0% found this document useful (0 votes)
23 views1 page

To Taufiq

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

To Taufiq

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

B.D. REF.

:
F.S.D. REF. :
NOTES: D.L.O. REF. :
Key Plan: 1 SA 2 SB 3 4 5 6 7 8 9 CA 10 CB 11 12 13 14 15 16

1. TO BE READ IN CONJUNCTION WITH DRAWING NUMBER:

W
S1

M22010_RED_E_XX_6_21_DWG_110000.

N
C1

PA PB PC

S2 P1
C2

S3 P2

1 SA 2 SB 3 4 5 6 7 8 9 CA 10 CB 11 12 13 14 15 16

E
G

GC

GB

GA

G18 G17 G16 G15 G14 G13 G12 G11 G10 G9 G8 G7 G6 G5 G4 G3 G2 G1

R1
GHA

R2 GHB

Ø150 RA RB GH1 GH2

Notes:
1. THE INSTALLATION AND DESIGN SHALL COMPLY WITH THE HEALTH AND SAFETY AT
WORK ACT, AND ALL REGULATIONS.
2. ALL DIMENSIONS SHOWN IN MILLIMETRES.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL ASSOCIATED EQUIPMENT
SCHEDULES AND MECHANICAL, ELECTRICAL, STRUCTURAL AND ARCHITECTURAL

S1 DRAWINGS.
4. ALL SERVICE ROUTES, EQUIPMENT LOCATIONS & SERVICE/MAINTENANCE SPACE SHALL
BE CHECKED AGAINST FULLY DETAILED ARCHITECTURAL, STRUCTURAL & SPECIALIST
C1 PR02.01.XXX.WTT.03 SERVICE DRAWINGS.
5. ALL DIMENSIONS SHALL BE CHECKED ON SITE.
6. THE CONTRACTOR SHALL FULLY COMPLY WITH ALL RELEVANT STANDARDS,
Ø150 REGULATIONS, STANDARD CODES OF PRACTICE, METHODS OF WORKING, AND GOOD
PRACTICE.
7. COORDINATION WORKING DRAWINGS, INSTALLATION DRAWINGS AND BUILDERSWORK

PA PB PC DRAWING SHALL BE PREPARED BY THE CONTRACTOR.


8. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWING. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING ALL DIMENSIONS AND LEVELS ON SITE FOR ACTUAL
SETTING OUT OF WORKS
Ø200 HYDRANT

CABLE CHAMBER 2
CABLE CHAMBER 1
PR02.01.EXX.PUF.01
S2 P1 PLANT
Ø150 HYDRANT PIPE FROM C2 SHELTERED
ROOM AREA PR02.01.EXX.PUF.03
(FOR EXTERNAL HYDRANT JOCKEY PUMP)
MAKE-UP WATER
ABOVE GROUND TO UNDERGROUND PUMP
DOMESTIC WATER FIRE PUMP ROOM
Ø150 HYDRANT PIPE FROM TANK & PR02.01.FXX.PUF.02
FILTRATION ROOM
UNDERGROUND TO ABOVE GROUND Ø25 HYDRANT
Ø150 HYDRANT
S3 P2 Ø150 HYDRANT PIPE FROM
ABOVE GROUND TO UNDERGROUND
FROM TOP TO BELOW:
Ø150 HYDRANT PIPE
Ø150 WET PIPE
Ø50 HOSE REEL PIPE
2 NOS. OF STANDBY
HOSE FOR FIRE
BRIGADE USE (TYP.) Ø150 Ø150
Ø150 WET
Ø150
CAPPED OFF FOR FUTURE CONNECTION
Ø150 HYDRANT PIPE FROM
WORK PROGRESS
UNDERGROUND TO ABOVE GROUND
E.01.XXX.HYD.02
PIV (TYP.)
1) Install Sprinkler Piping and Final
Ø150

Ø100 DP (F/A)
G FOR CONTINUATION SEE DWG. NO. Fix throughout the building.
M22010_RED_E_01_6_21_DWG_200002 STAIRCASE STAIRCASE
FOR CONTINUATION SEE DWG. NO.
Ø100 DP M22010_RED_E_01_6_21_DWG_200003
F
PRE-ACTION VALVE
MECHANICAL CORRIDOR E110 MECHANICAL CORRIDOR E120
IDF ROOM 2 IDF MECH
CORRIDOR 2
MMR ROOM 2
2) Install Hose Reel piping and
Drum.
SUB COMMS
ROOM 1
DATA HALL E110 (446 RACKS = 10.09kW/rack) = 4500kW IT) DATA HALL E120 (446 RACKS = 10.09kW/rack) = 4500kW IT)
2.9M (CLEAR)
ADMIN CORRIDOR
3) Install Fire Alarm, VESDA and
STAIRCASE

E
1

LOADING/ Fireman Intercom System.

