CUBICOST TIO WORKSHOP
INCORPORATING THE BIM MODEL INTO COST
ESTIMATION WITH CUBICOST TIO
www.glodon.com
Software
Operation
© All rights reserved to GLODON (HONG KONG) SOFTWARE LIMITED
1. BIM Trend
Main Content 2. Cubicost Principle-BIM Tool for QS
เนื้อหาหลัก
3. Revit Import Application
4. Q&A
BIM Trend
BIM AWARENESS
What is BIM BIM for Whole Lifecycle Different Dimensions of BIM
BIM & 5D BIM
3-DIMENSIONAL MODEL
Visualization of project,
Interdisciplinary,
How do we define 5D BIM Quantities.
in comparison with other
dimensions?
ASSET MANAGEMENT PLANNING AND
As-build BIM model, SCHEDULING
It allows a cost manager to Operation and Construction timeline,
collaboratively manage and Maintenance Simulation of production,
management logistics of execution
control the project cost with
the project team with a 3D
model in a more efficient
manner and per the
standard method of
measuerment.
SUSTAINABILITY COST AND ESTIMATION
Energy management, Estimating expenses, cash
Climate impact assessment flow, material management
Why 5D BIM ?
5D BIM Digital Cost Estimation Solution
One Focus Integrated Digital Solution
Real time data collaboration, flexibility to the information exchange and cost data
management for informed decision making.
Seamless Team Collaboration
Connect all stakeholders and streamline work process, to support remote
collaboration and coordination.
Common Data Centre Management
Granting the access to the right people to the right project through the secured
common data centre.
Embedded Measurement Rule for Accurate QTO
Intelligently built-in local measurement rules for faster, smarter and accurate
quantity takeoff aid with 3D visualization & validation.
Smart Reporting
Generate insightful quantity and costing reports with present or custom-made
template easily.
BIM TREND IN PHILIPPINES
Source: Adoption of Building Information Modeling (BIM) in the Philippines' AEC Industry: Prospects, Issues, and Challenges
Cubicost Principle-BIM Tool for QS
QS TOOLKIT FOR QUANTITY TAKEOFF
2D measurement with ruler and color pen.
How about 3D?
THE METHOD OF QUANTITY TAKEOFF
Quantity Takeoff
Start from 2D Start from 3D
PDF CAD IFC RVT
Quantity Report
INTRODUCTION OF CUBICOST
COST MODEL
Operation Approach (2D & 3D WAY)
Cubicost Takeoff for Architecture
and Structure TAS Number
Philippines rules Length
Area
Cubicost Takeoff for Rebar TRB
BS & C.O.P
1. Embedded
Calculation Rule
Cubicost Takeoff for Mechanical
and Electrical TME
SMM,DW144 etc.
4. Quantity
Cubicost Tender Series for Bill of Report
Quantity TBQ
3. 3D BIM
Auto-Formatting Model
2. Multi sources
Available Coverage across 2D Drawing & 3D BIM Model
Workflow of Cubicost TAS
Scanned
PDF / IPG Tracing Draw
2D
Drawing /
Vector PDF Auto-identify
Modeling + Rule
↑ Embedded with Measurement Rules ↑ Auto-Report-Generation
Auto-Calculation With One Click
Workflow of Cubicost TIO
Direct Import
IFC
RVT
Scanned
PDF / IPG Tracing Draw
Modeling + Rule
↑ Embedded with Measurement Rules ↑ Auto-Report-Generation
2D Auto-Calculation With One Click
Drawing /
Vector PDF Auto-identify
Workflow of RVT Direct Imported
Model
Calculation
Import RVT. File Mapping Process Checking
Floor Project Attributes
Whole Overlap
Quantity Report
Elements Model Check Partial Overlap
Others View Expression
Concrete Grade
Set Report Template
Local/Company Level SMM
In house Bulk Check Subcontractor
Import
Measurement rules/Setting (.CS/.BQGSP) Tower/Podium
Details Report
Standard Report
WHAT CUBICOST TIO SOLVES?
▪ Communication Cost (Modeling Approach);
▪ Learning Path (Difficulty);
▪ Localization (Measurement rules aligned)
Revit Import Application
© All rights reserved to GLODON (HONGKONG)
RVT Advantages
Model Completeness
Information & Data
Import BIM Model for QTO
Auto-mapping for the elements.
Auto-adjustment of the Model for QTO purpose.
Calculate
Model Check Calculate Quantity Quantity Check
a. Whole Overlap
Reversely-check
b. Partial Overlap Quantity Report
Model
c. Others
Calculation
Check which entities be overlapped in RVT
How to Process these overlapped entities in Cubicost
▪ Auto Process
▪ Error Report
▪ Force Calculate
EXCLUSIVE MODULE FOR CONSTRUCTION STAGE
Solution 1. Each trade
work is clearly
differentiated
with
distinctive
colors by
defaults.
Flexible 2. Now you can
select any
entity and
associate
trade work to
be included in
a
segmentation.
Progress Claim-1 : Formwork
3. Quantities are
segregated
Straight- and displayed
forward by
Progress Claim-2 : Concrete segmentation
s.
Simplify the project change process– Revision
1. Comparing
Solution
variances
over
drawings
automaticall
y
Flexible 2. Highlight
differences
with
dedicated
color to
assist
drawing
studies
3. Assist to
Straight- quickly
forward review and
narrow
down
drawing
changes,
mitigate
rework
CUBICOST – TIO PRODUCTIVITY
Let’s take a 50000 ㎡ Project as an example…
1 QS in 20 minutes
Element Overlapping
Measurement Rules
Revit Schedule Way 1 QS in 4 weeks +
Productivity & Efficiency: Same workforce to accomplish more.
REVIT SCHEDULE VS CUBICOST TIO
Structure(STR) Model Example
To be processed
Import RVT. File 1min Revit Schedule 5-mins Export
?
Whole Overlap (8)
Mapping Process 3 mins Checking 8+271 Overlap
Checking 8 hours Partial Overlap (271) Size & Formula
? ≈ 279mins(4.65 hours)
?
Adjustment 2 hours
Rules Application FWK? 7 Man-days+
Calculate 3 mins Total: 279 Elements
1.5 days 10+ Man-days Quantity Report
Full Report Traceable Quantity
Superstructure STR+ARC(40,000+ Element) ≈ 10+ times
POTENTIAL TRANSITION OF QS POSITION
WAY FORWARD
The requirement/value for a QS for BIM takeoff: not about knowing the
calculation rules, or master of the BIM modeling method.
But to have the knowledge, ability, and experience to analysis the BIM
model for quantity takeoff
Short-term & Mid-term: Do the BIM quantity takeoff
In the long run: consider linking to BQ for cost estimation as well.
MODELING APPROACH HANDLING