0% found this document useful (0 votes)
26 views8 pages

Blok Existing Week 40

Uploaded by

M Fahri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views8 pages

Blok Existing Week 40

Uploaded by

M Fahri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Periode : 29 Sep 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati

Week : 40

29 Sep 2024 30 Sep 2024 01 Oct 2024 02 Oct 2024 03 Oct 2024 04 Oct 2024 05 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR A MH OPR A MH OPR B MH OPR B MH OPR C MH OPR C MH OPR D MH
ST1.0, HRSG & AUXILIARY HOUR
R-005 Test AOP, TOP & EOP (ST NOP).
4 Week 1 2 2 2
Start Stop AOP, JOP, EOP, TOP dan Turning Motor ST 1.0 [RSH]
R-008 Putar Cuno Filter MOT ST 4 Week 0.5 2 1 1
R-015 Regenerasi H2 Dryer ST 1.0 2 Week 1 2 2 2
R-018 Tes Run Condenser Vacuum Pump #A 3 Week 1 2 2 2
R-022 Tes Run HP BFP #A 8 Week 0.25 2 0.5 0.5
R-023 Tes Run HP BFP #B 8 Week 0.25 2 0.5 0.5
R-024 Tes Run HP BFP #C 8 Week 0.25 2 0.5 0.5
R-025 Tes Run HP BFP #D 8 Week 0.25 2 0.5 0.5
R-034 Tes Run CEP #A 8 Week 0.25 2 0.5 0.5
R-036 Back Wash CEP Strainer #A 24 Week 1 2 2 2
R-038 Tes Run CCCWP #A 6 Week 1 2 2 2
R-039 Tes Run CCCWP #B 6 Week 1 2 2 2
R-048 Check Brush Excitation 1 Week 1 2 2 2
R-049 Check Brush Grounding 1 Week 1 2 2 2
R-050 Change Over AC PWC #A standby 2 Week 1 2 2 2
R-051 Change Over AC PAC lantai 1 dan 2 #A standby 2 Week 1 2 2 2
R-053 Test Run AC PAC #B lantai 3 2 Week 1 2 2 2
R-054 Test Emergency Diesel Generator - Blok Existing (Pembebanan ST 1.0) 1 Week 1 2 2 2
ST2.0, HRSG & AUXILIARY
R-071 Operation of CTCS Condensor 1 Week 2 5 10 10
R-073 Test Run CCWS #B 2 Week 1 2 2 2
R-075 Test Run ACWP #B 2 Week 1 2 2 2
R-079 Test Run JOP #2 ST 2.0 4 Week 1 2 2 2
R-080 Test Run MOP #1 ST 2.0 2 Week 1 3 3 3
R-082 Tes Run EOP 2 Week 1 3 3 3
R-083 Tes Run Motor Collecting Oil Pump 2 Week 1 3 3 3
R-084 Test Run Vapour Oil Exhauster #1 2 Week 1 2 2 2
R-086 Test Run Condenser Vacuum Pump #1 2 Week 1 2 2 2
R-089 Test Run Ven Steam Condensor #2 2 Week 1 2 2 2
R-090 Test Run HP BFP #A 3 Week 1 2 2 2
R-093 Test Run AOP HP BFP #A 3 Week 0.25 2 0.5 0.5
R-096 Test Run LP BFP #A 3 Week 1 2 2 2
R-099 Test Run CEP #A 3 Week 1 2 2 2
R-104 Check Brush Grounding 1 Week 1 2 2 2
R-107 Test Emergency Diesel Generator ST2.0 1 Week 1 2 2 2
R-109 Simulasi Penanganan Blackout Blok Existing TW 4 Regu D 12 Week 1 8 8 8
R-111 Test Run CPH Pump 2.1 #B 2 Week 1 2 2 2
R-113 Test Run CPH Pump 2.2 #B 2 Week 1 2 2 2
R-115 Test Run CPH Pump 2.3 #B 2 Week 1 2 2 2
R-127 Purifikasi Hydrolic Oil HPH STG 2.0 1 Day 2 2 4 2 2 2 2 2 2 2
Inspeksi & Cleaning Y Strainer Heat Exchanger Vacuum Pump #A
R-128 2 Week 0.5 2 1 1
Flushing (Filling & Drain Air Separator)
GT & AUXILIARY
R-134 Tes Run JOP #A GT 1.2 1 Week 1 2 2 2
R-135 Tes Run JOP #B GT 1.2 1 Week 1 2 2 2
R-137 Tes Run JOP #B GT 2.1 4 Week 1 2 2 2
R-139 Tes Run JOP #B GT 2.2 4 Week 1 2 2 2
R-141 Tes Run JOP #B GT 2.3 4 Week 1 2 2 2
R-147 Start Stop Turning dan Pelumasan GT 1.2 [RSH] 3 Day 1 3 3 1 1
R-151 Test Run Package Air Vent #A GT 1.2 4 Week 0.5 2 1 1
R-152 Test Run Package Air Vent #B GT 1.2 4 Week 0.5 2 1 1
R-153 Test Run Package Air Vent #C GT 1.2 4 Week 0.5 2 1 1
R-170 Check Brush Excitation 1 Week 1 2 2 2
R-171 Check Brush Grounding 1 Week 1 2 2 2
R-173 Test Running MFOP GT 1.2 8 Week 1 2 2 2
R-177 Test Running FOTP #A Block I 8 Week 1 2 2 2
R-178 Test Running FOTP #B Block I 8 Week 1 2 2 2
R-181 Test Run FSNL GT 1.2 Bahan Bakar Gas 8 Week 0.5 4 2 2
R-185 Test Run FSNL GT 1.2 Bahan Bakar Minyak 16 Week 0.5 4 2 2
R-189 Drain manual strainer sweep air valve GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-190 Drain manual strainer sweep air valve GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-191 Drain manual strainer sweep air valve GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-192 Drain manual strainer sweep air valve GT 2.3 [RSH] 1 Week 0.5 2 1 1
R-193 Drain manual header udara instrumen GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-194 Drain manual header udara instrumen GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-195 Drain manual header udara instrumen GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-196 Drain manual header udara instrumen GT 2.3 [RSH] 1 Week 0.5 2 1 1
AUXILIARY COMMON
R-206 Inspeksi Strainer Lube Water Screen Wash Pump #A 4 Week 1 2 2 2
R-212 Inspeksi Strainer Lube Water Sea Water Feed Pump #A 4 Week 1 2 2 2
R-213 Operation Test of F/F motor driven (Fresh Water) 1 Week 1 2 2 2
R-214 Operation Test of F/F diesel engine (Fresh Water) 1 Week 1 2 2 2
R-215 Operation Test of F/F motor driven (Sea Water) 1 Week 1 1 1 1
R-216 Operation Test of F/F diesel engine (Sea Water) 1 Week 1 1 1 1
R-217 Test Run MCWP #A (Blok 2) 1 Week 1 2 2 2
R-218 Test Run MCWP #B (Blok 2) 1 Week 1 2 2 2
R-219 Test Run Revolving Bar Screen dan Flush pump #A (Blok 2) 1 Week 1 2 2 2
R-220 Test Run Revolving Bar Screen dan Flush pump #B (Blok 2) 1 Week 1 2 2 2
R-221 Test Run Auxiliary Boiler 4 Week 2 2 4 4
1 of 8
Periode : 29 Sep 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 40

