Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Availbility of E STOP on machines 100 % provision on each machine + Conveyor, Labelled, visible and accessible 1 Week
               Are safety guards inplace for rotating parts.     Each rotatory part & exposed part must have safety guard on it.                                   Daily
  Machine
               Zero leakage                                      No oil leackage + No greasy + area clean from all side                                            Daily
Controll Penal Clean of oil & dirt + proper tagging pf switches Daily
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Presence of flammable material under cable tray No material at marked area. Daily
Are NRV available for welding torches welding torch must have NRVs. Daily
               Are all the welders are certifired                Certification training record.                                                                    Monthly
Welding Area
               Are the hose pipes , torches & cylinders are OK   Date of isnpection and reachange must be written in hoses                                         Daily
Is area clear of burnable material Zero burnable material near welindg lines + Hot surfaced machines. Daily
Is the stacking of material safe No broken pallet + safe straight stacking + no material plaement on walkways. Daily
               Walkways                                          No temporary material plaement on walkways. Keep all walkways open 24/7                           Daily
  Material
               Chemical Placement                                Working area floor must be 100% clean & clear                                                     Daily
Are the chemical placed safely in the area Each chemical must have MSDS+ SBU name + Placement in dip trays( secondary Containment) 1 Week
Are the PPEs available in the zone Welding goggles, Gloves, Close shoes. Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
House Keeping Spider webs cleaning Building corners and cable trays must be cleaned and free of webs 2 times a week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
                                                                 Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water leackage
               Dangue Visit                                                                                                                                        Daily
                                                                 of valves.
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. 2 times a week
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Monthly
                                                                          Zone Incharge
Signature
                                                                           HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Good conditions of electrical components(switches,sockets,plugs) Not broken , Earthing , No loose switches , no unnecessary switches Daily
Are all the electrcial connections in testing room OK. No damaged wire, all connections intacted not loose & safe. 1 Week
Safety Machine All the connections must be safe and 100% insulated Daily
Availbility of E STOP on machines 100 % provision on each machine + Conveyor, Labelled, visible and accessible 1 Week
               Competent persons working over there                                                    Operator must have attended Machine operators training with record.                             1 Week
  Machine
               Are safety guards inplace for rotating parts.                                           Each rotatory part & exposed part must have safety guard on it.                                 Daily
Heat Gun Must have proper stand to place after use + There must be no burnable material. Daily
Controll Penal Clean of oil & dirt + proper tagging pf switches Daily
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Presence of flammable material under cable tray No material at marked area. Daily
Is the stacking of material safe No broken pallet + safe straight stacking + no material plaement on walkways. Daily
               Walkways                                                                                No temporary material plaement on walkways. Keep all walkways open 24/7                         Daily
  Material
               Any attended tools or material on floor found                                           Working area floor must be 100% clean & clear                                                   Daily
Chemical Placement Each chemical must have MSDS+ SBU name + Placement in dip trays( secondary Containment) 1 Week
Are the PPEs available in the zone Safety gloves , close shoes Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
Housekeeping Spider webs cleaning Building corners and cable trays must be cleaned and free of webs 2 times a week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
                                                                                                       Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water leackage
Environment Dangue Visit                                                                               of valves.                                                                                      Daily
                                                                                       Zone Incharge
Signature
                                                                                        HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Electrical
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Electrical Equipment Make sure all the eelctrical equipment is switched of before closing office Daily
Last Person Out Maintain checklist at office entrance in which last person who left office will signs Daily
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire
Emergency Emergency Exit Keep the emergency open + each staff member must be informed about emergency exit. Daily
Walkways Keep the office walkways clean & clear 24/7. Daily
Area cleanliness Area arround & under the tables must be clean Daily
                                                                                                                                                        2 times a
Housekeeping   Spider webs cleaning                            Building corners and cable trays must be cleaned and free of webs                        week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
               Dangue Visit                                    Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water   Daily
                                                               leackage of valves.