Ø150
UNLOADING BAY

IDF MECH
CORRIDOR 1 RNG MECH
CORRIDOR 2 MAIN COMMS
ROOM 2
4) Install Internal Hydrant System.
5) Install Fire Extinguisher
FM STORAGE
6) Testing and Commisioning for
D
TECH SPACE STAGING/
Fire Protection System
IDF ROOM 1

OFFICE & RECEIVING ROOM

1 DATA HALL

2.9M (CLEAR) ADMIN CORRIDOR 1


TECH SPACE

4.2M (CLEAR) DC CORRIDOR 1


AREA RNG ROOM
(1.2MW RNG 5 x 22
RACK/ROW) 2
2.5M (CLEAR) DC CORRIDOR 1 2.5M (CLEAR) DC CORRIDOR 1
GOODS LIFT
LOBBY 1
E.01.XXX.HYD.01

MEP CORRIDOR 2

Ø150 HYDRANT PIPE FROM


2M (CLEAR) DC CORRIDOR 1

ABOVE GROUND TO UNDERGROUND

ELECTRICAL
ROOM 1

C
Ø150

VISITOR MEETING SOC


IDF ROOM 3 ROOM
RNG MECH MAIN COMMS
CORRIDOR 1 ROOM 1

B
ENTRANCE FOYER

STAIRCASE DATA HALL E130 (446 RACKS = 10.09kW/rack) = 4500kW IT) DATA HALL E140 (446 RACKS = 10.09kW/rack) = 4500kW IT)
IDF MECH
CORRIDOR 3
FCR
IDF ROOM 4 MMR ROOM 1
IDF MECH
CORRIDOR 4
Ø150 SPRINKLER PIPE
MECHANICAL CORRIDOR E130
FROM UNDERGROUND TO ABOVE MECHANICAL CORRIDOR E140

A
FOR CONTINUATION SEE DWG. NO.
M22010_RED_E_01_6_21_DWG_200004
GC

P4 60% DETAILED DESIGN 26/04/2024 NMO


P3 30% DETAILED DESIGN 08/03/2024 NMO
SUB COMMS P2 30% DETAILED DESIGN 31/01/2024 NMO
ROOM 2 P1 10% DETAILED DESIGN 08/12/2023 NMO
Rev. Description Date Checked By
GB Client :

GANTRY
AREA MEP Designer :

3 ANSON ROAD #17-03


SPRINGLEAF
TOWER SINGAPORE 079909
t: +65 6226 3106 | www.red-eng.com

Architect :
AWP PTE LTD
GA 143 CECIL STREET, #12-00 GB
BUILDING SINGAPORE 069542
Tel: + 65 63376777, Fax:+ 65 63396956
www.awparchitects.com
Civil and Structure Designer :

Security Consultant :

General Contractor :

G18 G17 G16 G15 G14 G13 G12 G11 G10 G9 G8 G7 G6 G5 G4 G3 G2 G1


Project :
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA
JALAN, PARIT & BANGUNAN 1974 (AKTA 133) BAGI CADANGAN
PEMBANGUNAN PUSAT DATA (DATA CENTRE) YANG
MENGANDUNGI :
i. 1 BLOK PUSAT DATA 1 TINGKAT BESERTA PEJABAT 1 TINGKAT
R1 ii. 1 UNIT PONDOK PENGAWAL
iii. 1 UNIT KEBUK SAMPAH
GHA iv. 1 UNIT RUMAH PAM
v. 1 UNIT SURAU
vi. 1 UNIT PENCAWANG ELEKTRIK 'CONSUMER' 2 TINGKAT
G.01.XXX.HYD.01
Ø150 HYDRANT PIPE FROM DI ATAS SEBAHAGIAN PTD 203895, JALAN BIOTEKNOLOGI 1,
ABOVE GROUND TO UNDERGROUND KAWASAN PERINDUSTRIAN SiLC, ISKANDAR PUTERI, MUKIM PULAI,
Ø150 HYDRANT PIPE FROM Ø150 HYDRANT PIPE FROM
Ø150 HYDRANT PIPE CAPPED OFF DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
UNDERGROUND TO ABOVE GROUND UNDERGROUND TO ABOVE GROUND
R2 Ø150 HYDRANT PIPE FROM
UNDERGROUND TO ABOVE GROUND
GHB FOR FUTURE CONNECTION Drawing Title :

FIRE PROTECTION SERVICES


GH02.01.XXX.HYD.01 SITE - UNDERGROUND EXTERNAL
Ø150 HYDRANT PIPE FROM G.01.XXX.HYD.02 HYDRANT LAYOUT
ABOVE GROUND TO UNDERGROUND
RA RB GH1 GH2
4/25/2024 11:03:41 AM
Autodesk Docs://LAIO_AirTrunk JHB1/M22010_RED_0_ZZ_6_21_3_Fire Protection_E.rvt

Designed By : Drawn By :

RS/MRA KC
PRINTED BY: RED GRPAHICS TEAM

Date : Approved By :

26/04/2024 NMO
CAD REF :

-
ATJHB1-RED-XX-ZZ-M3-MEP-2022.RVT

Scale :

1:100@A0
Project Identifier :

AT-JHB01
MODEL NAME: MEP MODEL

Drawing Number & Revision:

M22010_RED_E_00_6_21_DWG_210000
Job No. : Drawing Status :
FILE NAME:
PLOT DRV:

M22010 DETAILED DESIGN