POWER
POWER
Dimensions are not to be scaled from this drawing. All works are to be
carried out in accordance with the relevant B.S. and codes of practice and
are also to meet the local authority requirements. The contractor and their
subcontractors are to verify all dimensions on site before making any shop
drawings and before executing the works.
N
CEILING
500mm
500mm
500mm
SPUR O/L FOR CCSB CAMERA SPUR O/L FOR FCUS/VAV CAMERA SPUR O/L FOR MSFD / MD CM / MM / IFU OF FIRE ALARM
CEILING / WALL MOUNTED CEILING / WALL MOUNTED CEILING / WALL MOUNTED CEILING / WALL MOUNTED
UP
- - -D RI V E W A Y - - -
- - - - P A R K I N G AREA - - - -
GREEN
- - - -PARKING - - - -
OPEN TO SKY
300
50°C AMBIANT TEMPERATURE.
4. ALL POWER CIRCUITS SHALL BE RING CIRCUIT.
DISTRIBUITON BOARD
PLANT ROOM SOCKET
2000
2000
DISTRIBUITON BOARD
3121
SOCKETS
1880
LIGHTING SWITCH
6. PROVIDE DRAW WIRES IN EMPTY CONDUITS ASSIGNED FOR FUTURE USE.
1250
1250
BREAK GLASS
1200
1200
HAND DRYER
100
7. CONTRACTOR SHALL OBTAIN APPROVAL OF SHOP DRAWINGS FROM
1300
SUB MAIN
SOCKETS
RAK PRIOR TO INSTALLATION. CONTRACTOR SHALL BE
450
400
400
RESPONSIBLE TO COORDINATE WITH VARIOUS AUTHORITIES.
8. OUTLET LOCATIONS IN KITCHEN/PANTRY SHALL BE AS PER SPECIALIST
REQUIREMENT.
9. SOCKETS IN PUMPROOM, WET AREAS AND EXTERNAL AREAS SHALL BE
WEATHER PROOF.
10. PROVIDE 13A SWITCHED SOCKET FOR EACH LOW CURRENT CONTROL, STANDARD MOUNTING HEIGHTS OF ELECTRICAL ACCESSORIES
2 NTS
DEVICES i.e. FA PANEL, TELEPHONE CABINET ETC.
11. PROVIDE CABLE TRAY WITH COVERS FOR INSTALLATION WITHIN
PLANTROOMS AND ROOF. Ø20mm CONDUIT IN SLAB OR ON SLAB SSL
SOFIT FOR POWER CABLES. TO SWITCH
12. CEILING ROSE FOR LIGHT FITTINGS SHALL BE ACCESSIBLE THROUGH FALSE
20A. FLEX OUTLET
CEILING AREAS (60x60cm TILES). FINAL CONNECTION SHALL BE CARRIED CEILING SLAB CONCRETE INSERT
USING 110°C HEAT RESISTANCE 3Cx2.5mm2 WIRES TO EACH LIGHT FITTING. (TYPICAL) DUCTILE IRON COVER.
FINISHED GRADE [FOR SIZES REFER LAYOUT DRAWINGS]
13. WHERE FALSE CEILING IS GYPSUM TYPE, CEILING ROSE SHOULD BE W/H W/H CONCRETE SLAB
INSTALLED ON PROPER SUPPORT NEAR THE FITTING ABOVE FALSE CEILING. CONTROL FALSE CEILING
THE WIRE / CABLE SHOULD BE WITH EXTRA LENGTH FOR FLEXIBILITY. BOX
AS PER REQUIREMENT
uPVC DUCT FOR ELEC.SERVICE REFER
14. METER CABINET SHALL BE AS PER RAK STANDARDS. LAYOUT DRAWINGS FOR SIZES AND NOS.]
WIDTH OF CABLE TRAY DUCTS SHALL BE LAID WITH A PITCH OF
Ø20mm CONDUIT SUPPORT ROD TO
15. THE BREAKER AND CABLE SIZE SHOWN TO MECHANICAL EQUIPMENT IS HEAT RESIST. CABLE. AS REQUIRED 1:300 [PREFERABLY 1% SLOPE] TO DRAIN
IN SLAB OR ON SLAB (IN PVC FLEXIBLE CONDUIT) FLUSH MOUNTED/ RECESSED BE CUT IN FIELD
INDICATIVE. CONTRACTOR SHALL BE RESPONSIBLE TO FEED ALL THE AWAY FROM BUILDING / EQUIPMENT
SOFIT FOR POWER [KOPEX IN ELE.RM] TYPE DISTRIBUTION BOARD AS REQUIRED FROM BUILDING / EQUIPMENT TOWARDS
MECHANICAL EQUIPMENT AS PER THE ACTUAL LOCATION AND EXACT CABLES. TO SWITCH SPACING OF CABLES SHOULD MANHOLES.
