0% found this document useful (0 votes)
32 views1 page

Section

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

Section

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

B.D. REF.

:
F.S.D. REF. :
D.L.O. REF. :
Key Plan: 1 SA 2 SB 3 4 5 6 7 8 9 CA 10 CB 11 12 13 14 15 16

LEGEND

N
S1
C1

PA PB PC

FIRE SPRINKLER SYSTEM S2

S3
C2
P1

P2

SYMBOL DESCRITION

E
S
G

PRE-ACTION DRY PIPE


D

WET SPRINKLER PIPE A

GC

GB

SPRINKLER HEAD - WET PENDENT (79°) GA

G18 G17 G16 G15 G14 G13 G12 G11 G10 G9 G8 G7 G6 G5 G4 G3 G2 G1

SPRINKLER HEAD - DRY PENDENT (79°C) R1

R2
GHA

GHB

(CONCEALED) RA RB GH1 GH2

SPRINKLER HEAD - DRY PENDENT (79°C) Notes:

(CONCEALED) 1. THE INSTALLATION AND DESIGN SHALL COMPLY WITH THE HEALTH AND SAFETY AT
WORK ACT, AND ALL REGULATIONS.
2. ALL DIMENSIONS SHOWN IN MILLIMETRES.
SPRINKLER HEAD - WET UPRIGHT (79°C) 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL ASSOCIATED EQUIPMENT
SCHEDULES AND MECHANICAL, ELECTRICAL, STRUCTURAL AND ARCHITECTURAL
(CONCEALED) DRAWINGS.
4. ALL SERVICE ROUTES, EQUIPMENT LOCATIONS & SERVICE/MAINTENANCE SPACE SHALL
BE CHECKED AGAINST FULLY DETAILED ARCHITECTURAL, STRUCTURAL & SPECIALIST
SERVICE DRAWINGS.
SPRINKLER HEAD - DRY UPRIGHT 5. ALL DIMENSIONS SHALL BE CHECKED ON SITE.
6. THE CONTRACTOR SHALL FULLY COMPLY WITH ALL RELEVANT STANDARDS,
REGULATIONS, STANDARD CODES OF PRACTICE, METHODS OF WORKING, AND GOOD
SPRINKLER HEAD - CUT-OFF PRACTICE.
7. COORDINATION WORKING DRAWINGS, INSTALLATION DRAWINGS AND BUILDERSWORK
DRAWING SHALL BE PREPARED BY THE CONTRACTOR.
8. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWING. THE CONTRACTOR SHALL BE
SPRINKLER HEAD - GANTRY (141°C) RESPONSIBLE FOR OBTAINING ALL DIMENSIONS AND LEVELS ON SITE FOR ACTUAL
SETTING OUT OF WORKS

1 2 3 4 5 6 7
9600 10500 10800 10800 10800 9800

FOR CONTINUATION REFER TO DRAWING NO.


M22010_FITTERS_E_01_6_21_DWG_200001 E D

18250

BUILDING E - LEVEL 1 BUILDING E - LEVEL 1

860 235
26025 26025

250
860
Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
FROM L TO R:
E.01.XXX.SPV.01
Ø25 Ø25 Ø25 Ø32 Ø25 Ø25
E.01.E10.PAS.12 FROM L TO R:
E.01.E10.PAS.13 E.01.E10.CTR.44 Ø32 Ø100
E.01.E10.CTR.45 Ø25 Ø25
E.01.F10.PAS.14 Ø25 Ø25 Ø25 Ø25

1230

1230
E.01.F10.CTR.46
E.01.F10.PAS.15
E.01.F10.CTR.47 Ø25 Ø25 Ø25 Ø32 Ø25 Ø25 Ø25
G Ø25
FOR CONTINUATION SEE DWG. NO. Ø20 Ø20
M22010_FITTERS_E_00_6_21_DWG_210000 Ø25 Ø25 Ø25 Ø20 Ø25 Ø32 Ø32 Ø25 Ø25 Ø20 Ø25 Ø20
Ø20
3000

Ø100 SPRINKLER RISER

Ø25
DRAIN F/A-L/L AT FOR CONTINUATION SEE DWG. NO.
M22010_FITTERS_E_02_6_21_DWG_200002
S/CASE
NEAREST FLOOR DRAIN
PRE-ACTION VALVE Ø100
F
FOR CONTINUATION
995 3000 3000 3000 1200 1200 1200 3000 1500
Ø80

Ø80

Ø150

Ø150

MECHANICAL CORRIDOR E110


Ø25
Ø150

SEE DWG. NO.


M22010_FITTERS_E_02_6_21 Ø25 Ø25 Ø25 Ø25
_DWG_200002 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Ø25

Ø25

Ø80 Ø65 Ø65 Ø50 Ø50 Ø40 Ø40 Ø32 Ø32

Ø25
7350

Ø40

4200

4200
Ø25 Ø32 Ø25

1042

Ø25
FROM T TO B: DATA HALL E110 (446 RACKS = 10.09kW/rack) = 4500kW IT)
SUB COMMS
Ø150 WET
Ø32

ROOM 1 Ø25 79°C 79°C


Ø150 PRE-ACTION
Ø80 PRE-ACTION Ø25 Ø32

3000
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25

Ø150

Ø25
Ø25
E
Ø40

Ø25 Ø32
IDF MECH 79°C 79°C

S/CASE CORRIDOR 1
Ø32

Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25
3000

FOR CONTINUATION REFER TO DRAWING NO. M22010_FITTERS_E_01_6_21_DWG_200003


Ø25 Ø32
FROM T TO B: BUILDING E - GROUND FLOOR
BUILDING E - GROUND FLOOR
Ø150 WET Ø25
Ø150 PRE-ACTION 79°C 79°C 19500 19500

