0% found this document useful (0 votes)
25 views1 page

Schedule of Doors and Windows: Surigao Del Norte 2Nd District Engineering Office

Uploaded by

ohrelle galan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Schedule of Doors and Windows: Surigao Del Norte 2Nd District Engineering Office

Uploaded by

ohrelle galan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

7.60 3.

60
0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.60 0.60 0.60 0.60 0.60 0.60

0.53

0.53
0.53

0.53
2.05

2.05
1.00

1.00
w w
1 2
6mmTHK. CLEAR GLASS AWNING WINDOW ON 6mmTHK. CLEAR GLASS AWNING WINDOW ON
ANALOC ALUMINUM FRAME ANALOC ALUMINUM FRAME

4.60 3.30

0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.55 0.55 0.55 0.55 0.55 0.55

0.60 0.60
0.55

0.55
0.55

0.55
1.65

1.65

0.60
0.55

0.55

2.30
2.10
1.70

1.70

1.70
w
5
w w
3 4

6mmTHK. CLEAR GLASS AWNING WINDOW ON 6mmTHK. CLEAR GLASS AWNING WINDOW ON PVC DOOR ON PVC JAMB 6mmTHK. CLEAR GLASS SLIDING WINDOW
ANALOC ALUMINUM FRAME ANALOC ALUMINUM FRAME ON ALUMINUM FRAME

SCHEDULE OF DOORS AND WINDOWS


SCALE 1:50 MTS

PARAPET ( SEE DETAIL)


F F

F F F F

F F F F F F F F
3.60

F F F F F F F F F F F F

F A A A A A A A A A A A A A A F

5.06
F F F A A A A A A A A A A A A A A F F F
F F

F F F F F A A A A A A A A A A A A A A F F F F F

F F F F F F F F F F F F F F F F F F F F F F F F F F

10.38
5.33

5.29
8.33

3.00

RIGHT SIDE ELEVATION


SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED AND PREPARED : REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
CY.2023 PROJECT
REPUBLIC OF THE PHILIPPINES DETAILED ENGINEERING DESIGN PLAN FOR RIGHT SIDE ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REPAIR/ REHABILITATION OF SCHEDULE OF WINDOWS
REGION - XIII MULTI- PURPOSE BUILDING (MUNICIPAL
A 4
SURIGAODELNORTE GYMNASIUM),BRGY SAN PEDRO
SISON,SURIGAO DEL NORTE MICHAEL ANGELO D. GORGONIO RAUL L. PRECIADOS ROMMEL A. PIAPE DOHJIE B. MORALES, MPA MARCELINO M. OPERARIO
2NDDISTRICTENGINEERINGOFFICE 4 8 12
LOCATION: BRGY.SAN PEDRO,SISON, SURIGAO DEL NORTE ENGINEERING AIDE ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SURIGAO CITY SOURCE OF FUND: GAA 2023
APPROPRIATION: P DATE: DATE: DATE: DATE: DATE:

You might also like