0% found this document useful (0 votes)
16 views3 pages

03 Solar Energy

solar energy

Uploaded by

Natalija Ristic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

03 Solar Energy

solar energy

Uploaded by

Natalija Ristic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Solar energy

Domestic hot water production


Measuring solar radiation • boiler support • protection against legionella

5 KIT
4 10
2 1
12
11 SA-2540
13
3
9 8

6
6

7 14

10
15

RESIDENCES • SCHOOLS • SPORT CENTRES • HOSPITALS • FACTORIES • HOTELS


2 3

Description

 DHW preparation and production system


 Selective start-up function of the installation with solar radiation (4) adjustable sensor
 Synchronism of primary (Up1) and secondary (Up2) pumps of the solar circuit
 Pump control (Up4) of boiler secondary in the absence of solar production
 adjustable pump control (Up5) and heat sink (9) for temperature excess in panels
 Solar energy meter (7) with accumulation values. Primary or secondary assembly
 Precise control of DHW consumption circuit with SUT actuator and valve (12), (13)
 Temperature elevation in the consumption circuit to protect form legionella
4
(external clock optional)
5
 Pre-configured, easy-to-use controllers 9
 Error prevention with connection diagram of all the integrated and documented elements
 Optional, the possibility of mean value sensors do avoid stratification in large tanks the

List of components
(1) One digital controller RDT100F002. 24 V~ power supply 6
(2) One temperature sensor. Panels with stainless-steel housing L = 120 mm.
EGT392F101/10364303120
(3) One temperature sensor. Solar DHW tank with brass housing L = 225 mm
EGT347F101/0364439225
(4) One solar radiation sensor SIB-SRS2000 with 0...2000 W/m² output
(5) One switching unit EXR101F001 with on/off output. 24 V~ power supply
(6) Two thermostats with brass housing L = 225 mm. RAK582.4/3728/0364439225
(7) One meter Q = 2.5 m³/h* with electronic calculator SIBE025120/SIBF2 230 V~ power supply 7
(8) One temperature sensor set. Flow/return SIBTL045 with stainless-steel housing. L = 50 mm
SIBTP50S 8
(9) One switching unit EXR101F001 with on/off output to heat sink. 24 V~ power supply
(10) One digital controller RDT100F002. 24 V~ power supply
(11) One temperature sensor. DHW production with brass housing L = 120 mm
EGT346F101/0364439120
(12) One electronic actuator with SUT technology, AVM125SF132. 24 V~ power supply
13
(13) One 3-way threaded valve DN40 Kvs = 25 m³/h -BUN040F300*, includes T-pieces
(14) One temperature sensor. DHW return with brass housing L = 120 mm EGT346F101/0364439120
12
(15) Five 2-contact relays for switching. 24 V~ coil
(16) One 230/24 V~ 2 A transformer.
(17) One power supply to radiation sensor 230/12 V =

* For other meter outputs or valve sizes, please enquire.


Solutions revised in accordance with the new RTE. (Royal Decree 1027/2007) Reproduction of this document, either in pat of in full, is not permitted.

11
15
14

www.sauter-controls.com 1
Solutions revised in accordance with the new RTE. (Royal Decree 1027/2007) Reproduction of this document, either in pat of in full, is not permitted.
Solar energy

DHW production and swimming pool temperature


Measuring solar radiation • Boiler support • Swimming pool heating • Anti-legionella prevention

5 KIT
4 2 1 10
12
SAP-2540
13 11
6 3
9

8
6

15 7 14

10

17

18

2 3
CAMPING GROUNDS • RESIDENCES • SPORT CENTRES • HOTELS • SPAS

Description
9
 Complete DHW preparation and production system with swimming pool heating supply
 Selective start-up function of the installation with solar radiation (4) adjustable sensor 5
 Synchronism of primary (Up1) and secondary (Up2) pumps of the solar circuit
 Pump control (Up4) of boiler secondary in the absence of solar production
 Adjustable heat sink control (9) and on/off of valves (15/16) for temperature excess in panels
4
 Solar energy counter (7) with accumulating values. Primary or secondary assembly
 Precise control of DHW consumption circuit with SUT actuator and valve (12/13)
 Temperature elevation in the consumption circuit to protect from legionella (external clock optional)
 Pre-configured, easy-to-use controllers
 Error prevention with connection diagram of all the integrated and documented elements
6