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. Daily
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                         Zone Incharge
Signature
                                                                          HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
               Availbilty of warning signs & info on DBs          Electrical warning signs + SBU tag                                                       1 Week
  Electrical
               Wear and tear of electrical wires                  100% insulated wires, No loose wiring & connections.                                     Daily
Electrical equipment all the equipment cooling fans must be in working condition. Daily
               Good conditions of electrical                      Not broken , Earthing , No loose switches , no unnecessary switches                      Daily
               components(switches,sockets,plugs)
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Smoke detector Smoke detector must be installed in labs & must be in working Monthly
Is the stacking of material safe No broken pallet + safe straight stacking Daily
               Emergency lights                                   Emergency lights must be installed in labs and walkways related to Labs in 100% working 1 Week
                                                                  contdition
  Material
     +         Walkways                                           No temporary material plaement on walkways. Keep all walkways open 24/7                  Daily
   Tools
Tools Safety All long bit screw drivers & pliers must be 100% insulated for safe working Daily
Any attended tools or material on floor found Working area floor must be 100% clean & clear Daily
Are the PPEs available in the zone Gloves, Close shoes. Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
Housekeeping Spider webs cleaning                                 Building corners and cable trays must be cleaned and free of webs                        2 times a
                                                                                                                                                           week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
               Dangue Visit                                       Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water   Daily
                                                                  leackage of valves.
Environment Greean Area Management (From MRU to R32 boundaryLawn besides factory areas must be cleaned all the times. Daily
Manhole Cover (From MRU to R32 boundary) All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                          Zone Incharge
Signature
                                                                          HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Good conditions of electrical components(switches,sockets,plugs) Not broken , Earthing , No loose switches , no unnecessary switches 1 Week
                                                                                       All long bit screw drivers & pliers must be 100% insulated for safe working                                1 Week
                    Tools
Tools & Equipment
                    Electrical equipment                                                                                                                                                          1 Week
                                                                                       All the electrical equipments must have joint free cable + safety guards on rotating parts
                                                                                                                                                                                                  Daily
                    Material Placement                                                 Maintain good 6S of the area while placing material
    Material
                    Chemical Placement                                                                                                                                                            1 Week
                                                                                       No bulk storage of chemicals allowed only can keep need based chemical with MSDS at site
                    Fire Extinguishers & Fire Hydrant                                  24/7 accesible + equipment cleanliness                                                                     Daily
      Fire
                    ERT list                                                           Must be placed at visible point.                                                                           Monthly
Area cleanliness Area arround & under the tables & working platforms must be clean Daily
  Housekeeping      Spider webs cleaning                                               Building corners and cable trays must be cleaned and free of webs                                          2 times a
                                                                                                                                                                                                  week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
Are the PPEs available in the zone Welding goggles, Gloves, Safety Shoes, electrical gloves Daily
                    Dangue Visit                                                       Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water leackage of valves. Daily
  Environment
                    Greean Area Management                                             Lawn besides factory areas must be cleaned all the times. RO plants, R32 , LPG bulk storage yard, Air      Daily
                                                                                       wessels. Grass cutting etc
                                                                                              Zone Incharge
   Signature
                                                                                              HSE Incharge
                    Note:
                    1- Zone head must daily fill this checklist as per actual.
                    2- If a problem continues for 3 days must be informed to FM.
                    3- Safety Officer will counter check the status of filled check sheet .
                    4- Incase of missing of check sheet zone head will be acount as responsible.
                    5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Material placement under cable tray. No material at marked area. Daily
Availbility of E STOP on machines 100 % provision on each machine + Conveyor, Labelled, visible and accessible Daily
Competent persons working over there Operator must have attended Machine operators training with record. 1 Month
Machine Are safety guards inplace for rotating parts. Each rotatory part & exposed part must have safety guard on it. Daily
Zero leakage No oil leackage + No greasy + area clean from all side Daily
               Controll Penal                                  Clean of oil & dirt + proper tagging pf switches                                         Daily
                                                               Install copper discharge rod/plate entrance of paint booth + visble location+ Marking
               Discharge Point                                                                                                                          Dialy
               PPEs                                                                                                                                     Daily
                                                               Make sure each one in the booth must wear M3 face mask with filters.
                                                                                                                                                        1 Week
                                                               Must be in good condition.
 Paint Booth
                                                                                                                                                        1 Month
                                                               Must keep safety stock.