29 Sep 2024 30 Sep 2024 01 Oct 2024 02 Oct 2024 03 Oct 2024 04 Oct 2024 05 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR A MH OPR A MH OPR B MH OPR B MH OPR C MH OPR C MH OPR D MH
ST1.0, HRSG & AUXILIARY HOUR
R-224 Pengantian Seal Water Chlorinatian Plant (Blok 1) 1 Week 1 1 1 1
R-225 Pengantian Seal Water Chlorinatian Plant (Blok 2) 1 Week 1 1 1 1
R-232 Cleaning VAF Filter System & Injection Chlorine To Line Sea Water EC 2.0 (Blok 2) 1 Week 1 2 2 1 1
R-241 Operation Test of F/F Jockey Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-242 Operation Test of F/F Motor Driven (Fresh Water) Blok 2 1 Week 1 2 2 2
R-243 Operation Test of F/F Diesel Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-244 Tes Run Make Up Water Pump #A (Blok 1) 4 Week 1 2 2 2
R-248 Tes Run Service Water Pump #A (Blok 1) 6 Week 1 2 2 2
R-250 Test Run Service Water Pump #A (Blok 2) 6 Week 1 2 2 2
R-253 Test Run Auxiliary Service Water Pump #B (Blok 2) 6 Week 1 2 2 2
R-259 Operation Test of Blower, Agitator dan Scrapper WWTP 3 Day 1 2 2 2 2
R-260 Test Run Sedimentation Pump dan Sludge Enrichment Pump 3 Day 1 2 2 2 2
R-268 Penyesuaian List Redundent Asset dengan Kondisi Aktual 1 Week 0.5 2 1 1
HOUSE KEEPING (HK) & FIRST LINE MAINTENANCE (FLM) (DAY)
A-049 HK ST 2.0 LT.1 (VACUUM PUMP - WATER BOX VACUUM PUMP - SWAS & CHILLER)
FLM [ASSET 2] CONDENSER VACUUM PUMP A/B
FLM [ASSET 2] CHILLER UNIT 15 Week 7 5 A A A A A A A
FLM [ASSET 2] WATER BOX VACUUM PUMP A/B
A-050 HK ST 2.0 LT. 1 (CCWS - ACWS - IAC & RECEIVER TANK)
FLM [ASSET 2] ST CLOSED COOLING WATER PUMP #A/B 15 Week 7 5 B B B B B B B
FLM [ASSET 2] AUX COOLING WATER PUMP A/B
A-051 HK ST 2.0 LT. 2 (MOT - JACKING OIL PUMP - OIL CLEANING UNIT)
FLM [ASSET 2] EMERGENCY LUBE OIL PUMP
FLM [ASSET 2] MAIN LUBE OIL PUMP 1 15 Week 7 5 C C C C C C C
FLM [ASSET 2] MAIN LUBE OIL PUMP 2
A-052 HK ST 2.0 LT. 2 (LP & HP HPU - AUX. STEAM - LP & HP TBV)
FLM [ASSET 2] HP HPU TURBINE BYPASS CONTROL VALVE
FLM [ASSET 2] LP HPU TURBINE BYPASS CONTROL VALVE 15 Week 7 5 D D D D D D D
FLM [ASSET 2] HP BYPASS HPU TANK
FLM [ASSET 2] LP BYPASS HPU TANK

SUB TOTAL WORK HOURS 31 26.5 26 14 43.5 18 25

FLM

SUB TOTAL WORK HOURS 0 0 0 0 0 0 0


TOTAL MAN HOUR 160 160 160 160 160 160 160
Keterangan Man Hour tidak siap
Cuti/Sakit 0 0 0 0 0 0 0
Meeting/SPPD 0 0 0 0 0 0 0
TOTAL WORK HOURS 31 26.5 26 14 43.5 18 25

Available manhours 160 160 160 160 160 160 160


Workhours 31 26.5 26 14 43.5 18 25
% workhours thdp available manhours 19% 17% 16% 9% 27% 11% 16%