List of Components 17

(1) One digital controller RDT100F002. 24 V~ power supply


(2) One temperature sensor. Panels with stainless-steel housing L = 120 mm.
EGT392F101/10364303120
(3) One temperature sensor. Solar DHW tank with brass housing L = 225 mm
EGT347F101/0364439225
(4) One solar radiation sensor SIB-SRS2000 with 0...2000 W/m² output 7
8
(5) One switching unit EXR101F001 with on/off output. 24 V~ power supply
(6) Two thermostats with brass housing L = 225 mm. RAK582.4/3728/0364439225
(7) One meter Q = 2.5 m³/h* with electronic calculator SIBE025120/SIBF2 230 V~ power supply
(8) One temperature sensor set. Flow/return SIBTL045 with stainless-steel housing. L = 50 mm
SIBTP50S
13
(9) One switching unit EXR101F001 with on/off output to heat sink. 24 V~ power supply
(10) One digital controller RDT100F002. 24 V~ power supply
(11) One temperature sensor. DHW production with brass housing L = 120 mm 12
EGT346F101/0364439120
(12) One electronic actuator with SUT technology, AVM125SF132. 24 V~ power supply
(13) One 3-way threaded valve DN40 Kvs = 25 m³/h -BUN040F300*, includes T-pieces
(14) One temperature sensor. DHW return with brass housing L = 120 mm EGT346F101/0364439120
(15) Two 3-way threaded valves DN25 Kvs = 10 m³/h -BUN025F300*, includes T-pieces
(16) Two actuators on/off, AVM105F122. 24 V~ power supply
(17) One thermostat with stainless-steel housing L = 225 mm. RAK582.4/3728/0226811120
15
(18) Five 2-contact relays for switching. 24 V~ coil
(19) One 230/24 V~ 2 A transformer.
(20) One power supply to radiation sensor 230/12 V
16
* For other counter outputs or valve sizes, please enquire.

18
11

14

www.sauter-controls.com 2
Solutions revised in accordance with the new RTE. (Royal Decree 1027/2007) Reproduction of this document, either in pat of in full, is not permitted.
Solar energy

DHW Production, swimming pool temperature and water tank


Measuring solar radiation • Boiler support • Swimming pool heating • Anti Legionella Prevention

4
5
1
10 KIT
2
13 12 11 SAPS-252540
3
9 8 8

16 7 7 14

1
15 17
10
6

18

15
16

2 3
RESIDENCES • SCHOOLS • SPORT CENTRES • HOTELS • OFFICIAL BUILDINGS

Description
9
 Optimal DHW preparation and production system. Swimming pool heating and water tank.
 Selective start-up function of the installation with solar radiation (4) adjustable sensor. 5
 Synchronism of primary (Up1) and secondary (Up2) pumps of the solar circuit.
 Pump control (Up4) of boiler secondary in the absence of solar production.
 On/off valve control (15)(16) in order of priority once DHW production has occurred.
4
 Solar energy meter (7) with accumulating values. Primary or secondary assembly.
 Precise control of DHW consumption circuit with SUT actuator and valve (12)(13)
 Temperature elevation in the consumption circuit to protect from legionella (external clock optional).
 Pre-configured, easy-to-use controller.
 Error prevention with connection diagram of all the elements integrated and documented.
6

List of components 17

(1) One digital controller RDT100F002. 24 V~ power supply


(2) One temperature sensor. Panels with stainless-steel housing L = 120 mm.
EGT392F101/10364303120
(3) One temperature sensor. DHW solar tank with brass housing L = 225 mm
EGT347F101/0364439225
(4) One solar radiation sensor SIB-SRS2000 with 0...2000 W/m² output 7
8
(5) One switching unit EXR101F001 with on/off output. 24 V~ power supply
(6) Three thermostats with brass housing L = 225 mm. RAK582.4/3728/0364439225
(7) Two meters Q = 2.5 m³/h* with electronic calculator SIBE025120/SIBF2 230 V~ power supply
(8) Two temperature sensors set. Flow/return SIBTL045 with stainless-steel housing. L = 50 mm
SIBTP50S
13
(9) One switching unit EXR101FOO1 with on/off output to heat sink. 24 V~ power supply
(10) One digital controller RDT100F002. 24 V~ power supply
(11) One temperature sensor. DHW production with brass housing L = 120 mm 12
EGT346F101/0364439120
(12) One actuator with SUT technology, AVM125SF132. 24 V~ power supply
(13) One 3-way threaded valve DN40 Kvs = 25 m³/h -BUN040F300*, includes T-pieces
(14) One temperature sensor. DHW return with brass housing L = 120 mm EGT346F101/0364439120
(15) Four 2-way threaded valve DN40 Kvs = 10 m³/h -VUN025F300*, includes T-pieces
(16) Four actuators on/off, AVM105F122. 24 V~ power supply
(17) One thermostat with stainless-steel housing L = 225 mm. RAK582.4/372M/0226811120 15
(18) Five 2-contact relays for switching. 24 V~ coil
(19) One 230/24 V~ 2 A transformer.
(20) One power supply to radiation sensor 230/12 V
* For other valve sizes, please enquire. 16
NOTE: View our solutions for condensation boilers.

18
11

14

www.sauter-controls.com 3
Solutions revised in accordance with the new RTE. (Royal Decree 1027/2007) Reproduction of this document, either in pat of in full, is not permitted.

You might also like