0% found this document useful (0 votes)
307 views1 page

Docking Plan

Uploaded by

Jose Ferrer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
307 views1 page

Docking Plan

Uploaded by

Jose Ferrer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ABT.53.

97M A/B
PLAN HISTORY
ALT. CONF.

DOCKING PLAN
NO. DATE DESCRIPTION
NO. BY
1 2004.06.11 PREPARED BY GENERAL DESIGN
HELI DECK

SHIPNA ME BOA RD
D DECK TOP

D DECK

C DECK
PROFILE
B DECK

A DECK
TOPSIDE AREA
HALF PIPE
DECK STORE
( 1000) (C)

NO.6 C.O.T (P&S) NO.5 C.O.T (P&S) NO.4 C.O.T (P&S) NO.3 C.O.T (P&S) NO.2 C.O.T (P&S) NO.1 C.O.T (P&S) BOSUN STORE (S)
F.W.T (P&S) (C) (S)
MACHINERY SPACE
CONTROL ROOM 2ND DECK
(21300 A/B)
(P)
(S)

S.L.W.L.

S)
VOID (C)

&S
(S)

(P&
(P
(P)
A.P.T (C)

T
(P/S)
3RD DECK

O
S) S) S) S) S)

PT
(14500 A/B)
)

D.
ICCP (P/S) (P/S)

&S & & & & &

M.
P (P (P (P (P (P
T(

S LO
.T
(P)

. .T .T .T .T

R-END LINE
Q'TY LIFE
(S)
.B .B .B .B .B .B
TYPE SIZE INSTALLATION PART (S)
(P,S) (P/S)
W W W W W W
(Pcs) YEAR 4TH DECK
.6 .5 .4 .3 .2 .1
R-
EN
DL
(8550 A/B)
NO NO NO NO NO NO F.P.T (C)
- FR.45+ 400, 4500A/B (P&S) 2 MAKER INE
RECESSED ZINC HULL CUT'G (S)
(P/S)
PUMP ROOM
REF. CELL & COFF. 96 - FR.88+1500, 4500A/B (P&S) 2
ABT. CorrsTech HIGH
SEA
20 Korea Ltd SKEG(P&S) CHEST
T.TOP SIDE TANGENT LINE SIDE TANGENT LINE
MMO/TITANIUM - FR.31+ 400, 4500A/B (P&S) 2 LOW BILGE BILGE
(2200 A/B)
SIDE TANGENT LINE
S.C
2438 X 760 SEA
CHEST
WELL M.D.O WELL
OVERFLOW (P&S)
LINEAR ANODE & COFF. - FR.84+2300, 4050A/B (P&S) 2 B.L. BILGE
HOLDING TK DRAIN TK

A.P 10 20 30 40 50 55 60 65 70 75 80 85 90 100
F.S.:0.8m W.S.:4.6m W.S : 4.60m W.S : 4.60m F.S : 0.80m

14.40m 21.60m 32.20m 32.20m 32.20m 32.20m 32.20m 32.20m 18.80m

DRAFT MEASURING (14.40m) (36.80m) (46.00m) (78.20m) (110.40m) (142.60m) (174.80m) (207.00m) (239.20m)
MMO TITANIUM ANODE & COFFERDAM RECESSEED ZINC REF. CELL & COFFERDAM MMO TITANIUM ANODE & COFFERDAM RECESSEED ZINC REF. CELL & COFFERDAM

HOSE ASSEMBLY
MAX PLATFORM
. WO
RKIN
GR
ANODE ADIU
S 30
00 0

TYPE SIZE INSTALL PART Q'TY LIFE YEAR FOR OFFLOADING


SPREAD MOORING UPPER DECK PLAN
HIGH SEA CHEST(P) 6 ABT.10
AL - ANODE 500 X 130
LOW SEA CHEST(S) RE M
3
S TO OR
F
*
K
SEA CHEST(FR.36~FR.39) 3 DE
C AT
A PL
E
SEA CHEST(FR.39~FR.43) 3 AR

