Rab Interior

RAB Renovasi Bangunan dengan Pajak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Rab Interior

RAB Renovasi Bangunan dengan Pajak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RENCANA ANGGARAN BIAYA

PEKERJAAN : REHABILITASI INTERIOR KANTOR BPN KABUPATEN BLORA


LOKASI : KANTOR PERTANAHAN BLORA
TAHUN : 2024

SAT KODE HARGA SATUAN PAJAK 11% JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME
PEK ANALISA (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 = (3x6)x11/100 8 = (3x6) + 7

I PEKERJAAN PERSIAPAN
1 Papan Nama 1.000 ls taksir Rp 150,000.00 Rp 16,500.00 Rp 166,500.00
3 Perlengkapan & Peralatan SMK3 1.000 unit SMKK.01 Rp 1,260,000.00 Rp 138,600.00 Rp 1,398,600.00
4 Pekerjaan Bongkaran 1.000 unit taksir Rp 5,000,000.00 Rp 550,000.00 Rp 5,550,000.00
JUMLAH PEKERJAAN PERSIAPAN Rp 7,115,100.00
II PEKERJAAN STRUKTUR
A Pekerjaaan Dinding
1 Sloof (S1) 15x20
- Pembesian 245.435 kg 2.2.1.1.3 Rp 16,371.96 Rp 442,008.44 Rp 4,460,266.99
- Bekisting 14.000 m2 2.2.1.3.3 Rp 130,486.40 Rp 200,949.06 Rp 2,027,758.66
- Cor Beton 2.100 m3 2.2.1.4.5 Rp 1,227,311.74 Rp 283,509.01 Rp 2,860,863.67

2 Kolom (K1,1) 15x15


- Pembesian 338.930 kg 2.2.1.1.3 Rp 16,371.96 Rp 610,384.32 Rp 6,159,332.73
- Bekisting 15.000 m2 2.2.1.3.3 Rp 130,486.40 Rp 215,302.56 Rp 2,172,598.56
- Cor Beton 0.120 m3 2.2.1.4.5 Rp 1,227,311.74 Rp 16,200.51 Rp 163,477.92

3 Balok (B1,1) 15x20


- Pembesian 245.435 kg 2.2.1.1.3 Rp 16,371.96 Rp 442,008.44 Rp 4,460,266.99
- Bekisting 10.500 m2 2.2.1.3.3 Rp 130,486.40 Rp 150,711.79 Rp 1,520,818.99
- Cor Beton 2.100 m3 2.2.1.4.5 Rp 1,227,311.74 Rp 283,509.01 Rp 2,860,863.67
JUMLAH PEKERJAAN FINISHING Rp 26,686,248.18
II PEKERJAAN FINISHING
A Pekerjaaan Dinding
1 Pasangan Dinding Bata; 1 Pc : 6 Ps 224.000 m2 3.6.4.2 Rp 130,239.67 Rp 3,209,105.47 Rp 32,382,791.55
2 Plesteran 1 Pc : 6 Ps Tebal 15 mm 448.000 m2 3.7.5 Rp 48,986.85 Rp 2,414,071.97 Rp 24,360,180.77
3 Acian 448.000 m2 3.7.8 Rp 37,702.50 Rp 1,857,979.20 Rp 18,748,699.20
4 Plesteran Skoning m1 3.7.10 Rp 45,314.06 Rp - Rp -
5 Pasangan Plint m2
Sub Jumlah Rp 75,491,671.52
A Pekerjaan Plafond
1 Pasang Plafond PVC, Termasuk Rangka Hollow Galfanis & Perkuatan m2 3.5.2.1.a Rp 187,257.40 Rp - Rp -
3 List Plafond PVC m1 Rp - Rp -
Sub Jumlah Rp -
A Pekerjaan Kusen
1 Pemasangan Kusen Pintu & Jendela Kayu Kelas I m1
2 Pemasangan Daun Pintu Panel Kayu Kelas I atau II m1
3 Pemasangan Daun Jendela Kaca Kayu Kelas I atau II
4 Pemasangan Kunci Tanam
5 Pemasangan Engsel Pintu
6 Pemasangan Engsel Jendela
7 Pemasangan Rel Pintu Dorong/Sliding
8 Pemasangan Grendel Pintu
9 Pemasangan Grendel Jendela
10 Kaca Polos 8mm
Sub Jumlah Rp -
A Pekerjaan Penutup Lantai dan Dinding
1 Urugan Pasir 5 cm
2 Rabat Beton Bawah Lantai
3 Pasang Granite Tile 60x60 Polish; Ex. Roman / setara
4 Pasang Granite Tile 60x60 Unpolish Toilet; Ex. Roman / setara
5 Pasang Keramik Lantai 20x20 Unpolish Toilet; Ex. Roman / setara
6 Pasang Keramik Dinding 20x20 Toilet; Ex. Roman / setara
7 Plint Lantai Granite 10 cm
8 Pasang Granite Tile Dinding 30x60; Ex. Roman / setara
9 Pasangan Batu Alam Eksterior
Sub Jumlah Rp -
A Pekerjaan Penutup Lantai dan Dinding
1 Cat Tembok Baru
2 Cat Kayu
Sub Jumlah Rp -
JUMLAH PEKERJAAN FINISHING Rp -