0% found this document useful (0 votes)
12 views16 pages

Conso LTD

Uploaded by

MUSISI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views16 pages

Conso LTD

Uploaded by

MUSISI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

CONSOLIDATED CONTRACTORS LTD

COMPANY PROFILE

Plot 1328 Mbogo Road, Kisugu, Kibuli, P.O.Box 29569 Kampala


Tel: +256 772508545/ +256 776111422
Email: consoconts@gmail.com
CONSOLIDATED CONTRACTORS LTD

1 INTRODUCTION
1.1 Background

Consolidated Contractors Ltd is a Construction firm that was founded in 1999 by a team of
businessmen, engineering professionals as well as construction practitioners. The firm is a
limited liability company that is fully registered with the Uganda Registration Services
Bureau as No. 43012. The company’s principle Directors are as follows:

a) Mr. Wilson Kashaya


Contact: +256 792408486

b) Ms. Mary Grace Bakeine Mbabazi


Contact: +256 772508545

c) Ms. Asiimwe Annie


Contact: +256 776111422

1.2 Address and Location

The home of Consolidated Contractors Ltd is located at Plot No. 1328 Mbogo Road, Kisugu,
Kampala, Uganda. Our Strategic location (within 10 minutes from the City Centre) offers
excellent proximity between us and our prospective Clients. The firm’s head-office is not only
very spacious but is also surrounded by a wide expanse of parking space for the Company
fleet as well as Clients’ vehicles. Our full address is as follows:

Consolidated Contractors Ltd


Plot No. 1328, Mbogo Road, Kisugu
P.O. Box 29569,
Kampala
Email: consoconts@gmail.com

2 CONSTRUCTION SERVICES OFFERED

Consolidated Contractors Ltd is involved in a multi-disciplinary range of construction


services such as:

a) Road Construction and Maintenance, comprising of:


 Gravel and Bituminous road construction and maintenance;
 Construction of Bridges/ Intersections
2
CONSOLIDATED CONTRACTORS LTD

 Construction of weighbridges
 Street-lighting
b) Building Construction
 Concrete buildings and structures
 Masonry buildings and structures
 Steel structures
c) Water transmission:
 Construction of water-pumping stations
 Installation of water-pumps
 Construction of piped-water schemes
 Construction of gravity-flow water schemes
 Bore-hole construction

3 Our Mission, Vision and Values

3.1 Company Mission

Consolidated Contractors Ltd is a construction company dedicated to delivering


Construction projects, with focus on quality and time aspects, thus offering value for money
to our Clients.

3.2 Vision

We wish to see better infrastructure for all citizens in Uganda and across the globe. This
would transform into improved accessibility, higher serviceability of structures, wider
supply of safe water and improved public health.

3.3 Values

We are a community that upholds service above self, swift response to tasks, communication
and feedback, continuous improvement of work processes, proactiveness and career
development of its staff.

4 TECHNICAL CAPACITY

Consolidated Contractors Ltd employs a cross-section of experienced staff both on a full-time


basis as well as on Contract depending on Project demand. A comprehensive list of our full-
time staff as well as Associate/ Contract personnel is included under the section: “Technical
Personnel”.

3
CONSOLIDATED CONTRACTORS LTD

5 PLANT AND EQUIPMENT

The company owns a modest fleet of plant and equipment that is capable of executing a wide
range of road and building works. However, additional equipment may be hired from time
to time, depending on specific project requirements. A list of key equipment and plant that
is owned by Consolidated Contractors Ltd is included under the section for Plant and
Equipment.

6 EXPERIENCE RECORD

Consolidated contractors ltd has successfully executed several road and building projects
both locally and internationally. A comprehensive list of some of the projects where the
Company has been involved is included under Project References. Some of our completed
and on-going projects are presented in the following photographs:

4
CONSOLIDATED CONTRACTORS LTD

Construction of Kabuhuna Swamp Crossing

Term Maintenance of Kotido-Kapelimoru-Lopei and Ariamoi-Lopei Roads

Construction of Mayikalo Dam in Sembabule District

5
CONSOLIDATED CONTRACTORS LTD

Construction of 18.3km of Community Access Road in Kicuzi Sub-County, Ibanda

Periodic Maintenance of Kitgum-Kalongo- Patongo and Patongo-Lukee Roads

6
CONSOLIDATED CONTRACTORS LTD

COMPANY ORGANISATION STRUCTURE

Managing Director

Business
Development Contract Managers Administration
Manager

Technical
Finance/ Accounts
Managers

Pavement/ Water/ Public


Health, Safety and
Highways/ Health/ Structural
Surveyors Environmental
Geotechnical Environmental Engineers
Specialists
Engineers Engineers

Technicians/ Foremen

7
CONSOLIDATED CONTRACTORS LTD

CERTIFICATE OF INCORPORATION

TIN CERTIFICATE

TRADING LICENCE

PPDA CERTIFICATE

8
CONSOLIDATED CONTRACTORS LTD
EXPERIENCE IN CONSTRUCTION WORKS

Works performed as prime Contractor and references:

Name of Employer Description of Contract Total Contract Price Date of Completion


Civil Aviation Authority Grading and Construction UGX 1, 561,236,518 October 2020
Entebbe International of RESA for runway 17 and
Airport
35 at Entebbe International
Airport.