T
UP
W N

EN
PAD EYE WITH
CHEST(FR.90+1000~FR.95)(P/S) 4 UPS BATTERY
YDO SNATCH BLOCK
ROOM ROOM UP
L A

TM
EM'CY WOMAN'S MEN'S

KI D
GENER. CHANGING CHANGING

RE
ROOM ROOM
ROOM

S
GARBAGE

MP
.T
STORE MEAT
IT

PU
W
G UN
INCINERATOR

S.
FISH IN
AREA LKR
T ER
LBY ME
VEGETABLE ELEC. ELECTRIC
UDE PIG RECEIVER
AIR TRUNK EQUIPMENT CR
LOCK CASING ROOM(EER)
C.L.
PAINTING AREA A.P 10 20 UP30 40 50 55 60 65 70 75 80 85 90 100
EM'CY PIG LAUNCHER

HANDLING SPACE
EQUIP. (FUTURE)
LOCATION AREA(M 2 ) BRAND NAME & COLOR X DFT COAT DRY ROOM

PROVISION
PROVISION HYD. POWER
STORE PIPE
UNIT ROOM
ENA300 BRONZE X 150 1ST DUCT
SPACE FOR VALVE DN

UP
TOP SIDE 5635 ENA301 ALUMINUM X 150 2ND CONTROL
E/R HATCH
ECY999 BLACK X 100 3RD AIR

T
DN
HANDLING
ECY999 BLACK X 100 4TH UNIT ROOM UP
PAINT I.G.S
FOAM
B / STORE

STORE RM INTAKE TRUNK


AIR
ENA300 BRONZE X 150 1ST ROOM &
FIRE
ENA301 ALUMINUM X 150 2ND CONTROL
SIDE BOTTOM 11428 GREASE/ STATION 0
FAJ034 GRAY X 50 3RD OXY. ACE.
ROOM ROOM
CHEMICAL
LOCKER 1 50
0
US
BQA341 BROWN X 125 4TH 'CY UP ADI
EM XIT R
E G
5TH KIN
BQA346 PINK X 125 W
OR *

X.
BQA347 RED X 100 6TH MA

ENA300 BRONZE X 150 1ST


ENA301 ALUMINUM X 150 2ND
FLAT BOTTOM
FAJ034 GRAY X 50 3RD
ACCOMODATION LADDER
BQA341 BROWN X 125 4TH
BOAT LANDING DOCK
BQA346 PINK X 125 5TH
BQA347 RED X 100 6TH
12145

SEA CHEST INSIDE


ENA300 BRONZE
ENA301 ALUMINUM
X 150
X 150
1ST
2ND
DRAFT MEASURING

BOTTOM TANGENT LINE / 24000 OFF C.L.


TANK TOP PLAN
FAJ034 GRAY X 75 3RD
BQA716 L/GRAY X 100 4TH COFFERDAM (P)
BQA737 L/GRAY X 100 5TH ) ) ) ) )
(P (P (P (P (P )
BQA757 GRAY X 150 6TH H.S.C . T T T T T (P
W
.B . B. . B. . B. . B. .T
.6 W W W W .B S.C(P)
BO
TT
B/W
NO .5 .4 .3 .2 W O
M
SKEG INSIDE 1178 ENA300 BRONZE X 150 1ST NO NO NO NO .1 TA

NO
NG
S.C EN
T
LI
N
SLOP T(P) E

NO.6 C.O.T (P) NO.5 C.O.T (P) NO.4 C.O.T (P) NO.3 C.O.T (P) NO.2 C.O.T (P) NO.1 C.O.T (P)
PUMP ROOM

C.L. 34

10 20 30 B/W 40 50 55 60 65 70 75 80 85 90 100
SYMBOL MARKS

)
BILGE

.(C
POSITION HOLDING
SYMBOL NAME TANK(S) M.D.O. NO.6 C.O.T (S) NO.5 C.O.T (S) NO.4 C.O.T (S) NO.3 C.O.T (S) NO.2 C.O.T (S) NO.1 C.O.T (S)

.T
OVERF.
LOCATION ABOVE B.L OFF C.L

F.P
/DRAIN
L.S.C TANK(S)
DRAFT MEASURING (AFT) FR.19+600 2450 350(P)
SLOP T(S)
(MID) FR.66+745 BOTTOM 19750(P/S) SEPARATED
BLIGE OIL
S.C THIS DRAWING OR DOCUMENT IS THE SHI'S PROPERTY AND MUST NOT
(FWD) FR.90+867 BOTTOM 1395(S)
TANK(S) NO BE COPIED, REPRODUCED OR USED FOR ANY PURPOSE OTHER THAN
NO NO NO NO DRAFT MEASURING
.1 THIS PROJECT WITHOUT SHI'S PRIOR WRITTEN PERMISSION.
NO . . . . W
BHD MARK SEE ARR'T OF BHD MARK(DWG. NO.:SF091.30) B/W
.6 5 4 3 2 .B
W W W W W . T
S.C(S)
22 25 30 34 45