Ø25
Ø65 PRE-ACTION Ø25 Ø25
8400

Ø65

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø32
Ø25
3000

Ø25
Ø25 Ø25 Ø25
FOR CONTINUATION
Ø65

SEE DWG. NO. 79°C 79°C


M22010_FITTERS_E_01_6_21
Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32
Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø40
Ø32

Ø32
_DWG_201002 Ø25 Ø25 Ø25

1754
Ø150 Ø150 Ø100 Ø100 Ø80 Ø80 Ø65 Ø65
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
79°C Ø25
Ø40

D Ø25 Ø25 Ø25 Ø15 Ø15


Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
2177

1.5M (CLEAR) DC CORRIDOR 1


2300
Ø25

Ø25

Ø25

Ø25
Ø40

Ø25 Ø25 Ø25 79°C 79°C


Ø256300
Ø40

Ø25
3000
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25 Ø25 Ø25
Ø32

79°C 79°C
1000

Ø25
Ø25 Ø25 Ø25
Ø32

DRY UPRIGHT SPRINKLER SHALL HAVE A

Ø25
TEMPERATURE RATING OF 79°C. TYPICAL TO ALL
15500

Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
2.5M (CLEAR) DC CORRIDOR 1

Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25 Ø25
IDF ROOM 1 Ø150
Ø150

Ø25 Ø25 Ø25

Ø25
Ø25 Ø25
Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
FROM T TO B:
Ø150 WET Ø25 Ø25
Ø150 PRE-ACTION
Ø25
Ø80 PRE-ACTION

Ø150
Ø25

Ø25

Ø25

Ø25

Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25 Ø25
Ø25 Ø15 Ø15 Ø25
C
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25

Ø25

Ø25

Ø25

Ø25
Ø25

Ø150 Ø100 Ø100 Ø80 Ø80 Ø65 Ø65


Ø25 Ø25
Ø150
Ø40
Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø32

Ø25
Ø32
5400

FROM T TO B:
Ø150 WET Ø25 Ø25

Ø25
Ø80 PRE-ACTION Ø25
Ø32
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25
Ø25 Ø25

BLDG E - LEVELBUILDING
1 FIRST
BLDG EE
FLOOR
--LEVEL
LEVEL
FFL
11
Ø25
Ø150

B
FIRST FLOOR
Ø25

Ø25 Ø25
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

S/CASE Ø25 00 FOR APPROVAL (60% DD - P3) 28/05/2024 JRG


Rev. Description Date Checked By
Client :
Ø25 Ø25
IDF ROOM 3 Ø25
Ø25

26.03 m 26025
Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25

Ø25 Ø25

26000
10350

IDF MECH Ø25


MEP Designer :
Ø25

CORRIDOR 3 DATA HALL E130 (446 RACKS = 10.09kW/rack) = 4500kW IT)


Ø25 Ø25 3 ANSON ROAD #17-03 SPRINGLEAF
Ø25 TOWER SINGAPORE 079909
Ø25

t: +65 6226 3106 | www.red-eng.com


Ø25 Ø65
Ø150

Ø80 Ø65 Ø50 Ø50 Ø40 Ø40 Ø32 Ø32


Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25 Ø25
Architect :
Ø25 Ø25 Ø25 Ø32 Ø25 AWP PTE LTD
MECHANICAL CORRIDOR E130
143 CECIL STREET, #12-00 GB BUILDING
FOR CONTINUATION SEE DWG. NO.
M22010_FITTERS_E_01_6_21_DWG_200004 SINGAPORE 069542
A Tel: + 65 63376777, Fax:+ 65 63396956
www.awparchitects.com
Civil and Structure Designer :

264 Security Consultant :

General Contractor :

Project :
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA
JALAN, PARIT & BANGUNAN 1974 (AKTA 133) BAGI CADANGAN

50 PEMBANGUNAN PUSAT DATA (DATA CENTRE) YANG


MENGANDUNGI :
i. 1 BLOK PUSAT DATA 1 TINGKAT BESERTA PEJABAT 1 TINGKAT
ii. 1 UNIT PONDOK PENGAWAL
iii. 1 UNIT KEBUK SAMPAH
iv. 1 UNIT RUMAH PAM
v. 1 UNIT SURAU
vi. 1 UNIT PENCAWANG ELEKTRIK 'CONSUMER' 2 TINGKAT
DI ATAS SEBAHAGIAN PTD 203895, JALAN BIOTEKNOLOGI 1,
KAWASAN PERINDUSTRIAN SiLC, ISKANDAR PUTERI, MUKIM PULAI,
DAREAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
Drawing Title :

FIRE PROTECTION SERVICES

DH E - GF -
UPRIGHT SPRINKLER LAYOUT 2

Designed By : Drawn By :

RS/MRA MAZ
Date : Approved By :
28/05/2024 NMO
CAD REF :

Scale :
N.T.S
Project Identifier :

AT-JHB01
Drawing Number: Revision:

M22010_FTR_E_01_6_21_DWG_200002 00
Job No. : Drawing Status :

M22010 WORKING DRAWING

You might also like