COMPANY NAME:                                               DOCUMENT NO:
AHFA PRIVATE LIMITED COMPANY                                         PL/AHFA/08
`                  MACHINERY AND EQUIPMENT PREVENTIVE                          REVISION NO:01           PAGE:
                   MAINTANANCE PLAN
         Maintenance Plan
Description of   Item   Preventive maintenance        Preventive measure                          Frequency
machinery        no     check list
                 code                                                                                             ½
                                                                               day       week   month   quarter   year   year
Unit1:                  .clean the panel & AVR        .regularly dust the                          
 Panel Board            with air &cloths              exterior of the panel
and AVR                                               &AVR with a soft
(Automatic                                            cloth or brush
voltage                 .check all bus bar            .to check the loose                                                   
regulator)              connection input &output      connection
                        .check all circuit breakers   .to check the loose                                            
                        input &output connections     connection
                        .check any hot spot in        .to stop overheating           
                        panel                         by ensuring
                                                      ventilation is not
                                                      obstructed
                        .check all measuring          .to operate                                           
                        instruments                   according to load
                        .check all circuit breaker    .to improve the shelf                                          
                        load according to capacity    life of breaker
                        .check earth connection       .to remove the shock                                                  
                        with panel
                        .check any abnormal sound     .to ensure the                 
                        in panel                      normal operation
                        .check function of lamps &    .to know the                   
                        indicators                    working principles
                        .check general condition of   .addressing design                                    
                        the device                    issues
                        .check function of all        .to know the energy            
                        power meters before           efficiency overall
                        shutdown
                        .check the emergency &        .to ensure all                 
                        exit lighting systems         emergency lighting
                                                      fixtures are clean &
                                                      free from
                                                      obstructions
                        .Check that all labels are    .to identify and label                       
                        correct and in place          each circuit breaker
                 COMPANY NAME:                                                DOCUMENT NO:
                   AHFA PRIVATE LIMITED COMPANY                                          PL/AHFA/08
`                MACHINERY AND EQUIPMENT PREVENTIVE                           REVISION NO:01       PAGE:
                 MAINTANANCE PLAN
                    . Check locking devices on      .to replace by new                                     
                    electrical units for signs of
                    damage
                    .check alarms and remote        .to know any                       
                    alarm panels board              problem will be
                                                    happen
Unit 2:             .check the input & output       . to ensure that the                              
Boiler machine      power connection                power will be
                                                    available
                    .check all electrical           .to adjust the                                    
                    equipment working               equipment/replace it
                    properly
                    .check the water feeding        . to restore/replace it      
                    pump
                    .check all electrical           . to ensure the loose                             
                    connections                     connection
                    .check gas oil feeding          .to restore the                                   
                    pump                            pump/repair it
                    .check the rotational           .to restore the              
                    direction of each pump          direction
                    .check the emergency push       .replace the new             
                    button
                    .check the utility pump         . to restore the                                  
                                                    pump/repair it
Unit 3 :            .check visual inspection        .Verification that                         
Light & switch                                      the light & switch
                                                    are functional or not
                    .check function of all          .energy efficiency           
                    power meters before              over all
                    shutdown
                    .check to see that all          .to the evidence of          
                    heaters are energized &         working
                    operates                        functionally
                                                    .to the evidence of                                    
                    .Check cables &                 overheating &
                    connection                      weakening of the
                                                    insulation
                 COMPANY NAME:                                             DOCUMENT NO:
                   AHFA PRIVATE LIMITED COMPANY                                       PL/AHFA/08
`                MACHINERY AND EQUIPMENT PREVENTIVE                        REVISION NO:01       PAGE:
                 MAINTANANCE PLAN
                    .check the wattage or          .to replace the old                             
                    luminous intensity of the      one
                    light
                    .check the terminal boxes      .to ensure the loose                                     
                                                   connection
                    .check the top lid cover for   .to protect from any                                 
                    any damage                     dust or water for the
                                                   surface of top cover
                    .Check the rating power        .to ensures that the                                 
                                                   rate is equal or
                                                   higher than the
                                                   switch
                                                   .the switch needs to                            
                    .check the room                operate in a constant
                    temperature & environment      temperature & clean
                                                   environment
                    .check for dust & moisture     .to improve the shelf                    