               No eatry allowed                                                                                                                         Daily
                                                               No one is allowed to eat or drink inside booth
               Lights & other equipment                                                                                                                   1 Month
                                                               All equipment installed in booth must be EX type ( Explosion Proof)
                                                               No broken cages + safe straight stacking not more than two cages + no material plaement on
               Is the stacking of material safe                walkways.                                                                                  Daily
               Walkways                                        No temporary material plaement on walkways. Keep all walkways open 24/7                  Daily
  Material
               Any attended tools or material on floor found   Working area floor must be 100% clean & clear                                            Daily
                                                               Each chemical must have MSDS+ SBU name + Placement in dip trays( secondary
               Chemical Placement                              Containment)                                                                             1 Week
Are the PPEs available in the zone Gloves, Close shoes. Daily
               Area cleanliness                                Area arround & under the conveyors must be cleaned 24/7                                  Daily
                                                                                                                                                        2 times a
House Keeping Spider webs cleaning                             Building corners and cable trays must be cleaned and free of webs                        week
               Electrical fan + ACs + Air Coolers Inspection   Must be cleaned + earthed + inspected weekly about connections                           Monthly
                                                               Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water
               Dangue Visit                                    leackage of valves.                                                                      Daily
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. Daily
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                          Zone Incharge
 Signature
                                                                          HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
               Availbilty of warning signs & info on DBs                          Electrical warning signs + SBU tag                                                                                1 Week
  Electrical
               Wear and tear of electrical wires                                  100% insulated wires, No loose wiring & connections.                                                              Daily
Lifter Charging Area Make sure barricades at area + Safe electrical connection+ no flammable material in the lifter charging area. Daily
Good conditions of electrical components(switches,sockets,plugs) Not broken , Earthing , No loose switches , no unnecessary switches 1 Week
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Material placement under cable tray. No material at marked area. Daily
Walkways No temporary material plaement on walkways. Keep all walkways open 24/7 Daily
Material Safe Stacking Make sure all the stacking is straight and not leaning with other stacks Daily
                                                                                  No bulk storage allowed + Make Sure pasting of MSDS of the chemical in the area + Make sure emergency spill control
               Chemical Placement                                                 tools.                                                                                                              1 Week
Any attended tools or material on floor found Working area floor must be 100% clean & clear + no packing strips on the floor. Daily
Are the PPEs available in the zone Gloves, Close shoes, Safety Helmets Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
House Keeping Spider webs cleaning Building corners and cable trays must be cleaned and free of webs 2 times a week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
Dangue Visit Make sure no stagnant water in any of the area outside & inside + Zero water leackage of valves. Daily
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. Daily
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                                               Zone Incharge
Signature
                                                                                               HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Good conditions of electrical components(switches,sockets,plugs) Not broken , Earthing , No loose switches , no unnecessary switches 1 Week
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Material placement under cable tray. No material at marked area. Daily
Availbility of E STOP on machines 100 % provision on each machine + Conveyor, Labelled, visible and accessible 1 Week
Competent persons working over there Operator must have attended Machine operators training with record. Monthly
Machine Are safety guards inplace for rotating parts. Each rotatory part & exposed part must have safety guard on it. Daily
Zero leakage No oil leackage + No greasy + area clean from all side Daily
Controll Penal Clean of oil & dirt + proper tagging pf switches Daily
Are NRV available for welding torches welding torch must have NRVs. Daily
               Are all the welders are certifired                                   Certification training record.                                                          Monthly
Welding Area
               Are the hose pipes , torches & cylinders are OK                      Date of isnpection and reachange must be written in hoses                               Daily
Is area clear of burnable material Zero burnable material near welindg lines + Hot surfaced machines. Daily
Material Walkways No temporary material plaement on walkways. Keep all walkways open 24/7 Daily
Any attended tools or material on floor found Working area floor must be 100% clean & clear Daily
Are the PPEs available in the zone Welding goggles, Gloves, Close shoes. Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
                                                                                                                                                                            2 times a
House Keeping Spider webs cleaning                                                  Building corners and cable trays must be cleaned and free of webs
                                                                                                                                                                            week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
                                                                                    Make sure no stagnant water in any of the area outside & inside + Zero water leackage
               Dangue Visit                                                                                                                                                 Daily
                                                                                    of valves.
