07/21/2005 23:35,
n
OCUMENTATION FOR DW-1 AN
\CKET KITS
iris Package contains FAA Certifications, Installation
[iatuctions, Assemb\y Drawing and Parts List: for both the
OW-1 and DW.2 Rudder Hinge Brackets,
che etter on page 3 constitutes FAA authorization to
Serpinate all inspections for cracks as required by AD 9S,
2403, This AD, made effective on 1/21/04, superceded
AD 92-15-06, which superceded AD $1-23-07, which
Superceded AD 80-11-04. These ADs all called for the
same dye-penetrant inspections of the rudder spar wet,
Tale Statement in the STC that AD requirements are not
aleve by the STC simply means that authonty for an
AD is outside of their department
Doe, llowing statement is fumished in accordance with
Dept. Of Transportation Order 81 10.48,
Signed,
PAGE
22PAGE 05
7/21/2005 23:36 11
INSTALLATION INSTRUCTIONS FOR
THE DW-1 UPPER HINGE BRACKET
OOOO
Wee aesamed thatthe bracket willbe installed at the time ofthe final dye-
{rst to allow better access to the 2 hinge bolts and nuts, and (b) bend the
piiginal bracket open to make it easier to remove the salely wires,
Following the inspection and stop-drling of any oracks in the sper web,
Proceed as follows (refer to the assembly drawing included)
}, Dril out 1st and Srd rivets from top, both sides of the rudder. Serew
heads are ilstrated al these locations in the drawing, Oo not rernove the
2nd rivets, shown slightly above the hinge center. Plage the DW.1 Bracke
in the spar, narrow end up, and insert the 2 exiginal screws, I they wort
inearae the bracket holes with @ 0.9 dril. H that isnt enough,
elongate One or both holes. with a rata file 10 obtain a fi. (On sone
rucders the nulplate rivets were misplaced, making this adjustment
ecessary). Tighlen the screws, Salety-wiring fs unnecessary.
2. Attach the OW.1 in place with the two AN- 502 screws that atached the
orginal bracket thu the spar web, Safety wiring is not necessary. ‘The 2
Nutplates on the back of the spar are the fiction (delomed) ype, These
ger carry hinge loads, but theyre sure convenient for
locating the DW1
siyeiame the flanges of the OW-1 Bracket so that the edges are paralel
in he odes of the spar. and ceil the bracket flanges thu the 4 sry
Skin holes wih a # 42 dil. Cleco as you go, Enlarge the holes wih tro
F, Feirstal the rudder. Tum the nosewhee! le and right and deflect the
rudder both ways against the stops, to verty that the madification dees ma
restrict rudder travel,
ris imedfcation adds 0.04 Ibs, at fuselage station 200.5 (same station
for both 38s and 26s). Tho 0.04 Ibs. is 0.55 in. aft ofthe hinoe inee7/21/2005 23:38 11
INSTALLATION INSTRUCTIONS FOR
EDI
THI MIDDLE HINGE BRACKET
alowing the inspection and stop-ciling ot any cracks in the spar web at
ihe middle hinge, proceed as follows (rotor ec the assembly drawing
included)
with no.9 dil. that isnt enough
meeanelle 10 obtain a ft. (On some ructore re,
wie aking ths adjustment necessary) The,
wiring is unnecessay
This modification adds 0.016 Ibs, at {fuselage station 286, 0.6 aft
Of the rudder hinge line. (The station whe Same for 23s and 96s,)
“8.
PAGE 06PASE 07
07/21/2005 23:36 11
| PAGE § of MASTER DRAWING LIST DW-100
ASSEMBLY DRAWING AND PARTS List.
ASSEMBLY ORAWING AND PARTS LIST.
3H
eM NO. REG. cone
Wt TOP RINGE BRACKET Ot eh
DW:2 CENTER MINGE BRACKET
AN Se5-8a.R6 SCREW. 6B
‘Ms 2042-08 NUT 8
‘AN 860-€ WASHER 7
{use washers a8 tequreg)
LUST OF REVISIONS
A
® FAA APPROVED
| JAN S 0 1995
102 Pro Alo Corl LOE