2 of 8
Periode : 06 Oct 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 41

06 Oct 2024 07 Oct 2024 08 Oct 2024 09 Oct 2024 10 Oct 2024 11 Oct 2024 12 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR D MH OPR A MH OPR A MH OPR B MH OPR B MH OPR C MH OPR C MH
ST1.0, HRSG & AUXILIARY HOUR
R-011 Change Over Seal Oil Cooler #A Standby 15 Week 1 2 2 2
R-019 Tes Run Condenser Vacuum Pump #B 3 Week 1 2 2 2
R-048 Check Brush Excitation 1 Week 1 2 2 2
R-049 Check Brush Grounding 1 Week 1 2 2 2
R-052 Test Run AC PAC #A lantai 3 2 Week 1 2 2 2
R-054 Test Emergency Diesel Generator - Blok Existing 1 Week 1 2 2 2
R-068 Pengecekan N2 Exhaust Damper HRSG 1.2 5 Week 1 2 2 2
R-069 Test Open Close Diverter Damper HRSG 1.2 [RSH] 5 Week 1 2 2 2
ST2.0, HRSG & AUXILIARY
R-071 Operation of CTCS Condensor 1 Week 2 5 10 10
R-072 Test Run CCWS #A 2 Week 1 2 2 2
R-074 Test Run ACWP #A 2 Week 1 2 2 2
R-076 Operation of CTS Heat Exchanger 4 Week 1 2 2 2
R-077 Change Over Lube Oil Cooler #B Standby 15 Week 1 2 2 2
R-081 Test Run MOP #2 ST 2.0 2 Week 1 3 3 3
R-085 Test Run Vapour Oil Exhauster #2 2 Week 1 2 2 2
R-087 Test Run Condenser Vacuum Pump #2 2 Week 1 2 2 2
R-088 Test Run Ven Steam Condensor #1 2 Week 1 2 2 2
R-091 Test Run HP BFP #B 3 Week 1 2 2 2
R-094 Test Run AOP HP BFP #B 3 Week 0.25 2 0.5 0.5
R-097 Test Run LP BFP #B 3 Week 1 2 2 2
R-100 Test Run CEP #B 3 Week 1 2 2 2
R-103 Test Run Air Compressor #B 4 Week 1 2 2 2
R-104 Check Brush Grounding 1 Week 1 2 2 2
R-106 Test Run AHU #2 4 Week 1 2 2 2
R-107 Test Emergency Diesel Generator ST2.0 1 Week 1 2 2 2
R-108 Performance Tes Unit Blok II Beban Maksimum 1 Month 2 2 4 4
R-110 Test Run CPH Pump 2.1 #A 2 Week 1 2 2 2
R-112 Test Run CPH Pump 2.2 #A 2 Week 1 2 2 2
R-114 Test Run CPH Pump 2.3 #A 2 Week 1 2 2 2
R-116 Test Run Blowdown Pump 2.1 #A 6 Week 1 2 2 2
R-118 Test Run Blowdown Pump 2.2 #A 6 Week 1 2 2 2
R-120 Test Run Blowdown Pump 2.3 #A 6 Week 1 2 2 2
R-127 Purifikasi Hydrolic Oil HPH STG 2.0 1 Day 2 2 4 2 2 2 2 2 2 2
Inspeksi & Cleaning Y Strainer Heat Exchanger Vacuum Pump #B
R-129 2 Week 0.5 2 1 1
Flushing (Filling & Drain Air Separator)
GT & AUXILIARY
R-134 Tes Run JOP #A GT 1.2 1 Week 1 2 2 2
R-135 Tes Run JOP #B GT 1.2 1 Week 1 2 2 2
R-142 Putar Filter JOP dan OST (All GT) 2 Week 1 2 2 2
R-147 Start Stop Turning dan Pelumasan GT 1.2 [RSH] 3 Day 1 3 3 1 1
R-154 Test Run Package Air Vent #A GT 2.1 4 Week 0.5 2 1 1
R-155 Test Run Package Air Vent #B GT 2.1 4 Week 0.5 2 1 1
R-156 Test Run Package Air Vent #C GT 2.1 4 Week 0.5 2 1 1
R-169 Test Run Compressor & Manual Pulshing IAF Blok II 4 Week 1 2 2 2
R-170 Check Brush Excitation 1 Week 1 2 2 2
R-171 Check Brush Grounding 1 Week 1 2 2 2
R-172 Test IAC GT Block II 2 Week 1 2 2 2
R-189 Drain manual strainer sweep air valve GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-190 Drain manual strainer sweep air valve GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-191 Drain manual strainer sweep air valve GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-192 Drain manual strainer sweep air valve GT 2.3 [RSH] 1 Week 0.5 2 1 1
R-193 Drain manual header udara instrumen GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-194 Drain manual header udara instrumen GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-195 Drain manual header udara instrumen GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-196 Drain manual header udara instrumen GT 2.3 [RSH] 1 Week 0.5 2 1 1
R-199 Tes Run Close Cycle Cooling Water Pump #C 6 Week 1 2 2 2
AUXILIARY COMMON
R-208 Test Run Travelling Screen #A 2 Week 0.5 2 1 1
R-209 Test Run Travelling Screen #B 2 Week 0.5 2 1 1
R-210 Tes Run Sea Water Feed Pump #A 6 Week 1 2 2 2
R-213 Operation Test of F/F motor driven (Fresh Water) 1 Week 1 2 2 2
R-214 Operation Test of F/F diesel engine (Fresh Water) 1 Week 1 2 2 2
R-215 Operation Test of F/F motor driven (Sea Water) 1 Week 1 1 1 1
R-216 Operation Test of F/F diesel engine (Sea Water) 1 Week 1 1 1 1
R-217 Test Run MCWP #A (Blok 2) 1 Week 1 2 2 2
R-218 Test Run MCWP #B (Blok 2) 1 Week 1 2 2 2
R-219 Test Run Revolving Bar Screen dan Flush pump #A (Blok 2) 1 Week 1 2 2 2
R-220 Test Run Revolving Bar Screen dan Flush pump #B (Blok 2) 1 Week 1 2 2 2
R-224 Pengantian Seal Water Chlorinatian Plant (Blok 1) 1 Week 1 1 1 1
R-225 Pengantian Seal Water Chlorinatian Plant (Blok 2) 1 Week 1 1 1 1
R-232 Cleaning VAF Filter System & Injection Chlorine To Line Sea Water EC 2.0 (Blok 2) 1 Week 1 2 2 1 1
R-233 Test Run Sea Water Booster Pump #A Chlorination Plant (Blok 2) 4 Week 1 2 2 2
R-235 Test Run Air Blower #A (Blok 2) 4 Week 1 2 2 2
R-237 Test Run Shock Dosing Pump (Blok 2) 4 Week 1 2 2 2
R-238 Test Run Continues Dosing Pump (Blok 2) 4 Week 1 2 2 2
R-241 Operation Test of F/F Jockey Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-242 Operation Test of F/F Motor Driven (Fresh Water) Blok 2 1 Week 1 2 2 2
R-243 Operation Test of F/F Diesel Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-247 Test Run Demin Water Pump #B (Blok 2) 4 Week 1 2 2 2
3 of 8
Periode : 06 Oct 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 41