FLUSH METAL BOX BE IN ACCORDANCE WITH THE
2000
LOAD REQUIREMENT FROM THE NEAREST DB'S/SMDB'S AND MCC'S GEOTEXTILE MEMBRANE
CABLE GLAND WITH REMOVABLE COVER SPECIFICATION
WITHOUT ANY VARIATION. KITCHEN NUT & LOCKWASHER GRAVEL FILL
BATH
16. ALL EQUIPMENT MOTORS SHALL BE PROVIDED WITH LOCAL ISOLATOR 20A. DP S/W PVC DUCT CHASED IN WALL (TYPICAL) WELL COMPACTED FOUNDATION SOIL.
FOR W/H
OR EMERGENCY LOCK PUSH BUTTONS, IF MOTORS ARE LOCATED AWAY REMOVABLE COVER Ø32 mm DRAIN PIPE SLOPE
CLEAR OPENING FILLED
FROM CONTROL PANELS. WITH SAND
17. STARTERS, VFD'S FOR EQUIPMENT SHALL BE PROVIDED BY THE FINISHED FLOOR LEVEL 00 2021.12.26 TENDER SUBMISSION iFT
1250
iFT 2021.12.26
GALVANIZED STEEL Healthcare Consultant:
CHANNEL SUPPORT
Eurohealth Systems
Healthcare Consultants
B 301 Dubai Healthcare City
WEATHERPROOF MECHANICAL PO Box 8703, Dubai - UAE
DISCONNECT SWITCH EQUIPMENT ISOLATOR Tel: +971.4.4281483 Fax: +971.4.4281482
WEATHER PROOF
MEP Consultant :
AS APPROVED BY ENGR.)
SINGLE CORE CABLES IN PVC COATED 100x50mm.G.I
GI FLEXIBLE WATERTIGHT CONDUIT GALVANIZED STEEL CONDUIT
TYPICAL
RIGID STEEL CONDUIT
SIZE AS REQUIRED * HEIGHT VARIES
ARMOURED CABLE WALL
PVC CONDUIT
* WEATHERPROOF
TERMINAL WC SOCKET OUTLET Client:
ROOFING SYSTEM BELL-END WITH
G.I PLATE. DUCT SEAL ASTER DM HEALTHCARE
COUPLER EXPANSION
200x200x8mm.THICK
ANCHOR BOLTS
TOP OF F.F.L Project:
STRUCTURAL SLAB
CONCRETE PAD
NOTE:- MEDCARE, KHAWANEEJ
25 mm sq. CONCRETE BASE
ALTERNATIVE MOUNTING ARRANGEMENT MAY BE
Y\G CONDUCTOR IN PVC-SNB UPS SIZE DEPEND SUBMITTED FOR ENGINEER'S APPROVAL.
Ø32mm sleeve ON CABLE SIZE Dwg Title:
POWER LAYOUT
EXTERNAL ISOLATOR MOUNTING DETAIL 9
WEATHER PROOF SOCKET OUTLET TYPICAL INSTALLATION DETAILS
8 NTS NTS
ELECTRICAL SUPPLY TO ROOF MOUNTED MECHANICAL EQUIPMENT
7 N.T.S
Issued for:
Drawing number:
EP-01 Revision: 00
GENERAL NOTES
This drawing is protected by copyright. This drawing is to be read in
conjunction with the relevant structural, mechanical and electrical drawings.
Dimensions are not to be scaled from this drawing. All works are to be
carried out in accordance with the relevant B.S. and codes of practice and
are also to meet the local authority requirements. The contractor and their
subcontractors are to verify all dimensions on site before making any shop
drawings and before executing the works.