                                                   life
                    .check the control power &     .to prove the lamps              
                    brightness                     lose brightness over
                                                   time
                    .Check general condition       .addressing design
                    of the device                  issues
                    . check for corrosion at the   .to produce smooth                                       
                    terminals                      and correct
                                                   operation
                    .check the inspect locking     .to replace the new                                  
                    devices for signs damage
                    or worn
Unit 4:             .check the input & output      .to ensure that the                             
Bottle blowing      power connection               power will be
machine                                            available
                    .check the main & all sub      .to ensure the                                  
                    breaker are functional         operation will be
                                                   functional
                    .check all fans work           .to change the                           
                    properly                       damage one
                    .check the rating voltage &    . the rating is not                                  
                    current                        under or over the
                                                   nameplate
                 COMPANY NAME:                                               DOCUMENT NO:
                   AHFA PRIVATE LIMITED COMPANY                                         PL/AHFA/08
`                MACHINERY AND EQUIPMENT PREVENTIVE                          REVISION NO:01       PAGE:
                 MAINTANANCE PLAN
                    .check the abnormal noise      .to restore                  
                    .check the heater              .to change the new if        
                                                   there is not work
                    . check any hot spot in        . to stop overheating        
                    panel
                    .check the emergency push      .to the evidence of                
                    button switch                  work/replace it
                    .check each electrical         . to ensure the loose                             
                    connection                     connection
Unit 5:             .check the input & output      .to ensure that the                               
Air                 power connection               power will be
washer/filling                                     available
machine             .check each conveyor           . to ensure that the                              
                    power connection               power will be
                                                   available
                    .check air inlets              .evidence of damage                        
                                                   caused by dirty,
                                                   loose part, or foreign
                                                   objects
                    . check the rating voltage     . the rating voltage is                                    
                                                   not under or over the
                                                   nameplate
                    .check the rotation            .to change the               
                    direction of each motor        direction
                    .check the vibration &         .to repair the shaft
                    temperature of dry motor       alignment
                    . check visual inspection      .verification that air                     
                                                   inlet are not blocked
                    .check the level switch        .to set the proper           
                    light indicator                position
                    .check each push button        .to the evidence of                
                    switch                         work
                    .check the air dry motor       .over heat/block dust                      
                    .check the power supply of     .the input & output                                    
                    each driver                    power
                    .check the tunnel sterilizer   .to solve if there is        
                    spry motor                     any problem
                     . check each motor            .to replace the new                        
                    rotation, fan cover &          & clean the dust
                    bearing
                    .check the power supply of     . to ensure that the         
                    laser machine & libeling       power will be
                    machine                        available
           COMPANY NAME:                                               DOCUMENT NO:
             AHFA PRIVATE LIMITED COMPANY                                         PL/AHFA/08
`          MACHINERY AND EQUIPMENT PREVENTIVE                          REVISION NO:01       PAGE:
           MAINTANANCE PLAN
              .check the conveyor motors     .to inspect the belt         
              are not over heat              tension & the shaft
                                             alignment
              .check the spray pump          .to repair the pump          
              work properly
              .check working of gearbox      .to the evidence of          
              motor                          working properly
              . check all measuring          . to operate                                           
              instruments                    according to load
              . Check cables &               . to the evidence of                                       
              connection                     overheating
Unit 6:       . check the input & output      to ensure that the                               
Blending      power connection               power will be
machine                                      available
              . check visual inspection of   . verification that air                    
              each pump                      inlet are not blocked
              .check bearing and             .to fill lubricant                                
              lubricant condition            level, and vibration
              . check the overall pump       .Imminent bearing                          
              vibration                      failure can be
                                             preceded by a
                                             change in bearing
                                             vibration
              .check the discharge pump      .to restore the pump         
              pressure
              .check the centrifugal         .to its intended                   
              pump flow rate                 design performance
              .check the discharging         . to ensure the cool                       
              pump fan                       down
              . check each mixer motor       .to the evidence of
                                             mixing properly
              .check the cip pump            .to ensure working           
                                             properly
              .check each circulation        .to ensure the flow          
              pump rotate direction
              .check the power               . to ensure the loose                             
              connection of the terminal     connection
