0% found this document useful (0 votes)
42 views12 pages

3) BATH 4) WC: Estimation

dgghb sdgv dvv dg grg

Uploaded by

Sujan Begur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views12 pages

3) BATH 4) WC: Estimation

dgghb sdgv dvv dg grg

Uploaded by

Sujan Begur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

ESTIMATION

SL NO PARTICULARS NOS L(mm) B(mm) D(mm) QTY UNIT EXP NOTES


1) EXCAVATION:
1)LR+BATH+WC
LW 2 7.8 0.9 1.1 15.444 m3 L=6.9+0.9
SW 2 2.4 0.9 1.1 4.752 m3 L=3.3-0.9
2)KITCHEN+ROOM
LW 1 7 0.9 1.1 6.93 m3 L=6.1+0.9
SW 3 2.4 0.9 1.1 7.128 m3 L=3.3-0.9
3)BATH
LW 1 2.4 0.9 1.1 2.376 m3 L=1.5+0.9
SW 2 1.2 0.9 1.1 2.376 m3 L=2.1-0.9
4)WC
SW 1 0.3 0.9 1.1 0.297 m3 L=1.2-0.9
TOTAL: 39.303 m3
2) CC BED:
1)LR+BATH+WC
LW 2 7.8 0.9 0.1 1.404 m3 L=6.9+0.9
SW 2 2.4 0.9 0.1 0.432 m3 L=3.3-0.9
2)KITCHEN+ROOM
LW 1 7 0.9 0.1 0.63 m3 L=6.1+0.9
SW 3 2.4 0.9 0.1 0.648 m3 L=3.3-0.9
3)BATH
LW 1 2.4 0.9 0.1 0.216 m3 L=1.5+0.9
SW 2 1.2 0.9 0.1 0.216 m3 L=2.1-0.9
4)WC
SW 1 0.3 0.9 0.1 0.027 m3 L=1.2-0.9
TOTAL: 3.573 m3
3) SSM(1ST FOOTING)
1)LR+BATH+WC
LW 2 7.65 0.75 0.4 4.59 m3 L=6.9+0.75
SW 2 2.55 0.75 0.4 1.53 m3 L=3.3-0.75
2)KITCHEN+ROOM
LW 1 6.85 0.75 0.4 2.055 m3 L=6.1+0.75
SW 3 2.55 0.75 0.4 2.295 m3 L=3.3-0.75
3)BATH
LW 1 2.25 0.75 0.4 0.675 m3 L=1.5+0.75
SW 2 1.35 0.75 0.4 0.81 m3 L=2.1-0.75
4)WC
SW 1 0.45 0.75 0.4 0.135 m3 L=1.2-0.75
TOTAL: 12.09 m3
SSM(2ND FOOTING)
1)LR+BATH+WC
LW 2 7.5 0.6 0.4 3.6 m3 L=6.9+0.6
SW 2 2.7 0.6 0.4 1.296 m3 L=3.3-0.6
2)KITCHEN+ROOM
LW 1 6.7 0.6 0.4 1.608 m3 L=6.1+0.6
SW 3 2.7 0.6 0.4 1.944 m3 L=3.3-0.6
3)BATH
LW 1 2.1 0.6 0.4 0.504 m3 L=1.5+0.6
SW 2 1.5 0.6 0.4 0.72 m3 L=2.1-0.6
4)WC
SW 1 0.6 0.6 0.4 0.144 m3 L=1.2-0.6
TOTAL: 9.816 m3
SSM(3RD FOOTING)
1)LR+BATH+WC
LW 2 7.35 0.45 0.6 3.969 m3 L=6.9+0.45
SW 2 2.85 0.45 0.6 1.539 m3 L=3.3-0.45
2)KITCHEN+ROOM
LW 1 6.55 0.45 0.6 1.7685 m3 L=6.1+0.45
SW 3 2.85 0.45 0.6 2.3085 m3 L=3.3-0.45
3)BATH
LW 1 1.95 0.45 0.6 0.5265 m3 L=1.5+0.45
SW 2 1.65 0.45 0.6 0.891 m3 L=2.1-0.45
4)WC
SW 1 0.75 0.45 0.6 0.2025 m3 L=1.2-0.45
TOTAL: 11.205 m3
SSM TOTAL 33.111 m3
4) BBM
1)LR+BATH+WC
LW 2 7.2 0.3 3.5 15.12 m3 L=6.9+0.3
SW 2 3 0.3 3.5 6.3 m3 L=3.3-0.3
2)KITCHEN+ROOM
LW 1 6.4 0.3 3.5 6.72 m3 L=6.1+0.3
SW 3 3 0.3 3.5 9.45 m3 L=3.3-0.3
3)BATH
LW 1 1.8 0.3 3.5 1.89 m3 L=1.5+0.3
SW 2 1.8 0.3 3.5 3.78 m3 L=2.1-0.3
4)WC
SW 1 0.9 0.3 3.5 3.78 m3 L=1.2-0.3
TOTAL: 44.205 m3
5) PARAPET
1)o/o 2 6.9 0.3 0.75 3.105 m3
2)i/i 2 6.6 0.3 0.75 2.97 m3
GRAND TOTAL 50.28 m3
6) OPENING
1)DOOR
D 1 1 0.3 2.1 0.63 m3
D1 3 0.9 0.3 2.1 1.701 m3
D2 2 0.75 0.3 2.1 945 m3
2)WINDOW
W1 1 1.8 0.3 1.35 0.779 m3
W2 2 1.5 0.3 1.35 1.215 m3
W3 3 1.2 0.3 1.35 1.458 m3
3)VENTILATION
V 2 0.9 0.3 0.6 0.324 m3
7) LIMTEL OVER
1)DOOR
D 1 1.3 0.3 0.2 0.078 m3
D1 3 1.2 0.3 0.2 0.216 m3
D2 2 1.05 0.3 0.2 0.126 m3
2)WINDOW
W1 1 2.1 0.3 0.2 0.126 m3
W2 2 1.8 0.3 0.2 0.216 m3
W3 3 1.5 0.3 0.2 0.27 m3
3)VENTILATION
V 2 1.2 0.3 0.2 0.144 m3
8) DEDUECTION QTY 8.178
9) NET QTY 42.102
ESTIMATION
SL NO PARTICULARS NOS L(mm) B(mm) D(mm) QTY UNIT EXP NOTES
1) EXCAVATION:
FOR 30CM WALS 1 152.4 1.2 1.25 228.6 m3 CL-N*B/2
COLUMN FOOTING 7 0.9 0.9 0.9 1.1 m3 162-16*1.2/2
DRAWF WALL 1 40.4 0.9 0.65 23.63 m3

