STRATEGY - 10
Purpose
This planning strategy is particularly useful in mass production environments; it is often combined
with repetitive manufacturing. You should choose this strategy if you want production to be
determined by a production plan (Demand Management) and if you do not want sales orders to
influence production directly. One of the most important features of this planning strategy is that it
enables you to smooth the demand program.
Examples from Industry
Strategy 10 is used in the customer packaged goods industry because it is possible to plan the
demand for ice cream very easily, for example, while a single order should not affect production.
Strategy 10 is also used for products with seasonal demand where production needs to be
smoothed.
Prerequisites
You must maintain the following master data for the finished product:
Strategy group 10 on the MRP screen.
Item category group (for example, NORM) on the Sales Organization screen.
Availability check field in Customizing so that you perform an availability check without
replenishment lead times (in the standard system, you must enter 01 here). For more information
see the Other Areas section below.
Process Flow
To start Make to Stock scenario by using following material.
      FA2023 – FERT Material
      SA2023 – HALB Material
      RA2023 – ROH Material
   Also, Create
          BOM (CS01, CS02, CS03)
          Work Center (CR01, CR02, CR03)
          Routing (CA01, CA02, CA03)
          Production Version (from MRP 4 view / C223)
Step 1 – Maintain Planning in Demand Management. (MD61)
To check the result in Stock Requirement List (MD04). _____Report
Step 2 – Run MRP Single Level, Multi Items. (MD02)
Step 3 – Go to Stock requirement list (MD04)_____Report
You will get PO Number.
Go to MD04 Screen & check the Result.
Pur.Req. Converted to Purchase Order.
Step 4 – Copy the PO number and make good receipt. (MIGO)
Refresh the MD04 screen, you will see the stock uploaded.
Step 5 – Same process for SFG material.
Refresh the MD04 screen, you will see that planed order has been release now.
Step 6 – Confirmation of production order. (CO11N)
Refresh the MD04 screen, the stock of SFG material has been uploaded.
Step 7 – Do same process for FG material.
Refresh the MD04 screen, Production Order has been release.
Step 8 - Confirmation of production order. (CO11N)
Refresh the MD04 screen, the stock of FG material has been uploaded.
Step 9 – Check the report for Stock Overview (MMBE)._____Report