06 Oct 2024 07 Oct 2024 08 Oct 2024 09 Oct 2024 10 Oct 2024 11 Oct 2024 12 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR D MH OPR A MH OPR A MH OPR B MH OPR B MH OPR C MH OPR C MH
ST1.0, HRSG & AUXILIARY HOUR
R-255 Tes Run of Yard IAC #B 4 Week 1 2 2 2
R-259 Operation Test of Blower, Agitator dan Scrapper WWTP 3 Day 1 2 2 2 2
R-260 Test Run Sedimentation Pump dan Sludge Enrichment Pump 3 Day 1 2 2 2 2
R-262 Backwash Filter #B WWTP 6 Week 1 2 2 2
R-268 Penyesuaian List Redundent Asset dengan Kondisi Aktual 1 Week 0.5 2 1 1
HOUSE KEEPING (HK) & FIRST LINE MAINTENANCE (FLM) (DAY)
A-053 HK ST 2.0 LT. 2 (BREAKER 6KV, PDC, MCC,VFD - HVAC - RUANG BATTERY)
FLM BREAKER 6 KV HP FWP A/B/C; MCWP A/B; CEP A/B/C
FLM HVAC 15 Week 7 5 A A A A A A A
FLM RUANG BATERY
A-054 HK ST 2.0 LT. 3 (HPU - AREA GENERATOR - AREA TURBIN)
FLM [ASSET 2] GENERATOR ST 2.0
FLM [ASSET 2] HYDRAULIC OIL TANK OF HPH 15 Week 7 5 B B B B B B B
FLM [ASSET 2] PIPING, VALVE, AND INSTRUMENTATION OF HPH SYSTEM
A-055 HK ST 2.0 LT. 3 (VENT STEAM CONDENSOR - LP BOV - HP BOV)
FLM [ASSET 2] HP LIVE STEAM ISOLATION MOTOR VALVE
FLM [ASSET 2] LP LIVE STEAM ISOLATION MOTOR VALVE 15 Week 7 5 C C C C C C C
FLM [ASSET 2] VENT STEAM CONDENSER
A-056 HK ST 2.0 DEAERATOR (DEAERATOR TANK - CDU - HEAD TANK)
FLM [ASSET 2] CDU
FLM [ASSET 2] CCW EXPANSION HEAD TANK 15 Week 7 5 D D D D D D D
FLM [ASSET 2] DEAERATOR ST 2.0
SUB TOTAL WORK HOURS 38 34 24 8 21.5 18 25

FLM

SUB TOTAL WORK HOURS 0 0 0 0 0 0 0


TOTAL MAN HOUR 160 160 160 160 160 160 160
Keterangan Man Hour tidak siap
Cuti/Sakit 0 0 0 0 0 0 0
Meeting/SPPD 0 0 0 0 0 0 0
TOTAL WORK HOURS 38 34 24 8 21.5 18 25

Available manhours 160 160 160 160 160 160 160


Workhours 38 34 24 8 21.5 18 25
% workhours thdp available manhours 24% 21% 15% 5% 13% 11% 16%