CC BED
30*30 1 152.4 1.2 0.2 36.57 m3 CL-N*B/2
DRAWF WALL 1 40.4 0.9 0.2 7.27 m3 162-16*1.2/2
L=43.7-7*0.3
-0.9
2) SSM
FOR 30*30
1ST FOOTING 1 154.4 0.9 0.6 83.52 m3 162-16*0.9/2
2ND FOOTING 1 157.2 0.6 0.45 42.44 m3 162-16*0.6/2
3RD FOOTING 1 158.4 0.45 0.45 32.07 m3 162-16*0.45/2

DRAWF WALL
1 41 0.6 0.45 11.07 m3 43.7-7*0.3
1ST FOOTING *0.3/2
1 41.5 0.45 0.45 8.33 m3 43.7-7*0.3
2ND FOOTING *0.45/2

3) BBM
30CM WALL 1 159.6 0.3 4 191.52 m3 162-16*0.3/2
PARAPET WALL 1 1.23 0.3 0.75 27.67 m3 L1=30.8*2=61.6
WALL ABOVE 1 42.3 0.3 1 12.84 m3
VERANDH L2=18*2=36
BEAM L3=12.7*2=25.4

TOTAL 232.04 (17.7+0.3+


2(10.3-
0.3)+2*2.1))=42.8
4) DEDUCTION OVER
OPENING
DEDUCTION OVER
OPENING
D 9 1.2 0.3 2.4 7.77 m3
W 21 1.5 0.3 1.5 14.17 m3
V 6 1.2 0.3 0.6 1.29 m3