CAA/WRKS/18-19/00051

Uganda National Roads Term Maintenance Of 48 UGX 8,027,833,000 December 2018


Authority Selected National Roads – excluding VAT,
Phase V (21 Lots): Lot 11:
UGX 9,472,842,940
Ariamoi-Lopei (30km) And
including VAT
Kotido-Kapelimoru-Lopei
(72km).

UNRA/WORKS/2013-
14/00019/02/11

Uganda National Roads Periodic Maintenance of 44 UGX 3,270,240,200 September 2018


Authority Selected National Roads
(28 Lots) - Lot 24: Kitgum -
Kalongo - Patongo (77km)
& Patongo - Lukee (20km)
Roads.

UNRA/WORKS/2013-
14/00028/01/24

Uganda National Roads Periodic Maintenance of UGX 1,545,547,480 February 2018


Authority Selected National Unpaved
Roads, Totalling 489 Km
Lots 9 to 16; Lot 12: Moyo –

9
CONSOLIDATED CONTRACTORS LTD

Name of Employer Description of Contract Total Contract Price Date of Completion


Obongi (28km) From Km
0+000 To Km 28+000.

UNRA/WORKS/2013-
14/00015/12

Ministry of Works and Construction of Kabuhuna UGX 1,119,764,481 April 2016


Transport Swamp Crossing in Kibaale including VAT
District
WT/BRDG/DEV/010/13-
14

Ibanda Local Government Rehabilitation of 18.3Km of UGX 820,647,859 October 2015


Community Access Road in
Kicuzi Sub-county Ibanda
District under CAIIP-3
Batch A Lot 27.

Ministry of Water and Construction of Jezza, UGX 2,534,658,110 November 2013


Environment Katende and Kamengo
Rural Growth Centres in
Mpigi District

Civil Aviation Authority Ground Maintenance of UGX 823,947,038 February 2016


Entebbe International Upcountry Aerodromes, (Originally UGX
Airport North Eastern Region 726,149,650)
Comprising of Moroto,
Kidepo and Lira Airfields –
Lot 4.
CAA/WRKS/12-13/00011

Civil Aviation Authority Ground Maintenance of UGX 853,512,210 June 2018


Entebbe International Upcountry Aerodromes,
Airport North Eastern Region
Comprising of Moroto,
Kidepo and Lira Airfields –
Lot 4.
CAA/WRKS/14-15/00037

Civil Aviation Authority Ground Maintenance of UGX 173,566,483 October 2018


Upcountry Aerodromes,

10
CONSOLIDATED CONTRACTORS LTD

Name of Employer Description of Contract Total Contract Price Date of Completion


Entebbe International North Eastern Region
Airport Comprising of Moroto,
Kidepo and Lira Airfields –
Lot 4.
CAA/TENDER/2018

Civil Aviation Authority Re-gravelling at Kidepo UGX 296,120,528 November 2018


Entebbe International Airfield CAA/WORKS/15-
Airport 16/00064

Civil Aviation Authority Pavement Surface Dressing UGX 492,665,434 March 2015
Entebbe International at Apron 3- Entebbe
Airport International Airport.
CAA/WRKS/14-15/00012

Ministry of Water and Construction of Mayikalo UGX 1,162,466,180 June 2009


Environment, Directorate of dam in Sembabule District, (excluding taxes)
Water Development Uganda.

MWE/WRKS/07-
08/00209

Kampala City Council (now Upgrading of Gentex drive, UGX 1,320,753,240 June 2009
KCCA) Kyambogo Link, Road
Factory Drive and Factory
Lane in Nakawa Division.

KCC/HQ/RDS-01

11
CONSOLIDATED CONTRACTORS LTD

TECHNICAL PERSONNEL

Company Staff

No. Name Qualification Years of


relevant
experience

Contract Management Staff

1 Asiimwe Annie MSc Civil Engineering 11

BSc Civil Engineering

2 Lugemwa Peter BSc Civil Engineering 15

3 Sande William MSc Civil Engineering 15

BSc Civil Engineering

BSc. Quantity Surveying

Other Key Technical Staff

4 Mubiru Fredrick Master of Engineering 20

BSc. Civil Engineering

5 Robert Mulumba BSc. Building Economics 7

6 Sempebwa Dennis BSc. Civil Engineering 12

Higher Diploma in Building Economics

Higher Diploma (Building and Civil Engineering)

Ordinary Diploma (Building and Civil Engineering)