4 of 8
Periode : 13 Oct 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 42

13 Oct 2024 14 Oct 2024 15 Oct 2024 16 Oct 2024 17 Oct 2024 18 Oct 2024 19 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR D MH OPR D MH OPR A MH OPR A MH OPR B MH OPR B MH OPR C MH
ST1.0, HRSG & AUXILIARY HOUR
R-006 Tes Run JOP #A ST dan putar filter 4 Week 1 2 2 2
R-007 Tes Run JOP #B ST dan putar filter 4 Week 1 2 2 2
R-015 Regenerasi H2 Dryer ST 1.0 2 Week 1 2 2 2
R-030 Tes Run LP BFP #A 8 Week 0.25 2 0.5 0.5
R-031 Tes Run LP BFP #B 8 Week 0.25 2 0.5 0.5
R-032 Tes Run LP BFP #C 8 Week 0.25 2 0.5 0.5
R-033 Tes Run LP BFP #D 8 Week 0.25 2 0.5 0.5
R-048 Check Brush Excitation 1 Week 1 2 2 2
R-049 Check Brush Grounding 1 Week 1 2 2 2
R-050 Change Over AC PWC 2 Week 1 2 2 2
R-051 Change Over AC PAC lantai 1 dan 2 2 Week 1 2 2 2
R-053 Test Run AC PAC #B lantai 3 2 Week 1 2 2 2
R-054 Test Emergency Diesel Generator - Blok Existing 1 Week 1 2 2 2
ST2.0, HRSG & AUXILIARY
R-071 Operation of CTCS Condensor 1 Week 2 5 10 10
R-073 Test Run CCWS #B 2 Week 1 2 2 2
R-075 Test Run ACWP #B 2 Week 1 2 2 2
R-078 Test Run JOP #1 ST 2.0 4 Week 1 2 2 2
R-080 Test Run MOP #1 ST 2.0 2 Week 1 3 3 3
R-082 Tes Run EOP 2 Week 1 3 3 3
R-083 Tes Run Motor Collecting Oil Pump 2 Week 1 3 3 3
R-084 Test Run Vapour Oil Exhauster #1 2 Week 1 2 2 2
R-086 Test Run Condenser Vacuum Pump #1 2 Week 1 2 2 2
R-089 Test Run Ven Steam Condensor #2 2 Week 1 2 2 2
R-092 Test Run HP BFP #C 3 Week 1 2 2 2
R-095 Test Run AOP HP BFP #C 3 Week 0.25 2 0.5 0.5
R-098 Test Run LP BFP #C 3 Week 1 2 2 2
R-101 Test Run CEP #C 3 Week 1 2 2 2
R-104 Check Brush Grounding 1 Week 1 2 2 2
R-107 Test Emergency Diesel Generator ST2.0 1 Week 1 2 2 2
R-111 Test Run CPH Pump 2.1 #B 2 Week 1 2 2 2
R-113 Test Run CPH Pump 2.2 #B 2 Week 1 2 2 2
R-115 Test Run CPH Pump 2.3 #B 2 Week 1 2 2 2
R-127 Purifikasi Hydrolic Oil HPH STG 2.0 1 Day 2 2 4 2 2 2 2 2 2 2
Inspeksi & Cleaning Y Strainer Heat Exchanger Vacuum Pump #A
R-128 2 Week 0.5 2 1 1
Flushing (Filling & Drain Air Separator)
GT & AUXILIARY
R-130 Change Over Lube Oil Cooler GT 1.2 5 Week 1 2 2 2
R-131 Change Over Lube Oil Cooler GT 2.1 5 Week 1 2 2 2
R-132 Change Over Lube Oil Cooler GT 2.2 5 Week 1 2 2 2
R-133 Change Over Lube Oil Cooler GT 2.3 5 Week 1 2 2 2
R-134 Tes Run JOP #A GT 1.2 1 Week 1 2 2 2
R-135 Tes Run JOP #B GT 1.2 1 Week 1 2 2 2
R-136 Tes Run JOP #A GT 2.1 4 Week 1 2 2 2
R-138 Tes Run JOP #A GT 2.2 4 Week 1 2 2 2
R-140 Tes Run JOP #A GT 2.3 4 Week 1 2 2 2
R-147 Start Stop Turning dan Pelumasan GT 1.2 [RSH] 3 Day 1 3 3 1 1
R-157 Test Run Package Air Vent #A GT 2.2 4 Week 0.5 2 1 1
R-158 Test Run Package Air Vent #B GT 2.2 4 Week 0.5 2 1 1
R-159 Test Run Package Air Vent #C GT 2.2 4 Week 0.5 2 1 1
R-170 Check Brush Excitation 1 Week 1 2 2 2
R-171 Check Brush Grounding 1 Week 1 2 2 2
R-174 Test Running MFOP GT 2.1 8 Week 1 2 2 2
R-179 Test Running FOTP #A Block II 8 Week 1 2 2 2
R-186 Test Run FSNL GT 2.1 Bahan Bakar Minyak 16 Week 0.5 4 2 2
R-189 Drain manual strainer sweep air valve GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-190 Drain manual strainer sweep air valve GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-191 Drain manual strainer sweep air valve GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-192 Drain manual strainer sweep air valve GT 2.3 [RSH] 1 Week 0.5 2 1 1
R-193 Drain manual header udara instrumen GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-194 Drain manual header udara instrumen GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-195 Drain manual header udara instrumen GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-196 Drain manual header udara instrumen GT 2.3 [RSH] 1 Week 0.5 2 1 1
R-197 Tes Run Close Cycle Cooling Water Pump #A 6 Week 1 2 2 2
AUXILIARY COMMON
R-207 Inspeksi Strainer Lube Water Screen Wash Pump #B 4 Week 1 2 2 2
R-213 Operation Test of F/F motor driven (Fresh Water) 1 Week 1 2 2 2
R-214 Operation Test of F/F diesel engine (Fresh Water) 1 Week 1 2 2 2
R-215 Operation Test of F/F motor driven (Sea Water) 1 Week 1 1 1 1
R-216 Operation Test of F/F diesel engine (Sea Water) 1 Week 1 1 1 1
R-217 Test Run MCWP #A (Blok 2) 1 Week 1 2 2 2
R-218 Test Run MCWP #B (Blok 2) 1 Week 1 2 2 2
R-219 Test Run Revolving Bar Screen dan Flush pump #A (Blok 2) 1 Week 1 2 2 2
R-220 Test Run Revolving Bar Screen dan Flush pump #B (Blok 2) 1 Week 1 2 2 2
R-224 Pengantian Seal Water Chlorinatian Plant (Blok 1) 1 Week 1 1 1 1
R-225 Pengantian Seal Water Chlorinatian Plant (Blok 2) 1 Week 1 1 1 1
R-228 Performance Test Electro Chlorination Plant #1 (Blok 2) 8 Week 3 2 6 6
R-229 Performance Test Electro Chlorination Plant #2 (Blok 2) 8 Week 3 2 6 6
R-230 Flushing & Acid Cleaning Electro Chlorination Plant #1 (Blok 2) 8 Week 3 2 6 6
R-231 Flushing & Acid Cleaning Electro Chlorination Plant #2 (Blok 2) 8 Week 3 2 6 6
5 of 8
Periode : 13 Oct 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 42