OVER LINTEL
D 9 1.5 0.3 0.15 0.6 m3
W 21 1.8 0.3 0.15 1.7 m3
V 6 1.5 0.3 0.15 0.4 m3
NET QUANTITY= 20.607
5) RCC WORKS
1)COLUMN FOOTING
QTY BY
0.9 0.9 0.15 0.8505 m3 PRISMOIDAL
a)LOWER PORTION FORMULA

b)PRISNOIDAL 7*0.135 0.945 m3 Q=


PORTION H/6(A1+A2=4AM)

2)COLUMN 7 0.3 0.3 3.75 A1=0.9*0.9


A2=0.3*0.3
AM=0.45 H=0.3
HT OF COLUMN=(2.5+0.15+0.45+1.1-0.3-0.15)

3)LINTEL OVER
D 9 1.5 0.3 0.15 0.6075 m3
W 2.1 1.8 0.3 0.15 1.705 m3
V 6 1.5 0.3 0.15 0.405 m3

4)BEAMS
ROOM 2 4.46 0.3 0.38 1.016 m3 L=L+BEARING
3 5.46 0.3 0.38 1.817 m3 D=0.5-SLAB
THICKNESS
D=0.5-0.12=0.38

OVER COLUMN 1 CL1=43.7 0.3 0.5 6.555 m3

6) CC FLOORING FOR 5 7 5 175 m3


CLASS ROOM 5 3.2 5 1.8 m3
ESTIMATION
SL NO PARTICULARS NOS L(m) B(m) D(m) QTY UNIT EXPLANTORY NOTES
1) EARTH WORK EXCAVATION:
a)COLUMN FOOTING 14 1.35 1.35 1.25 31.89 m3 L=CL-N*FOOTING BED WIDTH
b) WALL FOOTING 1 54.02 1 0.8 43.21 m3 72.92-14*1.35
TOTAL 75.1 m3 54.02
2) BED CONCRETE 1:4:8
a)COLUMN FOOTING 14 1.35 1.35 0.1 2.55 m3 L=72.92-14*1.2
b) WALL FOOTING 1 56.12 1 0.1 5.61 m3 56.12
TOTAL 8.16 m3
3) SSM IN CM 1:6
1ST COURSE 1 72.92 0.75 0.2 10.93 m3
2ND COURSE 1 72.92 0.6 0.2 17.5 m3
3RD COURSE 1 72.92 0.45 0.45 14.76 m3
DEDUCTION COLUMN 14 0.375 0.3 1.05 1.65 m3
TOTAL 44.84 m3
4) BRICK MASONARY
UPTO WALL PLATE 1 72.92 0.23 5 83.85 m3
GABLE PORTION 2 12 0.23 5.52 m3 A=1/2*12*2*=12
TOTAL 89.37 m3
5) DEDUCTION OVER
OPENING
D 1 1.2 0.23 2.1 0.57 m3
W 12 2 0.23 1.5 8.28 m3
V 12 2 0.23 0.75 4.41 m3
ROOLING SHUTTER 2 9 0.23 3 5.52 m3
DEDUCTION SHUTTER 14 0.3 0.23 5 4.83 m3
LINTEL DEDUCTION
a)OVER LINTEL SIDE 2 22.36 0.23 0.2 2.05 m3
b)OVER W/V 2 2.3 0.23 0.2 0.21 m3
c)OVER RS 2 4.3 0.23 0.2 0.39 m3
DEDUCTION QTY 25.99 m3
NET QTY 63.38 m3
6) ROOF PORTION
a)STEEL QTY
NOTE:NO OF TRUSS=5 AT
TRUSS PORTION WEIGHT OF TRUSS= 20KG END OF WALL, ITS GABLE
END, SO NEED OF
SPAN L=12+2*0.23=12.46 PROVIDING TRUSS THEIR.
QTY=5*12.46*20KG=1246

