0% found this document useful (0 votes)
21 views30 pages

Daily Report

Uploaded by

Ishikka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views30 pages

Daily Report

Uploaded by

Ishikka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

Date Support for Events Maintenance

Complaints
B/F
SR. No BLOCK

1 1. FCAM inducation program,

A
room no 018 (shooting hall)
2. Mass comm inducation
program, room no 008.
8/26/2024 3. Agiculture inducation 152
program, room no 316.
4. Science inducation program,
room no 318.
5- Basement decration work
2 going on

B 8/26/2024 N/A 22

8/26/2024 1. Faculty of Engineering student 110


induction program
going on in the Auditorium.

2 Faculty of Allied Health student


induction program

C
going on in the room no 210.

4.Dance pratice going in the


3 Examination hall -1,2 and BCR.
4

University Exam is in progress of


faculty of Nursing in room no 207

D
Orientation Program is in Progress
by the faculty of Physiotherapy in D
Block Room No LG 010 and
8/26/2024 42
Nursing faculty in C Block room no
211.

The work of arranging quiz


competition for the Faculty of
Pharmacy in Room No. 202.

E 8/26/2024
1. seminar hall 308 oreintation
program of behavioural sciences,
2. Disscasion hall oreintation
program of Education department.
82
Daily Report
Complaints Maintenance IT Related Scrap Disposal
Registered Complaints Complaints and
Today Resolved Action
today

18

2 0 N/A N/A

5 1 N/A N/A
11 8 N/A N/A

8 1 N/A N/A
Daily Report
Material shifting Housekeeping Major Purchases Indents
related pending
Complaints &
Actions
1- Iron frame loading work shop to
A block
2- Decration item shifting ground
floor to basement
3- Wooden ply shifting ground
floor to Bsememt
N/A N/A N/A
4- 150 chair shifting in shooting
hall
5- 1 staff go to B block loading
work
6- Wooden ply lloading work shop
to 2nd floor HM department

(1) 2 Bad shift workshop to temple


(2) 2 Buffet table shift morchuri to
temple N/A N/A N/A
(3) 10 Mattress shift D Block to
temple

Duble sheater sofa- 02 nos N/A N/A N/A


Single seater sofa -4 nos sifting to B-
Block terrace from 324,001. By h.k staff
N/A N/A N/A N/A

N/A N/A N/A N/A


Faulty Complaint Incident Report Periodic Critical Issues
Equipment against (If Any) Maintenance requiring
Report (If Any) Student & Carried Out Attention
Staff/Faculty

HK auto
scrubber not N/A N/A N/A N/A
working

(1). Dean Office


Photo copy
machine not
working 1pcs 2023

(2). Room no 309


Dental Library N/A N/A N/A N/A
Photo copy
machine not
working 1pcs 2021
Photo copy
machine not
working 1pcs 2022

1.Pathology - N/A N/A N/A N/A


102 nos.
Equipment not
use in the
department-
went to the
department
with
Biomedical staff
and show the
not use
equipment
date-
29.05.2024

2. College
council room ,
Amplifire-1,mic-
20- not
12TH HOLE 1
PCS 03-02-21
6 MELTING
POINT
APPARATUS 1
PCS 30-02-21
7 MELTING
POINT
APPARATUS 1
PCS 30-08-22
8 MAGNETIC
STIRRER WITH
HOT PLATE 1
PCS 31-08-22 N/A N/A N/A N/A
9 MAGNETIC
STIRRER WITH
HOT PLATE 1
PCS 28-07-23
10 VACCUM
PUMP 2 PCS
22-07-23
11 WEIGHING
BALANCE 1
PCS 12-09-23
12 HOT PLATE
6” 2 PCS 26-02-
24
13 WATER
BATH 8” HOLE 1
N/A N/A N/A N/A N/A
PCS 23-01-24
14
REFRIDGERAT
OR 1 PCS 04-
04-24
15 Rusted and
broken iron
materials (not
usable) 1 Box

