0% found this document useful (0 votes)
33 views32 pages

Installation Instructions - CLN 3G

Uploaded by

nhan.bui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views32 pages

Installation Instructions - CLN 3G

Uploaded by

nhan.bui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

INSTALLATION INSTRUCTIONS

CLINICAIR
Chilled water / Direct expansion
& CONDENSING UNIT
Direct expansion
2

CONTENTS

I.CLINICAIR INSTALLATION INSTRUCTIONS 3


1. CLINICAIR placement 4
2. CLINICAIR assembly 6
2.1. Feet installation 6
2.2. Assembly of the CLINICAIR consisting of several 7
parts
2.3. CLINICAIR installation on the plenum 8
3. Condensate drain connection and cleaning 9
4. Hydraulic connection 10
5. Connection and placement of probes and servomotor 12
6. Electric connection 19
7. Installation of filters and external panels 20

II.CONDENSING UNIT INSTALLATION INSTRUCTIONS 22


1. Mounting 22
2. Refrigeration connections 24
2.1. Connection diameters 24
2.2. Particular case: Condensing unit located at the top 24
of CLINICAIR
3. Electrical connections of condensing units 25
4. Problems and solutions for CLN & Condensing Unit 28

PACKAGING CLINICAIR 31

Installation instructions CLN V3


3

I.CLINICAIR INSTALLATION INSTRUCTIONS


Switch cabinet can be placed on the left or on the right side of the unit.

Air Intake Air Supply


Air Supply Air Intake
Switchboard Switchboard
on the right on the left

Switch cabinet on the right side of CLN BD Switch cabinet on the left side of CLN BD

Attention: All plans of this manual are valid for the units with switch
cabinet on the left side.

For the units with switch cabinet on the right side air intake and air supply
are reversed as well as maintenance access for CLN BD
(See picture above).

To view the configuration of the switch cabinet refer to the individual


specifications of CLINICAIR®.

The installation must be carried out taking into account the following:

Access for maintenance from individual front panels (see unit plans).
Thermal and sound insulation of the ducts.
Installation of flexible sleeves at the air intake and air supply.
Installation of the unit with the help of adjustable feet provided with the unit.
Do not stand the unit against the wall to avoid any vibration.
Do not leave the cables on the floor under the switch cabinet.
If CLINICAIR® is placed on the floor provide ventilation of the switch cabinet.
If CLINICAIR® is isolated from the treated area by the reverberant wall made
of laminated plaster or wood, precautions must be taken to eliminate
reverberant effect. Contact an acoustic specialist.

Installation instructions CLN V3


4

1. CLINICAIR PLACEMENT
Air Supply

Flexible sleeve

Wall

Air Intake

Adjustable
Flexible sleeve feet

ATTENTION: CLN 6 - 8 - 12 are delivered in two parts.

• If air intake and air supply sections are reversed:

1. Connect condensate drain pipe as shown below :

Installation instructions CLN V3


5

2. Connect the antifreeze thermostat (if present) to the coil section as shown below:

Installation instructions CLN V3


6

2. CLINICAIR ASSEMBLY

2.1. Feet installation

Install the adjustable feet


provided with CLINICAIR

Installation instructions CLN V3


7

2.2. Assembly of the CLINICAIR consisting of several parts


(beginning from the model CLN6)

Put silicon
on the inside
of the sleeve

• Put silicon on the frame when


in contact with both parts.
• Connect the 2 parts with the
nuts/ bolts supplied.
• Put silicon on the inside of the
flexible sleeve.
• Connect electrical cables of
the 2nd compartment to the
domino of PVC cabinet in the
1st compartment (Electrical
heater, motor fan, antifreeze
thermostat…) using special
cable passes.
Antifreeze
thermostat

Installation instructions CLN V3


8

2.3. CLINICAIR installation on the plenum (Models AD)

CLINICAIR must be mounted on


the plenum in such a way that
condensate tray (in plenum) and
coil compartment (in CLINICAIR)
face each other.

Metallic frame is delivered


fixed on the plenum.
Before mounting it must be
taken away and placed on
the outer part of CLINICAIR.
Attention: fixation elements
on the frame help to fix
cover panels.

Installation instructions CLN V3


9

3. CONDENSATE DRAIN CONNECTION AND CLEANING


Connect the condensate drain respecting the diameters indicated on the connection
plug of CLINICAIR

Condensate drains and cleaning are


connected to the bottom of the unit on
the right or left side from the side of
switch cabinet (see technical notice).
Male connector 1” (26x34).

Installation instructions CLN V3


10

4. HYDRAULIC CONNECTION
Chilled water and hot water connections (CLNW):
• Hydraulic connections are located at the top of the CLINICAIR on the switch
cabinet
side.
• Input/output location must comply with the indications at the top of the unit.
• Shutoff valves must be installed at the outside of the unit.
• Balancing valve must be installed at air return.
• Pipes must be isolated with appropriate insulating material.

The diameters of chilled water/ hot water connections are indicated on CLINICAIR
plan.

