
SUPPLY)

WATER LINE LAYOUT PLAN


SCALE 1: 100 MTS
ENLARGE PLAN

CAD / DESIGN BY:


LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
DATE 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW CHEC ED BY PLUMBING DETAILS
SEWAGE & SANITARY LINE AS SHOWN
PRC NO. Validity: WATER LINE
REVISIONS
PTR NO. Date: LANG AAN 2 DASMARINAS PHILIPPINES

TIN NO.
GENERAL NOTES AND PLUMBING SYMBOLS :
SPECIFICATIONS: FAU FAUCET SSP SOIL STACK PIPE
WC WATER CLOSET VSTR VENT STACK THRU ROOF
1. ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE WITH THE
RULES AND REGULATIONS OF THE LATEST EDITION OF THE LOCAL LAV LAVATORY GV GATE VALVE
PLUMBING CODES, ORDINANCES AND UNIFORM PLUMBING CODE. FD FLOOR DRAIN CV CHECK VALVE

2. ALL PLUMBING WORKS, METHODS OF INSTALLATIONS, LOCATION CO CLEANOUT


AND QUALITY SHALL BE SUBJECT TO THE RECOMMENDATION AND
APPROVAL OF THE ENGINEER.

3. ALL PIPING MATERIALS, WATER LINES, WASTE AND SOIL PIPES AND
FITTINGS SHALL BE OF APPROVED QUALITY AND TO BE TESTED FOR
LEAKS, BACKFLOW AND MALFUNCTION.

4. ANY CHANGE AND DEVIATIONS IN THE PLAN SHALL BE APPROVED BY


THE OWNER OR ITS AUTHORIZED REPRESENTATIVE.

5. ALL PIPES MUST BE CAREFULLY AND TIGHTLY FITTED TO AVOID


LEAKAGES. ALL PIPES PASSING THROUGH WALLS,FLOOR SLABS,
BEAMS AND FLOORS SHALL BE PROPERLY PROTECTED AGAINST
DEFORMATION, LEAKAGE AND DISLOCATION.

6. ALL PIPES AND FITTINGS SHALL BE KEPT CLEAN WITH THE


EXPOSED END OF THE INCOMPLETED OR CONNECTED WORK TO BE
PLUGGED.

7. UNDERGROUND PIPES AND FITTINGS SHALL BE BURIED TO A MINIMUM 10mmØ BARS


DEPTH OF 300mm BELOW THE SURFACE OF THE GROUND AND A SPACED @ 0.20m O.C.
MINIMUM DISTANCE OF 600mm FROM THE BUILDING.
0.50x0.50m 0.50x0.50m
CO CO CO
FIN. FLR. LINE MANHOLE MANHOLE

10mmØ BARS AIR SPACE

2400.00
SPACED @ INLET
0.20m O.C. OUTLET

4"x4" PVC SANITARY


TEE FITTING
10mmØ HOR. BARS
CO IN EVERY 3 LAYERS
OUTLET DIGESTIVE OF CHB
CHAMBER LEACHING
CHAMBER
MANHOLE MANHOLE 4" CHB WALL
( PLASTERED ) 4" CHB WALL WITH
10mmØ VERT BARS
Ø10mm REBARS AT 0.60m O.C.
SPACED @ 0.40 M O.C.
INLET CO ON BOTHWAYS
CO

PLAN
SECTION
CAD / DESIGN BY:
LOGO: ENGINEER: PROJECT TITLE / LOCATION:
SHEET CONTENTS: SCALE SHEET NO.
JDR-CE
DATE : 10-15-2020
TEMPORARY FIELD OFFICE FOR ESDC & ROW CHECKED BY: PLUMBING DETAILS
AS SHOWN
PRC NO. Validity: GENERAL NOTES
REVISIONS: SEPTIC TANK DETAILS
PTR NO. Date: LANGKAAN 2, DASMARINAS, PHILIPPINES

TIN NO.

You might also like