The above items


from SN. 1 to 14
are being
damaged by
Biomedical
engineer.
SN. 15 Is one
box is broken
And rusted iron
material which is
not usable.
1- 4th floor washroom
deep cleaning work
done
2-All floor cob web
removing work done
3-courtyard area
Any washing work done
Other Activity
4- 3rd floor glass
cleaning work done
5- 3rd floor washroom
deep cleaning work
done
6-2nd floor kitchen
washing work done
7- 2nd floor kitchen
drain cleaning work
done
8- Basement rain water
drain cleaning work
done
9- Ground floor wating
area sofa cleaning work
done
10- Basement out door
AC cleaning work done
11-Admin side all
1.corridor
4th floor fall
project work
celling
Pending
skating cleaning work
2.Terracedone
sofa work on
going
12 All floor corridor rain
water removing wok
done

N/A
N/A

1. Ground to 4th floor all


corridor floor area scrubbing
work done. 2. All FHC panels
N/A
cleaning work done.3. all
electric panels cleaning work
done.
S.N. Complaint Date Block Location
1

2 1 1/8/2024

3 2 8/1/2024

4 3 8/1/2024

5 4 1/4/2024

6 5 12/2/2024

7 6
A-Block
8 7

9 8 7/12/2024
10 9 8/14/2024

11 10 8/14/2024

12 11 8/4/2024

13 12 5/28/2024

14 13

15 14

16 8/21/2024

17 15 10.08.2024
18 16 08.08.2024

19 17 17.07.2024
B-Block
20 18 17.07.2024

21 19 05.08.2024

22 20 17.07.2024

23 21 13.05.2024

24 22

25 23

C-Block
26 24

25

26

27

28

29

D-Block
D-Block

30

31

32 Jan-24
E-Block

33 Dec. 2023
Maintenance Complaint Status

Lunch area PVC pipe


Basement leckage again
F&D lab lg 05 PVC
Basement pipe leckage again

F&D lab lg 05 Fall


celing damage by PVC
Basement pipe leckage water
Classrooms & labs
All floor wall seepage

Toughened glass
All floor broken A-Block 13pcs

1st floor room no 119


cleaning area water
1st floor leakage problem
4th floor class side
4th floor stair wall sepage
Roof rain watre
Happines center leckage again
3rd floor libary wall seepage

Room no 001 wall


Ground floor seepage

class side washroom


2nd floor seepage
Office sofa chair
All floor polish
class side washroom
1st floor seepage

class side and back


side washroom
Ground floor seepage

Shooting hall main


doortoughened glass
Ground floor wall creck(Urgently
Room no 104 Drain
pipe line blokage
Room no 302 Drain
pipe line change

Room no 016 Back


side drain pipe
change
Table polish
Room no 201 wall
seepage
Room no 104 wall
seepage
TV Studio corridor
Whitewashing

Department office,
class rooms, lab ,paint
required.

Tolilet maintenance
required.-(Paint ,tiles
repair, fall ceiling
repair, door replace)

Window repair-
rubber replace ,rain
water
leaking ,window jali,
paint repair
Reception Canopy
rain water leaking

06 Toilet door replace


work.(D.H, Anatomy,
Lecture hall

Nearby 325 Female


washroom cealing
area paint required.
Library rain water
leaking.
LG 004 Bhatti room
roof leaking
Intercom lane is not
usable after panta
scaning work in 2nd
floor. (According to
Intercom technician)

Tafan Glass broken.


(The total number of
broken glasses is 52.)

Front side drain jali


frame repair and
masson work done.

Blue color cloth fitting


in notice board
outside classrooms.
70nos
To be done by Remark

Maintena
Work is done nce team

Maintena
Work is done nce team
work done. ###

Sample received
by project
depart.
S.N. Complaint Date Block Location

1 Jun-24 4th floor, Admin side

2 Basement
2nd floor, Room no
3 Jul-24 214
4 A-Block
2nd floor, Room no
5 Jul-24 223

6 4th floor, Admin side


7 Happiness centre
8 Happiness centre
Ground floor remp
9 Jul-24 B-Block side
10
11
12
13
14
15
C-Block
16
17

18

19

20
D-Block

21

4th floor Room no.


22 Jul-23 413

2nd floor room no.