Water supply connection of humidifier:


• Hydraulic connection is located at the top of the Clinicair® on the switch
cabinet
side.
• Shutoff valve must be installed at the outside of the unit.
• Connection diameter 1/2” male (15x21)

Humidifier must be supplied with tap water and must have the following
characteristics:
• Pressure: 1 to 8 bars, temperature: 1 to 40 °C
• Conductivity interval: 125 ... 1250 μS
• No organic components

Water supply characteristics must correspond to the limits specified below:

LIMIT VALUES OF IMMERSED ELECTRODE HUMIDIFIER SUPPLY WATER (NORMAL)

Limits
Min Max
Hydrogen ion activity pH 7 8,5
Specific conductivity at 20 °C σR, 20°c µS/cm 350 1250
Total dissolved solids CR mg/l (*) (*)
Fixed residue at 180 °C R180 mg/l (*) (*)
Total hardness TH mg/l CaCO3 100 400
Temporary hardness mg/l CaCO3 60 300
Iron + Manganese Mg/l Fe + Mn = 0,2
Chloride ppm Cl = 30
Silica mg/l SoO2 = 20
Residual chlorine mg/l Cl- = 0,2
Calcium sulphate mg/l CaSO4 = 100
(*)Values dependent on specific conductivity; In general: cR ≈ 0,65 * σR,20 °C; R180 ≈ 0,93 * σR,20 °C

Installation instructions CLN V3


11

LIMIT VALUES OF IMMERSED ELECTRODE HUMIDIFIER SUPPLY WATER (LAW SALTED)

Limites
Min Max
Hydrogen ion activity pH 7 8,5
Specific conductivity at 20 °C σR, 20°c µS/cm 75 350
Total dissolved solids CR mg/l (*) (*)
Fixed residue at 180 °C R180 mg/l (*) (*)
Total hardness TH mg/l CaCO3 50 160
Temporary hardness mg/l CaCO3 30 100
Iron + Manganese mg/l Fe + Mn = 0,2
Chloride ppm Cl = 20
Silica mg/l SoO2 = 20
Residual chlorine mg/l Cl- = 0,2
Calcium sulphate mg/l CaSO4 = 60
(*)Values dependent on specific conductivity; In general: cR ≈ 0,65 * σR,20 °C; R180 ≈ 0,93 * σR,20 °C

WARNING: There is no definite link between water hardness and water conductivity.

IMPORTANT WARNING: Do not use water softeners! They will cause


foaming leading to potential disfunctionning.

AVOID:
• Use of well water, cooling circuit water, chemically or bacteriologically
polluted water.
• Adding disinfectants or anticorrosive components into water as they are
potentially irritant.

Installation instructions CLN V3


12

5. CONNECTION AND PLACEMENT OF PROBES AND


SERVOMOTOR

Temperature and
humidity probes once
installed at air intake duct
must be connected with
connecting cables to the
CLINICAIR switch box
according to electric
diagram.

See probe installation


Intake probe details below.

Air intake
ATTENTION :

Install air intake probes


in airflow direction
BEFORE fresh air duct.

Fresh air

Correct probe placement Incorrect probe placement


Intake probe (affected probe)
Air intake Air intake

Fresh air probe Intake probe Fresh air probe


Fresh air Fresh air

CLN CLN

Installation instructions CLN V3


13

Temperature probe once


installed at air supply
duct must be connected
with connecting cables to
the CLINICAIR switch
box according to electric
diagram.

See probe installation


details below.

OPTION: FRESH AIR


MOTORISED DAMPER

The damper and


servomotor with
motorised limit switch
once installed at fresh air
duct must be connected
with connecting cables to
the CLINICAIR switch
box according to electric
diagram.

See probe installation


details below.

Installation instructions CLN V3


14

Number of probes depending on operation mode

RECYCLING MODE
Control Temperature Humidity Combined probe
system probe probe T° / HR
Carel 1 0 1
Saia 2 1 0
Siemens 1 0 1

100% FRESH AIR MODE


Control Temperature Humidity Combined probe
system probe probe T° / HR
Carel 3 0 1
Saia 4 1 0
Siemens 3 0 1

Probe connection

Temperature and humidity probe cables must not be placed near


220/380 V power cables or remote switch cables in order to avoid the risk
of error caused by electromagnetic couplings.

INTAKE PROBE

Run the screened cable (2 pairs or 1 pair) between CLINICAIR® and the probe.
Connect following the diagram :

Carel PCO3 Control system

12 8 11 9

Installation instructions CLN V3


15

Saia PCD3 Control system

Siemens Climatix Control system

24 25 23 22

SUPPLY PROBE (if not premounted)


Run 1 pair screened cable between CLINICAIR® and the probe.
Connect following the diagram :

15 16

Installation instructions CLN V3


16

Fresh air damper connection

CLINICAIR® can be equipped with fresh air damper with mechanical return to zero
and limit switch (option).
Connect following the diagram :

123 124 50 51

Installation instructions CLN V3


17

Alarm connection and other options

Alarm

NO/NC voltage-free contact is available to forward the alarm.