.B .B .B .B .B (S
.T .T .T .T .T )
(S (S (S (S (S
) ) ) ) )
COFFERDAM (S)
BOTTOM TANGENT LINE

DRAFT MEASURING
PRINCIPAL DIMENSIONS
DETAIL OF AL - ANODE(SAB-201-0138 TYPE) B) A/
A/ 00
B )

0 A/B) 0
60 (2
2
(855
(NON SCALE) (3
C/D LENGTH O. A. Approx. 264.371 m
HIGH
SEA CHEST LENGTH B. P. 258.0 m
SKEG BODY PLAN BREADTH (MOULDED) 52.0 m
FLOOR PLAN DETAIL OF DOCKING BRACKET MIDSHIP SECTION 20000

UP
(NON SCALE) 3200 22800 OFF C.L
CAMBER ;R 600 30WL

BULWARK TOP LINE


30WL
DEPTH (MOULDED) 27.2 m

600
UPPER DECK
UPPER DECK

DESIGNED DRAUGHT (MOULDED) 18.25 m

800
PUMP ROOM (27200 A/B)

27200A/B
25WL 25WL

TOP SIDE
* HULL STRUCTURE FOR BOTTOM STRENGTHING SCANTLING DRAUGHT (MOULDED) 18.25 m
IS ARRANGED ADDITIONALLY IN BETWEEN EVERY
A.P.TK MAIN FRAMES AS FOLLWING FIGURES. (FR.46 ~ FR.90) 20WL 20WL
NO.1 STR.
(19600 A/B) DETAIL OF BILGE KEEL
C.L. (NON SCALE)
A.P. 4 9 13 18 22 25 30 34 39 46

INNER BOTTOM

FR10
FR15
FR20
2800 A/B

FR5

A.P
15WL 15WL

0
00
R2
NO.2 STR.
A (13650 A/B)
R250
DOCKING BRACKET
SIDE BOTTOM
1790 DEPT.NO : 2 2 0 CLASS : ABS SCALE :1/300 DATE : 2004.06.11
600X12 + 150X12 FB A.P

(HALF-WEB SPACING)
400 X 100 X 13/18 I.A AH PAD ; 75 X 14 FB AH
12+100FL
LANDING
SPACE
B
10WL
FR5
10WL MANAGER TITLE : Corocoro Field Development 1,300,000 bbls FSO
LOW

SKEG LINE
BOTTOM SHELL
SEA CHEST NO.3 STR. SHIP NAME : NABARIMA OWNER : Conoco Venezuela C.A.

FR103

FR101
FR111

FR107

FR105
FR109
FR113

FR99

FR91
FR97

FR95

FR93
UP (7700 A/B) FR10
R100

5WL R-END LINE(5000A/B) 5WL


FR15 CHECKED BY
4WL

INNER BOTTOM 3WL


SKEG
UP
* WORNING NOTICE FR20
R-END LINE 2WL Y. C. HYUN DOCKING PLAN
A
DRAWN BY
1. DOCKING BLOCKS TO BE ARRANGED TO THE POSITIONS R250 DOCKING BRACKET
R2000
EM'CY B (HALF-WEB SPACING) 1WL
EXIT R2000 R2000
TRUNK
UP
OF FRAMES AND LONGITUDINAL GIRDERS. BASE LINE BOTTOM SHELL B.L B.L
20
.5

B/KEEL
D

R100
H

25BL 20BL 15BL 10BL 5BL C.L 5BL 10BL 15BL 20BL 25BL
LON.SPACE:835X7 LONGL. SPACE : 895 x 20
26000 OFF C.L 17900 OFF C.L

50
PIMS. NO. 2208-14000-81-0003

R2
C/D FLAT BOTTOM 12 HULL NO.: 1534
DWG. NO. PF401.41 0

SA MSUNG HEAVY INDUSTRIES CO. , LTD.

DWG. SIZE : 840 X 1442

You might also like