0% found this document useful (0 votes)
29 views1 page

CPHL Ship Operation: Purchase Requisition

Uploaded by

Ashik Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

CPHL Ship Operation: Purchase Requisition

Uploaded by

Ashik Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CPHL Ship Operation

Head Office : Awal Center (17th Floor), 34, Kemal Ataturk Avenue, Banani C/A, Dhaka-1213, Bangladesh
Plant Address : Chittagong, Bangladesh
PURCHASE REQUISITION

Purchase Requisition (Site Purchase)

SPR NO : CSO/2024/PR02874

Date : 16-10-2024 3:24 PM

Priority : High
To, Purchase Department
Type Of Purchase : Site Purchase

Please purchase the following items: Estimated Time Required - 16-10-2024 Approved Date :

Amd Approve Date :

Last Purchase
SL Part Required Approved Unit Total Stock In
Product Description Unit MRR Unit Total Remarks/Purpose
No No. Qty Qty Price Price Date Quantity Hand
No Price Price
1 Anchor Windlass Distribution - Set 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.0 A breaker was burned. Need servicing
Board
2 Emergency Service Board - Set 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.0 ESB to MSB line breaker switched off automatically. May be
(ESB) current was overloaded
Grand Total: 0.00

Requirement For : Operation


Cost Head : B. Variable Plant Overhead - 45.Repair & Maintenance-Service - 45.h. RM Service-Unschedule
Remarks : OT. GCSA BU-2

Initiator S-HOD HOD PM PM-OPS SCM COO


Mohammad Ashikur Mohammad Ashikur Mohammad Ashikur
Assistant Engineer Assistant Engineer Assistant Engineer
(shipbuilding) (shipbuilding) (shipbuilding)

Print Date: 16-10-2024 04:26 PM Page 1 of 1