              . check the oil analysis the   . the oil level is not                            
              mixer motor                    under & not over
                                             heat
              . check the Rotor balance      . Balance process                                          
                                             minimizes the out of
                                             balance of the rotor
                 COMPANY NAME:                                            DOCUMENT NO:
                   AHFA PRIVATE LIMITED COMPANY                                      PL/AHFA/08
`                MACHINERY AND EQUIPMENT PREVENTIVE                       REVISION NO:01       PAGE:
                 MAINTANANCE PLAN
                    .check the vacuum pump        .to restore the                          
                                                  pump
                    .check the insulation         .Perform IR check                                    
                    resistance                    between motor
                                                  leads and ground
                    . Stator visual Inspection    . Coil movement                                          
                    .check the temperature        .record bearing                                      
                    monitoring of bearings &      temperatures &
                    windings                      stator temperature
                                                  using thermo-
                                                  graphic imaging
                    .check the vibration of       .record & trend                                 
                    pump                          vibration levels
Unit 6:             . check the input & output    . to ensure that the                            
TIT sterilizer      power connection              power will be
machine                                           available
                    .check the discharging        . to restore the pump                    
                    pump
                    .check the rotor/Shaft        . balance weights                                        
                    visual inspection             properly secured
                    .check all electrical         .to repair loose                                
                    connection/motor              connections
                    .check every shaft rotation   .to repair the                                  
                    is normal                     alignment
                    .check cip turn back pump     .to restore the pump       
                    . check the circulation       .to restore the pump                            
                    pump
                    .check each electrical        .for the evidence of                                 
                    connections                   loose connection
Unit 7:             . check the input & output    . to ensure that the                            
Ro water            power connection              power will be
treatment                                         available
machine
                    . check the system            .inspect & clean                         
                    operations
                                                                                   
                    .check water meter            .record water
                    readings                      production
                    .check the pumping rate for   .to repair with in a                            
                    each                          nameplate
             COMPANY NAME:                                             DOCUMENT NO:
               AHFA PRIVATE LIMITED COMPANY                                       PL/AHFA/08
`            MACHINERY AND EQUIPMENT PREVENTIVE                        REVISION NO:01       PAGE:
             MAINTANANCE PLAN
                .Clean pump house             .the dust & mud                                       
                                              with in air & cloth
                .inspect for abnormal noise   .to restore & repair                      
                                              the alignment
                .check running amps on        .to run the pump
                pumps                         within the nameplate
                .check the secondary          . to restore the pump                                 
                booster pump
                . check the raw water pump    .to restore the pump              
                 .check the high pressure     .to restore the pump              
                pump
                 .check all electrical        .to repair loose                                 
                connections                   connections
                .check the sealing of the     .to repair the new                        
                pump
                .check the feeding pump       .to ensure the work         
                .check the high-water and     .to repair the                            
                low-water alarms              adjustment
                .check the cip pump           .to restore                               
                .check the secondary water    .to restore the pump                      
                feed pump
Unit 8:         . check the input & output    . to ensure that the                             
High & low      power connection              power will be
pressure                                      available
compressor      .check the running current    .to adjust with the                                   
                                              rating values
                .check each electrical        .repair the loose                                
                connections                   connection
                .check the rotational         .to restore the motor                     
                direction of motor            direction
                . check amps and voltage      .to restore within the      
                                              nameplate
                . Check display readings      .to adjust the real         
                                              display
                COMPANY NAME:                                              DOCUMENT NO:
                  AHFA PRIVATE LIMITED COMPANY                                        PL/AHFA/08
`               MACHINERY AND EQUIPMENT PREVENTIVE                         REVISION NO:01       PAGE:
                MAINTANANCE PLAN
                   .check the vibration of the   .to restore/repair the                            
                   screw motor                   damage
                   . Check temperature           .to protect overheat
                                                                              
                   .check the selector switch    .work functionally                 
Unit 9:            . check the input & output    . to ensure that the                              
Cooling tower      power connection              power will be
                                                 available
                   .check the circulation pump   .to repair/restore the                     
                                                 pump
                   .check the cooling fan        . to repair/restore the                           
                                                 motor
                   . check all electrical        . to repair loose                                 
                   connections                   connections
                   .visual inspect the           .to restore/repair it                             
                   rotational direction
                   .check the push button        .to repair the new           
                   switch