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. Daily
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                                  Zone Incharge
 Signature
                                                                                  HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Zone Head___________________   Safety Officer(HSE) _______________________   Manager__________________
               HSE CHECK LIST MFG MACHINE SECTION
                                                                                                                                                                                           Zone Head:_________   Zone#_________
                                                                                                                                                                                                                                                                  Month__ Year___
                                                    DESCRIPTION                                                                 STANDARD                                       Frequency
                                                                                                                                                                                                                                                                                    Remarks
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Good conditions of electrical components(switches,sockets,plugs) Not broken , Earthing , No loose switches , no unnecessary switches 1 Week
Availbility of E STOP on machines 100 % provision on each machine + Conveyor, Labelled, visible and accessible 1 Week
Are safety guards inplace for rotating parts. Each rotatory part & exposed part must have safety guard on it. Daily
Zero leakage No oil leackage + No greasy + area clean from all side Daily
               Controll Penal                                                      Clean of oil & dirt + proper tagging pf switches                                         Daily
  Machine
               Are safety sensors of machines functional                           Each sensor must be in working condition.                                                Daily
Are all operators trained for machine operating Machine operator must have certification or training record. 1 Week
Machine rooms conditions Sufficient lighting + AC + Entrance exit area clear Daily
Are machines maintained according to PMP Must be displayed with machine. Monthly
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Presence of flammable material under cable tray No material at marked area. Daily
Are NRV available for welding torches welding torch must have NRVs. Daily
               Are all the welders are certifired                                  Certification training record.                                                           Monthly
Welding Line
               Are the hose pipes , torches & cylinders are OK                     Date of isnpection and reachange must be written in hoses                                Daily
Is area clear of burnable material Zero burnable material near welindg lines + Hot surfaced machines. Daily
Is the stacking of material safe No broken pallet + safe straight stacking Daily
               Walkways                                                            No temporary material plaement on walkways. Keep all walkways open 24/7                  Daily
  Material
               Any attended tools or material on floor found                       Working area floor must be 100% clean & clear                                            Daily
                                                                                   Each chemical must have MSDS+ SBU name + Placement in dip trays( secondary
               Chemical Placement                                                                                                                                           1 Week
                                                                                   Containment)
Are the PPEs available in the zone Welding goggles, Gloves, Close shoes. Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
                                                                                                                                                                            2 times a
               Spider webs cleaning                                                Building corners and cable trays must be cleaned and free of webs
                                                                                                                                                                            week
Housekeeping
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
                                                                                   Make sure no stagnant water for 1 day in any of the area outside & inside + Zero water
               Dangue Visit                                                                                                                                                 Daily
                                                                                   leackage of valves.
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. Daily
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                                  Zone Incharge
Signature
                                                                                  HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".
Flammable material near electrical DB 1.5 meters raidus must be clear. Daily
Locks and physical condition of electrical DB Locks Ok, No Rust , Tagging , Rubber Matt 1 Week
Electrical Availbilty of warning signs & info on DBs Electrical warning signs + SBU tag 1 Week
Wear and tear of electrical wires 100% insulated wires, No loose wiring & connections. Daily
Good conditions of electrical components(switches,sockets,plugs) Not broken , Earthing , No loose switches , no unnecessary switches 1 Week
Fire Extinguishers & Fire Hydrant 24/7 accesible + equipment cleanliness Daily
Fire Material placement under cable tray. No material at marked area. Daily
Walkways No temporary material plaement on walkways. Keep all walkways open 24/7 Daily
Material Safe Stacking Make sure all the stacking is straight and not leaning with other stacks Daily
                                                                                    No bulk storage allowed + Make Sure pasting of MSDS of the chemical in the area +
               Chemical Placement                                                   Make sure emergency spill control tools.                                              1 Week
Any attended tools or material on floor found Working area floor must be 100% clean & clear + no packing strips on the floor. Daily
Are the PPEs available in the zone Gloves, Close shoes, Safety Helmets Daily
Area cleanliness Area arround & under the conveyors must be cleaned 24/7 Daily
                                                                                                                                                                          2 times a
House Keeping Spider webs cleaning                                                  Building corners and cable trays must be cleaned and free of webs                     week
Electrical fan + ACs + Air Coolers Inspection Must be cleaned + earthed + inspected weekly about connections Monthly
                                                                                    Make sure no stagnant water in any of the area outside & inside + Zero water leackage
               Dangue Visit                                                         of valves.                                                                            Daily
Environment Greean Area Management Lawn besides factory areas must be cleaned all the times. Daily
Manhole Cover All the manholes in the area must be covered + Covers must not be fragile. Daily
                                                                                  Zone Incharge
 Signature
                                                                                  HSE Incharge
               Note:
               1- Zone head must daily fill this checklist as per actual.
               2- If a problem continues for 3 days must be informed to FM.
               3- Safety Officer will counter check the status of filled check sheet .
               4- Incase of missing of check sheet zone head will be acount as responsible.
               5- All good will be rewarded as "1" and problem will be rewarded as "0".