13 Oct 2024 14 Oct 2024 15 Oct 2024 16 Oct 2024 17 Oct 2024 18 Oct 2024 19 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR D MH OPR D MH OPR A MH OPR A MH OPR B MH OPR B MH OPR C MH
ST1.0, HRSG & AUXILIARY HOUR
R-232 Cleaning VAF Filter System & Injection Chlorine To Line Sea Water EC 2.0 (Blok 2) 1 Week 1 2 2 1 1
R-239 Periode Operasi Desalination Plant 1 6 Week 2 2 4 4
R-241 Operation Test of F/F Jockey Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-242 Operation Test of F/F Motor Driven (Fresh Water) Blok 2 1 Week 1 2 2 2
R-243 Operation Test of F/F Diesel Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-259 Operation Test of Blower, Agitator dan Scrapper WWTP 3 Day 1 2 2 2 2
R-260 Test Run Sedimentation Pump dan Sludge Enrichment Pump 3 Day 1 2 2 2 2
R-267 Test Run Cleaning Pump PLTS 4 Week 0.5 2 1 1
R-268 Penyesuaian List Redundent Asset dengan Kondisi Aktual 1 Week 0.5 2 1 1
HOUSE KEEPING (HK) & FIRST LINE MAINTENANCE (FLM) (DAY)
A-057 HK ST 2.0 TRAFO (GSUT, UAT, SST - EDG 2.0 - Ruang trafo)
FLM [ASSET 2] STG-GENERATOR STEP UP TRANSFORMER STG 2.0
FLM [ASSET 2] UNIT AUXILIARY TRANSFORMER 2.0 15 Week 7 5 A A A A A A A
FLM [ASSET 2] EMERGENCY DIESEL GENERATOR
A-058 HK WATER INTAKE 1 (ALL PUMP - FIRE SYSTEM - ELECTRICAL PANEL, BREAKER MCC)
FLM [ASSET] Circulating Water Pump (CWP) A Unit
FLM [ASSET] Circulating Water Pump (CWP) B Unit 15 Week 7 5 B B B B B B B
FLM [ASSET] DIESEL DRIVEN SEA WATER FIRE PUMP UNIT [ SAFETY ]
FLM [ASSET] MOTOR DRIVEN SEA WATER FIRE PUMP UNIT [ SAFETY ]

A-059 HK WATER INTAKE 2 (ALL PUMP - CLAW & REVOLVING SCREEN - ELECTRICAL PANEL)
FLM [ASSET 2] CIRCULATING WATER PUMP #A
FLM [ASSET 2] CIRCULATING WATER PUMP #B 15 Week 7 5 C C C C C C C
FLM [ASSET 2] REVOLVING SCREEN #A
FLM [ASSET 2] REVOLVING SCREEN #B

A-060 HK CHLORINATION PLANT 1 (BOOSTER PUMP - TRAIN 1 & 2 - ACID CLEANING SYSTEM)
FLM [ASSET] ACID CLEANING SYSTEM
FLM [ASSET] SEAWATER BOSTER PUMP (A) 15 Week 7 5 D D D D D D D
FLM [ASSET] CHLORINATION PLANT #2 - GENERATOR & RECTIFIER
A-062 HYDROGEN PLANT (HYDROGEN A & B, KOMPRESOR - STORAGE VESSEL - ELECTRICAL PANEL)
15 Week 7 5
FLM (Motor / Pompa / Asset)
SUB TOTAL WORK HOURS 31 28 32 32 33.5 14 19

FLM

SUB TOTAL WORK HOURS 0 0 0 0 0 0 0


TOTAL MAN HOUR 160 160 160 160 160 160 160
Keterangan Man Hour tidak siap
Cuti/Sakit 0 0 0 0 0 0 0
Meeting/SPPD 0 0 0 0 0 0 0
TOTAL WORK HOURS 31 28 32 32 33.5 14 19

Available manhours 160 160 160 160 160 160 160


Workhours 31 28 32 32 33.5 14 19
% workhours thdp available manhours 19% 18% 20% 20% 21% 9% 12%