7 Tugume Moses BSc. Civil Engineering 12

8 Nowamani Norman BSc. Civil Engineering 8

Ordinary Diploma in Building and Civil Engineering

9 Okumu Richard BSc Civil Engineering 15

Ordinary Diploma in Building and Civil Engineering

12
CONSOLIDATED CONTRACTORS LTD
10 Kakaire David BSc. Civil Engineering 20

12 Nakanwagi Ritah Masters in Environment Management, 12

Bachelor’s Degree in Environmental Management,

Diploma in Environment Management for East Africa,

Certificate in Energy Management for Small and


Medium scale industries,

Certificate in Horticultural supply chain management

13 Andrew Nahabwe Bachelor’s Degree in Social Sciences – Makerere 12


University - 2010

Occupational Safety and Health Specialist Course –


OSH Academy Safety Institute, Oregon USA

Occupational Safety and Health Trainer Course – OSH


Academy Safety Institute, Oregon USA

Workplace First Aid – Uganda Safety Holdings - 2015

 Certificate in Monitoring & Evaluation.


(2008)

 Certificate in Peace Keeping & Conflict


Management. (2008)

 Certificate in Guidance & Counseling. (2009)

 Certificate in Investment Recruitment.


(2008)

 Certificate in Project Planning &


Management (2008)

14 Hassan Ssemere Degree in Social Sciences 5

Certificate in Reproductive Health

M and E fundamentals

Support Staff

1 Andreson Mukakanya Higher Diploma in Building Construction and 16


Engineering

13
CONSOLIDATED CONTRACTORS LTD
Ordinary Diploma in Architectural Draughtsmanship

2 Kwesiga Bright Higher Diploma in Civil and Building Engineering 8

Ordinary Diploma in Building and Civil Engineering

3 Maniraguha Bernard Ordinary Diploma in Building and Civil Engineering 25

Diploma in Instructors Education Certificate

Certificate in Blocklaying and Concreting Craft


Course Part I & Part II.

4 Olingha Robert Diploma in Land Surveying 8

5 Biimu Peter Diploma in Production and Mechanical Engineering 6

6 Kyeyune Rogers Ordinary Diploma in Building and Civil Engineering 18

7 Martin Oloyi Ordinary Diploma in Building and Civil Engineering 7

8 Nowembababzi Rechab Ordinary Diploma in Building and Civil Engineering 8

9 Kanyike Tonny Ordinary Diploma in Building and Civil Engineering 6

10 Abangira Nixon Ordinary Diploma in Water Engineering 16

11 Kato David Ordinary Diploma in Mechanical Engineering 11

12 Byaruhanga Francis Ordinary Diploma in Building and Civil Engineering 20

13 Mukuru Sylverio Higher Diploma in Construction (Building and Civil 24


Engineering)

Ordinary Diploma in Building and Civil Engineering

14 Kato Haruna Ordinary Diploma in Building and Civil Engineering 18

15 Mutebi John Mary Ordinary Diploma in Building and Civil Engineering 11

14
CONSOLIDATED CONTRACTORS LTD
PLANT AND EQUIPMENT

Item of equipment Description, make and Condition (new, good, Owned, or to be


year poor) and number purchased
available
Bull Dozers with rippers Make: CAT Good; 2No. Owned
No. plate: UAQ 978A
Capacity: 308 Hp
Year: 1999

Make: CATERPILLAR
No. plate: UAP 812N
Year: 1983

Graders Good; 2 No. Owned


Make: Hyundai
No. plate: UAP 774Z
Year: 1998

Make: Caterpillar
No. plate: UAP 922Z
Year: 2001

Excavator Make: Caterpillar Good; 1 No. Owned


No. plate: UAP 885Z
Year: 2001

Wheel loader Make: Hyundai Good; 1 No. Owned


No. plate: UAQ 928B
Year: 1998

Vibrating Roller (10 ton) Make: Roller Good; 2 No. Owned


Year: 2008
No. plate: UBE 254Z

Make: Roller
Year: 2008
No. plate: UBF 548F

Water Tankers Make: Mercedes Benz Good; 6 No. Owned


No. plate: UAN 128A
Year: 2001

15
CONSOLIDATED CONTRACTORS LTD
Item of equipment Description, make and Condition (new, good, Owned, or to be
year poor) and number purchased
available

Make: Mercedes Benz


No. plate: UAM 440Y
Year: 2001

Make: Mercedes Benz


No. plate: UAM 344Z
Year: 2001

Make: Mercedes Benz


No. plate: UAN 152A
Year: 2001

Make: Mercedes Benz


No. plate: UAN 230B
Year: 2001

Make: Mercedes Benz


No. plate: UAN 559A
Year: 2001
Dumpers Make: Mercedes Benz Good; 4 No. Owned
No. plate: UAM 244Z
Year: 2001

Make: Mercedes Benz


No. plate: UAN 225A,
Year: 2001

Make: Mercedes Benz


No. plate: UAN 530B,
Year: 2001

Make: Mercedes Benz


No. plate: UAM 630Y
Year: 2001

16

You might also like