NO OF PURLINS=
PURLINS
2*5=10NOS

WT OF PURLINS= ASSUMING 0.5M


4054KG/M PROJECTION

L=24+2*0.23+2*0.5=25.46
QTY=10*25046*4.54=
1155.88KG

SLOPED LENGTH=
AC SHEET ASSUMING 0.5M
6^2+2^2=6.32M
PROJECTION
ROOF B=6.32+0.5=6.80M
L=0.23+0.23=(0.5)*2+25.46
AREA=2*6.8*25.46=
346.25m2
SANITARY FITTING AND FIXTURES
SL NO PARTICULARS NOS L(mm) B(mm) D(mm) RATE AMOUNT
1 BATHTUB 1 50500 50500
2 BIDET 1 1600 1600
3 SINK 1 2250 2250
4 WASH BASIN 1 6000 6000
5 WASH TROOUGH TAPE 1 600 600
6 HEALTH FAUCEL 1 800 800
7 TOILET SEATS 1 3875 3875
8 WATER CLOSET 1 3000 3000
9 FLUSHING CISTERNS 1 1200 1200
10 SHOWER 1 2000 2000
11 ANGLE COCK 1 200 200
12 GRAB BAR 1 500 500
TOTAL 72525
WATER SUPPLY FITTING AND FIXTURES
SL NO PARTICULARS NOS L(mm) B(mm) D(mm) RATE AMOUNT
1 BATHTUB 1 50500 50500
2 SINK 1 22500 2250
3 URINAL 1 1500 1500
4 TAP 1 300 300
5 TOILET 1 2000 2000
6 ELBOW 1 150 150
7 CROSS TYPE 1 500 500
8 UNIONS 1 600 600
9 TEE TYPE 1 116 116
10 REDUCER 1 237 237
11 OLET 1 500 500
12 SHOWER 1 2000 2000
TOTAL 60653
ELECTRICAL FITTING AND FIXTURES
SL NO PARTICULARS NOS L(mm) B(mm) D(mm) RATE AMOUNT
1 RIGID COUPLING 1 140 140
2 90ELBOW 1 75 75
3 EQUAL TEE 1 335 335
4 BRANCH PIPE 1 775 775
5 HASES BOX 1 1975 1975
6 SINGLE HYDRAT 1 3500 3500
7 TABLE LAMP 1 530 530
8 CEILING LIGHT 1 780 780
9 DESK LIGHT 1 400 400
10 WORK LIGHT 1 2550 2550
11 REVOLVING NOZZLE 1 5000 5000
12 UNDER WATER LAMP 1 2250 2250
TOTAL: 18310
SL NO PARTICULARS NOS L(m) B(m) D(m) QTY UNIT EXPLANTORY NOTES
1) EARTH EXCAVATION: 1 3.02 1.8 5.436 m3 L=D^2/4
D=1.2+0.23+0.23+0.15+0.15
1.96
2) FOUNDATION 1:4:8 1 1.43 0.53 0.15 0.114 m3 L=I ID
D=1.2+0.23/2+0.23/2
3) BRICK WORK 1 1.43 0.23 1.53 0.503 m3 L=I ID
D=1.2+0.23/2+0.23/2
4) FILLING OF BROKEN BRICK
FILTER MEDIA(WITH SAND) 1 1.13 0.45 0.51 m3 L=I ID
D=1.2
5) COVER SLAB IN RCC 1:2:4 1 1.13 0.12 0.23 m3 L=I ID^2/4
D=1.2

DEDUCTION 1 0 0.15 0.12 0.036 m3


MAN HOLE NET QTY=0.194 m3

RAIN WATER HARVESTING


SL NO PARTICULARS QTY UNIT RATE AMOUNT
EARTH WORK IN
1 5.436 m3 150 815.4
EXCAVATION
2 FOUNDATION 0.114 m3 3500 399
3 BRICK WORK 0.503 m3 3000 1509
4 FILLING OF BROKEN BRICKS 0.51 m3 3000 1530
5 COVER SLAB IN RCC 0.194 m3 2000 388
TOTAL 4641.4
ADD 3% OF CONTIGENCIES 139.24
ADD 2% WORK CHARGE ESTABLISHMENT 92.83
TOTAL 4873.47
P
RAIN WATER HARVESTING
SL NO PARTICULARS QTY UNIT RATE AMOUNT
1 EARTH WORK IN EXCAVATION 5.436 m3 150 815.4
2 FOUNDATION 0.114 m3 3500 399
3 BRICK WORK 0.503 m3 3000 1509
4 FILLING OF BROKEN BRICKS 0.51 m3 3000 1530
5 COVER SLAB IN RCC 0.194 m3 2000 388
TOTAL 4641.4
ADD 3% OF CONTIGENCIES 139.24
ADD 2% WORK CHARGE ESTABLISHMENT 92.83
TOTAL 4873.5