6 of 8
Periode : 20 Oct 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 43

20 Oct 2024 21 Oct 2024 22 Oct 2024 23 Oct 2024 24 Oct 2024 25 Oct 2024 26 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR C MH OPR D MH OPR D MH OPR A MH OPR A MH OPR B MH OPR B MH
ST1.0, HRSG & AUXILIARY HOUR
R-001 Back Wash Condensor A dan B 8 Week 2 5 10 10
R-012 Tes Run Seal Oil Pump #A 4 Week 1 2 2 2
R-013 Tes Run Seal Oil Pump #B 4 Week 1 2 2 2
R-014 Tes Run Emergency Seal Oil Pump (DC) 4 Week 1 2 2 2
R-016 Tes Run Exhaust Fan Bearing Chamber #A 4 Week 1 2 2 2
R-017 Tes Run Exhaust Fan Bearing Chamber #B 4 Week 1 2 2 2
R-018 Tes Run Condenser Vacuum Pump #A 3 Week 1 2 2 2
R-020 Tes Run Gland Steam Cond. Exh. Fan Motor #A 4 Week 1 2 2 2
R-021 Tes Run Gland Steam Cond. Exh. Fan Motor #B 4 Week 1 2 2 2
R-041 Tes Run Sea Water Booster Pump #B 8 Week 1 2 2 2
R-042 Change Over dan Backwash Heat Exchanger #A Standby 4 Week 2 2 4 4
R-043 Tes Run IAC ST 1.0 #A 4 Week 1 2 2 2
R-044 Tes Run IAC ST 1.0 #B 4 Week 1 2 2 2
R-045 Change Over IAD #A Standby 4 Week 1 2 2 2
R-046 Tes Run SAC ST 1.0 #A 4 Week 1 2 2 2
R-047 Tes Run SAC ST 1.0 #B 4 Week 1 2 2 2
R-048 Check Brush Excitation 1 Week 1 2 2 2
R-049 Check Brush Grounding 1 Week 1 2 2 2
R-052 Test Run AC PAC #A lantai 3 2 Week 1 2 2 2
R-054 Test Emergency Diesel Generator - Blok Existing 1 Week 1 2 2 2
ST2.0, HRSG & AUXILIARY
R-071 Operation of CTCS Condensor 1 Week 2 5 10 10
R-072 Test Run CCWS #A 2 Week 1 2 2 2
R-074 Test Run ACWP #A 2 Week 1 2 2 2
R-081 Test Run MOP #2 ST 2.0 2 Week 1 3 3 3
R-085 Test Run Vapour Oil Exhauster #2 2 Week 1 2 2 2
R-087 Test Run Condenser Vacuum Pump #2 2 Week 1 2 2 2
R-088 Test Run Ven Steam Condensor #1 2 Week 1 2 2 2
R-090 Test Run HP BFP #A 3 Week 1 2 2 2
R-093 Test Run AOP HP BFP #A 3 Week 0.25 2 0.5 0.5
R-096 Test Run LP BFP #A 3 Week 1 2 2 2
R-099 Test Run CEP #A 3 Week 1 2 2 2
R-102 Test Run Air Compressor #A 4 Week 1 2 2 2
R-104 Check Brush Grounding 1 Week 1 2 2 2
R-105 Test Run AHU #1 4 Week 1 2 2 2
R-107 Test Emergency Diesel Generator ST2.0 1 Week 1 2 2 2
R-110 Test Run CPH Pump 2.1 #A 2 Week 1 2 2 2
R-112 Test Run CPH Pump 2.2 #A 2 Week 1 2 2 2
R-114 Test Run CPH Pump 2.3 #A 2 Week 1 2 2 2
R-122 Change Over HE Blowdown #A ST 2.0 4 Week 1 2 2 2
R-127 Purifikasi Hydrolic Oil HPH STG 2.0 1 Day 2 2 4 2 2 2 2 2 2 2
Inspeksi & Cleaning Y Strainer Heat Exchanger Vacuum Pump #B
R-129 2 Week 0.5 2 1 1
Flushing (Filling & Drain Air Separator)
GT & AUXILIARY
R-134 Tes Run JOP #A GT 1.2 1 Week 1 2 2 2
R-135 Tes Run JOP #B GT 1.2 1 Week 1 2 2 2
R-142 Putar Filter JOP dan OST (All GT) 2 Week 1 2 2 2
R-143 Test AOP, EOP, AC & DC Turning GT 1.2 [RSH] 4 Week 0.5 3 1.5 1.5
R-147 Start Stop Turning dan Pelumasan GT 1.2 [RSH] 3 Day 1 3 3 1 1
R-160 Test Run Package Air Vent #A GT 2.3 4 Week 0.5 2 1 1
R-161 Test Run Package Air Vent #B GT 2.3 4 Week 0.5 2 1 1
R-162 Test Run Package Air Vent #C GT 2.3 4 Week 0.5 2 1 1
R-163 Online Washing Compresor GT 1.2 4 Week 1 3 3 3
R-168 Test Run Compressor & Manual Pulshing IAF Blok I 4 Week 1 2 2 2
R-170 Check Brush Excitation 1 Week 1 2 2 2
R-171 Check Brush Grounding 1 Week 1 2 2 2
R-172 Test IAC GT Block II 2 Week 1 2 2 2
R-189 Drain manual strainer sweep air valve GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-190 Drain manual strainer sweep air valve GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-191 Drain manual strainer sweep air valve GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-192 Drain manual strainer sweep air valve GT 2.3 [RSH] 1 Week 0.5 2 1 1
R-193 Drain manual header udara instrumen GT 1.2 [RSH] 1 Week 0.5 2 1 1
R-194 Drain manual header udara instrumen GT 2.1 [RSH] 1 Week 0.5 2 1 1
R-195 Drain manual header udara instrumen GT 2.2 [RSH] 1 Week 0.5 2 1 1
R-196 Drain manual header udara instrumen GT 2.3 [RSH] 1 Week 0.5 2 1 1
AUXILIARY COMMON
R-201 Test Run Circulating Water Pump (CWP) #B 8 Week 0.5 2 1 1
R-203 Tes Run Lube Water Pump #B CWP 8 Week 0.5 2 1 1
R-204 Tes Run Screen Wash Pump #A 4 Week 1 2 2 2
R-205 Tes Run Screen Wash Pump #B 4 Week 1 2 2 2
R-208 Test Run Travelling Screen #A 2 Week 0.5 2 1 1
R-209 Test Run Travelling Screen #B 2 Week 0.5 2 1 1
R-213 Operation Test of F/F motor driven (Fresh Water) 1 Week 1 2 2 2
R-214 Operation Test of F/F diesel engine (Fresh Water) 1 Week 1 2 2 2
R-215 Operation Test of F/F motor driven (Sea Water) 1 Week 1 1 1 1
R-216 Operation Test of F/F diesel engine (Sea Water) 1 Week 1 1 1 1
R-217 Test Run MCWP #A (Blok 2) 1 Week 1 2 2 2
R-218 Test Run MCWP #B (Blok 2) 1 Week 1 2 2 2
R-219 Test Run Revolving Bar Screen dan Flush pump #A (Blok 2) 1 Week 1 2 2 2
R-220 Test Run Revolving Bar Screen dan Flush pump #B (Blok 2) 1 Week 1 2 2 2
7 of 8
Periode : 20 Oct 2024 Jadwal Routine Work dan House Keeping Mingguan Bidang Operasi UBP Grati
Week : 43