Remote Start/Stop
One input is available to start or stop CLINICAIR® at a distance.
NO contact supplied with 24V.
The contact is opened when CLINICAIR® is stopped.

Installation instructions CLN V3


18

Fire detection

One input is available to disconnect CLINICAIR® in case of the fire (alarm appears
on PCO display).

NC contact supplied with 24V

CLINICAIR® operation indication

Dry potential-free contact is available to show that CLINICAIR is in operation.


The contact is opened when CLINICAIR® is stopped.

Installation instructions CLN V3


19

6. ELECTRIC CONNECTION
Power connection
CLINICAIR® must be supplied with 400V + N + T 50Hz, with clap ring D curve
protection of appropriate size.

To determine appropriate protection refer to the performance table in


CLINICAIR® electric diagram (see separate technical file).

Run the power cable from


switchboard to CLINICAIR
and connect it according
to electrical diagram (take
into account the size of
electrical protection
indicated in connection
instructions)

Installation instructions CLN V3


20

7. INSTALLATION OF FILTERS AND EXTERNAL PANELS

Unpack and install the filters


using the foam seal (provided
in the box inside CLINICAIR).
The joint must be glued on
the filter to ensure a tight seal
with metal chassis.

Installation instructions CLN V3


21

Install CLINICAIR cover


panels

Every panel has locking tabs


at the lower part which slip in
the CLINICAIR support; 2
locking tabs are also located
at the top to provide good
panel fixation.

Installation instructions CLN V3


22

II. CONDENSING UNIT INSTALLATION INSTRUCTIONS

1. MOUNTING

Take into account minimum spaces


around the unit to provide good air
circulation and access for
maintenance

The unit must be installed on the flat


surface and mounted on anti-
vibration blocks

Installation instructions CLN V3


23

Remove the restrictor located on the


liquid valve of the unit

Install the dryer and sight glass on


liquid line of the unit
(provided by the customer)

Installation instructions CLN V3


24

2. REFRIGERATION CONNECTIONS

2.1. Connection diameters (See connection instructions)

2.2. Particular case: Condensing unit located at the top of


CLINICAIR

Provide an oil trap at the upflow


and every 3 meters at suction in
case of vertical upflow to the unit
compressor

Maximum drop-off is of 21 meters

If the upflow is more than 6 meters,


provide 2 tubes for suction and 1
tube for liquid line

Installation instructions CLN V3


25

3. ELECTRICAL CONNECTIONS OF CONDENSING UNITS


(CLNX)

Electrical connections

Power : Refer to the connection


instructions for power cable section

Control : Cable section 5G 1,5²


2 wires for working
Power
1 wire for error
To CLN
Control

3-phase 400V Condensing Unit


1st Circuit

Run 5 conductor power cable (contact us to know the section) between CLINICAIR®
and condensing unit to supply it with electricity

Connect the condensing unit to the outputs 118 –119 –120 –121 and the ground in
case of Carel control system (see the diagram for other control systems)

Run the 5G1,5² control cable between CLINICAIR® and condensing unit

Connect the control to the outputs 3 - 6 of condensing unit and 58 – 59 of the


CLINICAIR® in case of Carel control system (see the diagram for other control
systems)

Connect the alarm to the output 5 of condensing unit and 36 of CLINICAIR® in case
of Carel control system (see the diagram for other control systems)

Installation instructions CLN V3


26

2nd Circuit

Run 5 conductor power cable (contact us to know the section) between CLINICAIR®
and condensing unit to supply it with electricity

Connect the condensing unit to the outputs 122 –123 –124 –125 and the ground in
case of Carel control system (see the diagram for other control systems)

Run the 5G1,5² control cable between CLINICAIR® and condensing unit

Connect the control to the outputs 3 - 6 of condensing and 60 – 61 of the


CLINICAIR® in case of Carel control system (see the diagram for other control
systems)

Connect the alarm to the output 5 of condensing unit and 37 of CLINICAIR® in case
of Carel control system (see the diagram for other control systems)

Installation instructions CLN V3


27

Installation instructions CLN V3


28

4. PROBLEMS AND SOLUTIONS FOR CLN &


CONDENSING UNIT (DIRECT EXPANSION)

Installation instructions CLN V3


29

Installation instructions CLN V3


30

Installation instructions CLN V3


31

PACKAGING CLINICAIR
To protect the CLINICAIR during transport, two types of packages are available.

Above a CLINICAIR with normal packaging. The normal packing comprises a


polystyrene sheet of 2 cm thick.

It is possible to have a reinforced packaging for transporting your CLINICAIR. The


packaging has a reinforced polystyrene sheet 3 cm thick, or two sheets of 2 cm
overlap

Installation instructions CLN V3


32

ATA SAS
16 rue Jules Verne
44700 ORVAULT
TEL : 02.40.92.03.00
FAX : 02.40.92.08.22

AGENCE ILE DE FRANCE


4 rue Maryse Bastié
91430 IGNY
TEL : 01.69.41.94.94
FAX : 02.40.92.08.22

E-mail : contact@ataclimatisation.com
Web: www.ataclimatisation.com

Installation instructions CLN V3

You might also like