23 Jan-24 204

24 Jul-23 E-Block 4th floor room no. 412


E-Block

25 Jan-24 3rd floor room no. 304


Corporate offcie
26 Jul-23 ground floor

27 Jan-24 4th floor room no. 404


28 Aug-23 E Block 4th floor & law
29 Aug-23 E Block E Block
Complaint Status Remark
The work of installing AC outdoor unit in the
examination center work Work in progress
Damage to several GRC lattice in basement area
building wall. pending
HM department studio kitchen project pending
Toughened glass broken A-Block 13pcs pending
HM restaurant project work Work in progress

4th floor exam branch new lab work station, work Work in progress
Happiness center terrace water leakage work pending
Happiness center fall celling work pending
Extension of store space pending
Building outer paint work Stop
Corridor rain water draines required pending
New simulation project work not finished properly pending
Building outer Footpath work Work in progress
Auditorium fallceiling cracks repair Work in progress
Room no 202 GCR project work Work in progress
Stage ceiling work Work in progress
Room no 126 project work (FMT) Work in progress

Terrace water supply pipe ,cables, AC work not


properly. Work in progress

New simulation lab fallceiling crack,AC repair,Paint


work, plubering work. Work in progress

Construction work is going on behind the first, second


and third floors Completed 8/16/2024

Alumunium window fitting work in progress (1st Floor) Completed 8/16/2024

Glazing glass broken in engineering college room 413 Pending Incomplete

Room no. 204 wall extension for projector screen. Pending Pending by Project

Glazing glass broken in engineering college room 412 Pending Incomplete


Room no. 304 wall extension for projector screen. Pending Pending by Project

Corporate office Glazing glass broken 02 pc. Pending Pending by Project

Room no. 404 wall extension for projector screen. Pending Pending by Project
4th floor & law building new LED 36 watt light
installation work incomplete Pending putty toucup
Pending work
by Project
done but paint work
E block back side wall plaster work incomplete. Pending incomplete
LOCATION WISE - SOFAS
S.No. Type of Sofa
Block Hospital Hostel
1 Single Seater 105 29 6
2 Double Seater 20 10 3
3 Triple Seater 18 3 0
4 Four Seater 3 0 0
5 Dinning Chair 16 0 0
Total 162 42 9

S.N Guest House A Block B Block Total


1 Single Seater 33 (22Repair) 26 37
2 Double Seater 10 8 18
3 Triple Seater 3 7 10
Total 24 41 65
A Block
S.N. Type Single
Room No.
Description Presently Held To be giv
1 03 Fashion Dean 2 Seater 2
2 17 Masscom Dean 4 Chair wooden 2
3 17(A) Masscom waiting Area 2 Seater set 2
4 201 Modal Room (HM) 2 Seater set 2
5 222 Dean (HM) Single seater (02) 2
6 2nd floor waiting area (admin side) 2 Seater set 2
7 3rd floor waiting area (admin side) 2 Seater set 2
8 302 Dean FCAM 4 Chair wooden 2
9 303 Dean FASC 4 Chair wooden 2
10 304 Dean FOSC 4 Chair wooden 2
11 401 Examination 3 Seater set 2
12 402 Examination Single seater (02) 2
13 403 Examination Single seater (02) 2
14 404 Examination Single seater (02) 2
B-Block Plain
S.N. Room No. Description Type Single
1 9 Dean Office 2 Seater Sofa 2
2 11 Pedodontics 2 Single 2
Oral Medicine
3 16 and Radiology 2 Single 2
4 103 Prosthodontics 2 Single 2
5 104 Oral Surgery 2 Single 2
6 202 Pedodontics 2 Single 2
7 204 Conservative 2
TV Studio
8 306 PCR Room & Corridor 2 Seater Sofa Set
9 310 Naturopathy 2 Seater Sofa Set 2
C-Block Plain
S.N. Room No. Description Type Single
1 3 Arena Club,Photography Club 2 Seater Set 2
2 4 DSW Office 2 Seater Set 2
3 13 Department of Pathology 2 Seater Set 2
4 17 Department of Anatomy Single Sofa set 4pcs 2
5 101 H.R 2 Seater Set 2
102 Medical Dean 3 Seater Sofa Set 2
6 106 Alumni cell 3 Seater Sofa Set 2
7 117 Community Medicine Single Sofa set 3pcs 2
8 129 FAHS Dean office 3 Seater Sofa Set 2
9 208 Biochemistry office Single Sofa Set 3pcs 2
10 213 Physiology Single Sofa set 4pcs 2
11 312 office 2 Seater Set 2
12 318 Office & Faculty Rooms 2 Seater Set 2
D-Block Plain
S.N. Room No. Description Type Single