20 Oct 2024 21 Oct 2024 22 Oct 2024 23 Oct 2024 24 Oct 2024 25 Oct 2024 26 Oct 2024
ACT DURA JUMLAH MAN SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
NUMBER DESKRIPSI FREQ TION CRAFT HOUR
OPR C MH OPR D MH OPR D MH OPR A MH OPR A MH OPR B MH OPR B MH
ST1.0, HRSG & AUXILIARY HOUR
R-222 (Test Run / Performance Test) Chlorination Plant #2 Blok 1 [RSH] 8 Week 3 2 6 6
R-223 Flushing Chlorination Plant #2 Blok 1 [RSH] 4 Week 3 2 6 6
R-224 Pengantian Seal Water Chlorinatian Plant (Blok 1) 1 Week 1 1 1 1
R-225 Pengantian Seal Water Chlorinatian Plant (Blok 2) 1 Week 1 1 1 1
R-226 Test Run Booster Pump #A Chlorination Plant (Blok 1) 4 Week 1 2 2 2
R-227 Test Run Booster Pump #B Chlorination Plant (Blok 1) 4 Week 1 2 2 2
R-232 Cleaning VAF Filter System & Injection Chlorine To Line Sea Water EC 2.0 (Blok 2) 1 Week 1 2 2 1 1
R-234 Test Run Sea Water Booster Pump #B Chlorination Plant (Blok 2) 4 Week 1 2 2 2
R-236 Test Run Air Blower #B (Blok 2) 4 Week 1 2 2 2
R-241 Operation Test of F/F Jockey Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-242 Operation Test of F/F Motor Driven (Fresh Water) Blok 2 1 Week 1 2 2 2
R-243 Operation Test of F/F Diesel Pump (Fresh Water) Blok 2 1 Week 1 2 2 2
R-245 Tes Run Make Up Water Pump #B (Blok 1) 4 Week 1 2 2 2
R-246 Test Run Demin Water Pump #A (Blok 2) 4 Week 1 2 2 2
R-249 Tes Run Service Water Pump #B (Blok 1) 6 Week 1 2 2 2
R-251 Test Run Service Water Pump #B (Blok 2) 6 Week 1 2 2 2
R-254 Tes Run of Yard IAC #A 4 Week 1 2 2 2
R-256 Change Over Yard IAD #A Standby 4 Week 1 2 2 2
R-258 Tes Run Kompresor #B Hydrogen Plant 8 Week 1 2 2 2
R-259 Operation Test of Blower, Agitator dan Scrapper WWTP 3 Day 1 2 2 2 2
R-260 Test Run Sedimentation Pump dan Sludge Enrichment Pump 3 Day 1 2 2 2 2
R-268 Penyesuaian List Redundent Asset dengan Kondisi Aktual 1 Week 0.5 2 1 1
HOUSE KEEPING (HK) & FIRST LINE MAINTENANCE (FLM) (DAY)
A-001 HK GAS TURBINE 1.2 (BAWAH TURBIN & KOMPRESOR - ATOMIZING - IAD & JOP)
FLM [ASSET] GT 1.2 - ATOMIZING AIR COMPRESSOR
FLM [ASSET] GT 1.2 - INSTRUMENT AIR DRYER SKID 15 Week 7 5 B B B B B B B
FLM [ASSET] GT 1.2 - JACKING OIL PUMP # A/B UNIT
A-002 HK GAS TURBINE 1.2 (B-RACK - BREAKER PDC MCC - EXCITATION & GENERATOR)
FLM CV Bahan Bakar Minyak (CV 135 , CV 147 A,CV 147 B)
FLM CV Bahan Bakar Gas (CV 165,CV 174) 15 Week 7 5 C C C C C C C
FLM panel Breaker MCC
A-003 HK GAS TURBINE 1.2 (AUX.PACKAGE - LUBE OIL COOLER - RUANG LUBE OIL STRAINER)
FLM [ASSET] GT 1.2 - LUBE OIL COOLER #A/B
FLM [ASSET] GT 1.2 - MAIN LUBE OIL PUMP 15 Week 7 5 D D D D D D D
FLM [ASSET] GT 1.2 - TURNING GEAR AND TRANSMISSION GEAR SYSTEM
A-061 HK CHLORINATION PLANT 2 (PUMP, BLOWER, RECTIFIER, CHEMICAL TANK - ELECTRICAL PANEL -
DEGASING TANK)
FLM [ASSET 2] SEA WATER BOOSTER PUMP #1
FLM [ASSET 2] SEA WATER BOOSTER PUMP #2 15 Week 7 5 A A A A A A A
FLM [ASSET 2] SHOCK DOSING PUMP
FLM [ASSET 2] CONTINOUS DOSING PUMP

A-062 HYDROGEN PLANT (HYDROGEN A & B, KOMPRESOR - STORAGE VESSEL - ELECTRICAL PANEL)
15 Week 7 5
FLM (Motor / Pompa / Asset)
SUB TOTAL WORK HOURS 36 40 21.5 46 25.5 23 25

FLM

SUB TOTAL WORK HOURS 0 0 0 0 0 0 0


TOTAL MAN HOUR 160 160 160 160 160 160 160
Keterangan Man Hour tidak siap
Cuti/Sakit 0 0 0 0 0 0 0
Meeting/SPPD 0 0 0 0 0 0 0
TOTAL WORK HOURS 36 40 21.5 46 25.5 23 25

Available manhours 160 160 160 160 160 160 160


Workhours 36 40 21.5 46 25.5 23 25
% workhours thdp available manhours 23% 25% 13% 29% 16% 14% 16%

8 of 8