0% found this document useful (0 votes)
40 views1 page

3 Flooring Layout - Level 1

Uploaded by

lihixe5828
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views1 page

3 Flooring Layout - Level 1

Uploaded by

lihixe5828
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Plant 13 Annex, Near Godrej One,

Pirojshanagar, Vikhroli East,


Mumbai, Maharashtra - 400079

CLIENT : Godrej Interio

PMC : GODREJ INTERIO - INTERIORS

ARCH / CONSULTANT :
GODREJ INTERIO - INTERIORS
DESIGN TEAM

PROJECT NAME :

Rungta Sons Pvt. Ltd.


Chaibasa, Jharkhand

First Floor
1_01
Open space office Flooring Layout
550 m²

GENERAL NOTES :
Flooring Schedule

Michel Angelo FF01


Marble

Mitshubishi Grey FF02


Marble

Rosso Lavante -
Red Marble

Vinyl Textile FF03b


500 mm x500 mm

500
500
Wood Paraquet FF06
ST 150 mm x 2200 mm

530 PFA_R3AR_DG_A202_V01

1400
Anti Skid Tile FF04
2400 mm x 1200 mm

3380
500 2040
1_09 1860 ST
2720 Cool Tile
1_03 1_04

1700
600 mm x 600 mm

1590
Distribution
179 m² Distribution WC Chamber
970

3 m² 4 m²
1400

1440

1440
ST
Access Floor
Shaft
1800 1.85 x 2.3
ST
4700

1200
ST UP 1 2400
Granite Floor - Mid-landing
1990
1550

13 14 15 16 17 18 19 20 21 22 23 24 3020 2
3
Granite Floor - Tread
1_30 HUB ROOM 4
Shaft 2710
Emergency stairs 2440 5 13 14 15 16 17 18 19 20 21 22 23 24

4860
4100

Granite Floor - Riser


1.85 x 2.3

8680
6
21 m²
7 2330 Shaft
12 11 10 9 8 7 6 5 4 3 2 1 1_27 1.85 x 2.3 Granite Floor - Skirting
2710
Emergency exit 12 11 10 9 8 7 6 5 4 3 2 1
11 m² ST 1_05
Stairs 6.66x 3.25 UP Washroom
8
9 1_33 22 m²
ST 10 Shaft cleaning room
11 1.85 x 2.3 3 m²
6540 1800 6700 1800
2080

12
1_31
3040

3050

13
Technical 8 m² 1_32 1_02 1 2 3 4 5 6 7 8 9 10 11 12
14

1700
15 m² Print Room 15
Stair Lobby Elevator Lobby
1_26 16 58 m² 27 m² 1_06 0 29-11-2024 Flooring Layout
Shaft 17 Emergency stairs
Shaft 4.80x0.6 1.85 x 2.35 18
21 m² Rev Date Description
ST
19
ST 24 23 22 21 20 19 18 17 16 15 14 13
20

Stairs 6.66x 3.25


1_07
1800 21
9170 Project No :

3480
Pantry
3230
3260

3260

22
1_25 1870
3350 3320 3330
23 8 m² Shaft 1.80x 4.17 Drawing No : GB/03/FLR LAY
2360
Storage 24 Phone

1930
1_23 1_24 7 m² 2420 3590
5030

1_22 2270 25 Booth


Cabin Cabin 26 Project Stage : EXECUTION
Chamber
11 m² 11 m² 27
3640

18 m² ST ST ST ST DB Shutter
ST
Drawn By : SAYALI

Checked By : DEOYANI
1700

1690
ST

1_17 1_14
DISCLAIMER :
ST ST 1_20 ST 1_18 ST ST 1_16 12 m² ST 1_15 12 m² ST ST 1_13 ST 1_12 ST
12 m² 12 m² 12 m² 1_11 The drawings are the copyright works of Godrej & Boyce Mfg. Co. Ltd. Godrej
Cabin 12 m² Cabin 12 m² Cabin Cabin Cabin Cabin Cabin Cabin 12 m² Chamber & Boyce Mfg. Co. Ltd. reserves all rights whatsoever in the drawings. Godrej
18 m² & Boyce Mfg. Co. Ltd. asserts its right over the drawings that has been
4880 3300 3300 3300 3300 3300 3300 3300 3300 4870 conceived by the client of its efforts and also views reproduction of the
3350

3350

3350

3350

3350

3350

3350

3350

3350

3350
drawings, as is or by making cosmetic and other changes, as a violation of its
copyright.
No part of the drawings shall be copied or reproduced without the written
1_21 approval of Godrej & Boyce Mfg. Co. ltd.

Chamber On site accuracy ±5mm.


18 m² Non-confirmity with any information should be immediately reported. In case
of any discripancy in the drawing, please contact the chief architect
immediately.

Date : 19/11/2024 Flooring Layout


Scale : NTS
First Floor

North : Revision No.

R0

You might also like