1 5 Marketing 3 Seter Sofa Set


2 6 Ayurveda 3 Seter Sofa Set 2
3 12 BPT Dean Office Single Sofa Set 2pcs 2
4 101 Central Coordination Cell 2 Seater Sofa Set 2
5 113 Dean office Nursing 2 Seater Sofa Set 2
6 312 HOD office of Pharmacy Single Sofa Set 2pcs 2
7 313 Dean Office of Pharmacy Single Sofa Set 2pcs 2
8 403 Library Single Sofa Set 2pcs 2
E-Block Plain
S.N. Room No. Description Type Single
1 101 Dean Ofiice (Engineering) 2 seater sofa 2
2 103 (Seminar Hall) 2 seater sofa set (2) 4
4 107 Dean Office (Behiver Sci.) 3 seater sofa 2
7 302 Dean Office Education 2

104 Dean Office (Law)


8 3 seater sofa 2
308 (Seminar Hall) 3,2,1 seater sofa 1

B BLOCK TERRACE BLUE SOFA DETAIL

S.NO Block Sofa Type No of Sofa Sofa


1 A Block Single seater sofa 8 2 Seater sofa
2 B Block Single seater sofa 10 2 Seater sofa
3 C Block Single seater sofa 32 2 Seater sofa
4 D Block Single seater sofa 14 2 Seater sofa
5 E Block Single seater sofa 6 2 Seater sofa
6 Kanchanjunga
7 A Block HM Cushion 1
8 Head office Cushion 4
9 Terrace Single seater sofa 12 2 Seater sofa
Total sofa 87
Total Seat Total sofa 87

B BLOCK TERRACE RED SOFA DETAIL


S.NO Block Sofa Type No of Sofa Sofa Type
1 Aryabhatta Single seater sofa 18 2 Seater sofa
3 Terrace Single seater sofa 18 2 Seater sofa
Total sofa 36
Total Seat 36

Total sofa 114


Total Seat 160
Total
140
33
21
3
16
213

Double Triple 4 Seater Remark


To be given after repairs
1
1

1 Magenta colour

1
1
1
1
1
1

Plaining of Sofa
Double Triple 4 Seater Remark
1

New - Does not


1 1 require repairs
1
Plaining of Sofa
Double Triple 4 Seater Remark
1
1 Completed
1 Completed
1 Completed
Completed
1 Completed
1
Completed
1 Completed
1
Completed

1
Plaining of Sofa
Double Triple 4 Seater Remark

2 Completed
1 Completed
1 Completed
1
1 Completed

Completed

Plaining of Sofa
Double Triple 4 Seater Remark
1
Blue new
1
1

1 1 0
1 1 Red colour new

RRACE BLUE SOFA DETAIL


No of
No of Sofa Sofa Type No of Sofa Sofa Type Sofa Total
3 3 seater sofa 1
1
1 3 seater sofa 4 4 Seater sofa 1
4 4 Seater sofa 2
1 3 seater sofa 1
3 seater sofa 1

2 3 seater sofa 4 4 Seater sofa 1


12 11 4 114
24 33 16 160

CE RED SOFA DETAIL


No of Sofa Sofa Type No of Sofa Total
10 3 seater sofa 5
10 3 seater sofa 5
20 10 66
40 30 106
Details of Academic Block Lockers Unit
S.N. Lockers A Block B Block C Block D Block E Block Unit
1 Box 3 1 0 0 0 0 1
2 Box 6 26 21 2 0 0 49
3 Box 8 0 27 1 0 0 28
4 Box 9 2 4 7 0 0 13
5 Box 12 0 18 16 0 0 34
6 Box 15 8 1 9 99 2 119
Total Unit 37 71 35 99 2 244
Details after having a paint (Locker Unit)
1 A Block B Block C Block D Block E Block Unit Balance
2 7 12 24 99 2 144 100