0% found this document useful (0 votes)
19 views2 pages

Thumb Rule of Estimate

thumb rule
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

Thumb Rule of Estimate

thumb rule
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Sl.No Contract Code & Name Cost Per Sq.

ft

(A) Consultants

1 Architectural Designing 21.85


2 Structural Designing 7.28
3 Services 13.11
4 Model Making 1.098
5 Plot Survey 0.13

Total 43.468

(B) Civil Works

1 Excavation 15.96
2 Anti termite treatment 0.1
3 Substructure Waterproofing 3.96
4 RCC Work, Blockwork, Plaster & Misc 966.76

Total 986.78

(C) Finishing Works

1 Flooring 142.01
2 Kitchen platform with sink 21.41
3 Enterance lobby & Signage 9.15
4 Wood works 67.81
5 Waterproofing 12.74
6 Gypsum Plaster 36.52
7 P.O.P. False Ceiling 6.49
8 External Painting 20.82
9 Internal Painting 21.26
10 Staircase painting 1.91
11 Lift shaft painting 0.34
12 Duct painting 2.53
13 Ceiling paint 7.62
14 Aluminium Window 46.19
15 M.S Railing 11.16
16 Facade Work 6.19

Total 414.15
% of the Total Cost

1.2
0.4
0.7
0.1
0

2.4

0.9
0
0.2
52

53.1

7.6
1.2
0.5
3.6
0.7
2
0.3
1.1
1.1
0.1
0
0.1
0.4
2.5
0.6
0.3

22.1