UP
MALE
RECEPTION DESK
- - -D RI V E W A Y - - -
WAITING - - - - P A R K I N G AREA - - - -
GREEN
FEMALE
WAITING AREA(F)
WAITING MALE
- - - -PARKING - - - -
DERMA FAMILY MEDICINE RECEPTION
WAITING
RECEPTION AREA CONSULTATION ROOM 1 13.57 SQ.M RG-001 OPEN TO SKY
RG-002
DENTAL ROOM 13.55 SQ.M
18.61 sqm RG-015 RG-009
RG-010
RG-017
DBSH26-GF - - -D RI V E W A Y - - -
FEMALE
- - - - P A R K I N G AREA - - - -
GREEN
(EXISTING)
WAITING AREA
FEMALE
SMDB-CLINIC
WAITING (PROPOSED) GF-FCU-04
DB-CLINIC FCU
(PROPOSED)
EXISTING TREATMENT
ROOM 1
STORAGE PEDIATRIC
ROOM
7.60 SQ.M 13.1 SQ.M
ADA
& compressor
JANITOR FCU
RG-015 ROOM TOILET (M)
Suction
RG-003
Room
GF-FCU-02
FCU RG-007
TOILET ADA (F) RG-008
GF-FCU-01
DERMA 4.0 SQ.M
CONSULTATION
RG-011
ROOM 2
14.11 SQM
TREATMENT ROOM 2
RG-016
11.2 SQ.M
TREATMENT ROOM 4
FCU
GF-FCU-03 10.5 SQ.M
RG-013 GYNECOLOGY
13.00 SQ.M RG-004
TRIAGE ROOM PHYSIO
6KVA RG-006
7.55 SQ.M ROOM 1
TREATMENT / UPS 7.55 SQ.M
RG-014
SAMPLE SERVERUPS
ROOM TOILET (F)
4.1 SQ.M
RG-005
MEP Consultant :
2 TWIN SWITCHED SOCKET OUTLET
------
1 TELEPHONE & 1 DATA (FLOOR BOX)
1800mm FROM
DISTRIBUTION BOARD (DB)
TOP
Client:
SUB MAIN DISTRIBUTION BOARD (SMDB) ------
ASTER DM HEALTHCARE
’ MAIN DISTRIBUTION BOARD (MDB) ------
Project:
1 PHASE ISOLATOR
ADJACENT TO MEDCARE, KHAWANEEJ
UNIT/EQUIPMENT
Issued for:
Drawing number:
EP-02 Revision: 00
GENERAL NOTES
This drawing is protected by copyright. This drawing is to be read in
conjunction with the relevant structural, mechanical and electrical drawings.
Dimensions are not to be scaled from this drawing. All works are to be
carried out in accordance with the relevant B.S. and codes of practice and
are also to meet the local authority requirements. The contractor and their
subcontractors are to verify all dimensions on site before making any shop
drawings and before executing the works.
UP
- - - - P A R K I N G AREA - - - -
GREEN
RF-103 RF-102
- - - -PARKING - - - -
RELAXATION ROOM
13.74 SQ.M OPEN TO SKY
RF-104
20A TPN ISOLATOR FOR GF-ODU-04 - - -D RI V E W A Y - - -
- - - - P A R K I N G AREA - - - -
FEMALE
WAITING AREA
TERRACE
ROOM # 10
4.35 sqm
46.8 sqf
WAITING AREA
DB-SH26M
RF-101
(MODIFIED)
ADMIN ROOM
7.5 SQ.M
BIO MED.
ROOM # 11 RF-105
2 sqm
21.52 sqf
EXISTING PANTRY
ROOM # 12
5.7 sqm
STORAGE
2.19 sqm
23.56 sqf
61.33 sqf
’ Dwg Title:
MAIN DISTRIBUTION BOARD (MDB) ------
POWER LAYOUT
ADJACENT TO
1 PHASE ISOLATOR UNIT/EQUIPMENT FIRST FLOOR PLAN
ADJACENT TO
1 PHASE ISOLATOR W/P UNIT/EQUIPMENT
Scale: 1:100 A3 Created:
ADJACENT TO
3 PHASE ISOLATOR UNIT/EQUIPMENT Job no: DM 2100-16
ADJACENT TO Discipline:
3 PHASE ISOLATOR W/P
UNIT/EQUIPMENT
Issued for:
Drawing number:
EP-03 Revision: 00