0% found this document useful (0 votes)
4 views4 pages

Academic Ground Floor

Uploaded by

hllpalani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views4 pages

Academic Ground Floor

Uploaded by

hllpalani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Academic Block-Ground Floor

S.No. location Observation


1 Faculty room corner structural glazing ceiling primer touch ups balance
2 3 switches box are not fixed.
3 switches box joint not finished properly
4 mineral fiber tiles not aligned properly
5 corner of false ceiling & masonry paint touch ups balance
6 wall skirting grouting balance
7 wall dado grouting balance (structural glazing)
8 corner of door fram masonry wall crack observed
9 ELV/Fire control room wall skirting works pending
10 dummy pipes observed at ceiling
11 electrical openings not finishing properly
12 chamber not finishing properly
13 Library room switches box joint not finished properly
14 tower bolt not fixed properly
15 corner of false ceiling & masonry paint touch ups balance
16 mineral fiber tiles joints not fitting properly
17 wall skirting grouting balance
18 Facultr room mineral fiber tiles joints not fitting properly
19 flooring tiles & skirting grouting balance
20 Door fram joint not finishing properly
21 flush door not fixed
22 Non teaching staff room flush door not fixed
23 1 flooring tiles & skirting grouting balance
24 flooring tiles & skirting grouting balance
25 mineral fiber tiles joints not fitting properly
26 switches are not in same level
27 Asso prof room switches joints not finished properly
28 mineral fiber tiles joints not fitting properly
29 flush door not fixed
30 skirting grouting balance
31 Addt prof room tower bolt not fixed properly
32 skirting tile damage in door fram side
33 switches joints not finished properly
34 mineral fiber tiles joints not fitting properly
35 door fram scratches observed
36 Asst prof room mineral fiber tiles joints not fitting properly
37 switches joints not finished properly
38 Asst prof room Electrical box not packing properly
39 mineral fiber tiles joints not fitting properly
40 flush door not fixed
41 corner of door frames to be finished properly at masonry
42 Asst prof room room entrance floor tiles not in alignment
43 Electrical box not packing properly
44 mineral fiber tiles joints not fitting properly
45 flush door not fixed
Page 1 of 4
Academic Block-Ground Floor
S.No. location Observation
46 electrical box not in alignment
47 Pantry wall dado grouting balance (structural glazing)
48 Electrical box not packing properly
49 mineral fiber tiles damage & joints not fitting properly
50 door side wall dado offset observed
51 HOD room Electrical box not packing properly
52 mineral fiber joints not fitting properly
53 floor tile & skirting grouting balance
54 electrical box not in alignment
55 electrical boxes not fixed
56 Toilet metallic tiles are damage
57 corner of door frames to be finished properly at masonry
58 PA room floor tile & skirting grouting balance
59 curtain pelmets fininshing not done properly
60 mineral fiber joints not fitting properly
61 Tutor/Resident's room 1 floor tile damage
62 Electrical box not packing properly
63 mineral fiber joints not fitting properly & not in alignment
64 Floor tile & skirting grouting balance
65 tower bolt not fixed properly
66 Corridor mineral fiber joints not fitting properly & not in alignment
67 floor granit offset observed
68 Toilet plumbing pipe clamps not fixed
69 pl & rwp shaft ceiling one plumbing hole packing properly
70 tower bolt not fixed properly
71 mirrer light not fixed
72 FRP door bending at toilet area
73 Metallic tiles joints not fitting
74 Store room tower bolt not fixed properly
75 electical box not in alignment & not packed properly
76 two mineral fiber tiles damage & joint not fitting properly
77 corner of door frames to be finished properly at masonry
78 Department office clerical office
electical box not packed properly
79 mineral fiber tiles joints not fitting properly
80 floor tiles grouting balance
81 Masonry wall corner not in plumb & alignment
82 AHU room & HVAC shaft Kota stone polishing balance & grouting balance
83 Putty points works pending
84 HVAC floor finishing properly
85 floor tarp not provided
86 HVAC opening not finishing properly
87 HAVC pipe bottom supprot usging flyash brick
88 Glass wool laminater some place damage
89 kota flooring and threshold granit level difference
90 Store room Mineral fiber tiles joints not fitting properly
Page 2 of 4
Academic Block-Ground Floor
S.No. location Observation
91 tower bolt not fixed properly
92 door ss buffer material rust observed.
93 Curator room tower bolt not fixed properly
94 electical box not packed properly
95 2 place skirting jollow sound observed
96 mineral fiber tiles joints not fitting properly
97 Flush door shutter warped door straightener
98 Electical room electical shaft floor finishing balance
99 electical shaft ceiling rainforcement exposed
100 fire door warped door straigh tener
101 electical box not packed properly
102 Dissection room mineral fiber tiles joints not fitting properly
103 wall dado grouting balance
104 counter slab side & bottom not finishing balance
105 Electical box side tile cuting not finishing balance
106 Equipment room tower bolt not fixed properly
107 mineral fiber tiles joints not fitting properly
108 Distribution board ceiling opening not packing & finishing properly
109 ceiling reinforcement exposed
110 electical box packing & finishing properly
111 Male Toilet Electical box side tile damage
112 flooring & wall dado grouting pending
113 mirror light wiring not done properly.
114 Metallic tiles joints & work pending
115 mirror damage.
116 FRP door earped door straightener
117 toilet inside light not fixed
118 H/C toilet wall dado grouting balance & 1 tile damage
119 grad rails not fixed
120 metallic tiles works pending
121 door not working properly
122 door lock & hand not provided
123 Femal toilet electical box packing & finishing properly
124 toilet inside light not fixed
125 FRP door shutter warped door straightenes
126 flooring & wall dado grouting pending
127 PL & RWP shaft shaft floor concret not completed
128 masonry finishing not comoleted
129 Pipe opening not finishing properly
130 shutter material not removed
131 EXH shaft shaft floor concret not completed
132 ceiling reinforcement exposed
133 base primer touch ups pending
134 ELV room cable opening finishing not completed
135 electical box not in alignment
Page 3 of 4
Academic Block-Ground Floor
S.No. location Observation
136 one electical box missing
137 base primer & putty touch ups pending
138 ceiling reinforcement exposed
139 threshold side finishing pending
140 skirting grouting balance
141 Lecture hall-1 electical box not in alignment
142 wall panels offset & alignment observed
143 wall panels joints not fitting properly
144 step skirting granit grouting pending
145 1 flush door not fixed properly
146 top electical box not fixed properly
147 2 mineral fiber tiles joints not fitting properly
148 Lecture hall-02 wall panels offset & alignment observed
149 wall panels joints not fitting properly
150 step skirting granit grouting pending
151 1 flush door not locked properly
152 mineral fiber tiles joints not fitting properly
153 Lecture hall-03 wall panels offset & alignment observed
154 wall panels joints not fitting properly
155 electical box missing
156 7 mineral fiber tiles joints not fitting properly
157 Lecture hall-04 1 flush door not fixed properly
158 electical box missing
159 wall panels offset & alignment observed
160 wall panels joint not fitting properly
161 8 mineral fiber tiles joints not fitting properly
162 electical box side wall panels damage

Page 4 of 4