Job Hazard Analysis
Project Name : TotalEnergies Marketing India Private Limited
Name of Contractor:- Consep engineering pvt ltd
Month:- November 2024
Tools:- Hydra Crane, D shackles, Lifting belt, Hand breaker, Hand Tools, Groove cutting machine, Dewatering pump
Sr.
Project Activity Sub Activity Hazard Threat Barrier Recovery Measure Consequnce Remark
No.
1. Ensure all person shall be physical fit for the job and age above 18year.
2. Safety training is conducted by HSSE Department.
3. Provide the appropriate personal protective equipments such as helmet,
goggles,safety shoes,fluroscent jacket, hand gloves and ensure that PPE is using
properly.
1. Slip trip,fall hazard. Provide the first aid on
4. Making safe access for pedastrian & vehicle movement.
Mobilization of Man 2. Lack of skill awareness. immediate basis, ERT
1. Untrained people 5. Provision of safe access for height work. Injury to people
Power 3. Uneven access. member should be
6. Removed all obstraction from access way.
4. Not using PPE available at site location
7. Specific visual control signages to be displayed at location site.
8. Adequate compaction of loose soil is to be done including equipments movement
area.
9. Ensure the PTW procedure.
10. Conduct the TBT.
1. Ensure all tools inspected.
2. Ensure provide of safe access .
1. Slip trip,fall hazard. 3. Arrange the TBT before start any activity. Provide the first aid on
Manually shiffting of 2. Lack of skill awareness. 1. Lack of awareness 2. 4. Cover the hazards points which related to task. immediate basis, ERT
Injury to people
material 3. Uneven access. Lack of supervison 5. Use all adequate PPE's. member should be
4. Not using PPE 6. Ensure PTW procedure. available at site location
7. Conduct the TBT.
1.Ground condition must be levelled and compacted.
1. Uneven ground condition.
2.LIfting material must be secured at both end with guide rope.
2.Machenical Failure.
3.Ensure Lifting tools and tackles TPI certificate should be valid
3.Collision with near be
4.Ensure all the lifting gears are in good condition.
stucture.
1. Ground surface not 5.TBT must be conducted related with activity.
4.Deffective lifting tools &
Base frame will be compacted and level 6.Lifting plan must be prepared prior to every lifting
tackles.
removed and it will lift 1.Poor maintanence 7.Area should be barricated Provide the first aid on Personnel Injury,
5.Fall of material.
up by using hydra crane 2.Lack of Supervision 8.Do not allow to anyone to stand or work below the suspended load and boom. immediate basis, ERT Hand and eye injury
6.Adverse weather condition.
with the combination of 3.Lack of awareness. 9.No lifting should be carried out during the dark hours. member should be and property
7.Pinch Point
D shackles and lifting 4. Taking short cuts 10.Assign the rigger for lifting & shifting activities. available at site location damage
8.Over load
belts 5. Untraind operator 11.Only trained workers should be deployed.
9.Over head obstruction
12..Ensure Proper use of PPE's
10.Structural collapse.
13.Continue supervison by supervisor and safety person must be there.
11.slip/trip/Fall Hazard
14.Ensure free access from of any obstruction.
12. Improper housekeeping
15. stop the activity during rain storm or heavy wind .
16. ensure proper housekeeping before & end of the work.
1. Ensure hard barrication should be provided before start excavation.
2. Machine should be inspected and certified by engineer, cables should be in good
condition, supply only through 30mA ELCB or RCCB is allowed,
3. Ensure before start excavation check underground utilities
4. Ensure any found of underground utilities immediately informed to company area
supervisor.
1. Slippery / Uneven 5. Ensure During excavation H2s gas tester must be required at work location.
1. Slip trip fall hazard ground surface / poor 6. Before Entery of excavation pit , Ensure gas test must be test when required.
2. Sharp edges of the material housekeeping. 7. Ensure PTW procedure to be follow.
3. Damaged elctric cables 2. Not using Ppe's 8. Tool Box Talk conducted before start activity.
4. Use of improper machines, 3. Sharp edge of 9.Cover the hazards points which related to task, Like under ground utility H2s gas Provide the first aid on
Manually excavation by 5. Electric shock conceret pieces. hazard. immediate basis, ERT
Injury to people
using breaker 6. Flying Particales 4. Lack of inspection. 10. Ensure supervisor should be on site, member should be
7. Sharp edges & open steel 5. Lack of underground 11. Use all adequate PPE's. available at site location
bar at inside excavation utility Electric cable. 12.During excavation and material shiftting, Ensure company utilitys property not
8. Open pit 6. Digging of conceret damaged.
breaking. 13.If earthing strip its seen during excavation cut the strip and connect it to another
earthing strip.
14. Polythene sheet should be fixed properly after the foundation work.
15. Shoring should be fixed when required.
WEIGHING BRIDGE
16. Open steel bar should be cut by grinding machine
EXTENSION WORK
17. Excavation must be covered in hard barrication.
1
1. Ensure proper PPE for working Crew.
Provide the first aid on
2. Ensure PTW Procedure.
Use of concrete mixer 1. Slippery surface immediate basis, ERT
Lack of awareness 3.Ensure Tool Box meeting before start work. Injury to people
m/c for PCC 2. Flying Objects member should be
4. Ensure area should be barricated.
available at site location
5. Ensure wheelbarow should in good condition.
6. .Removed all obstraction from access way.
1. Ensure all person shall be physical fit for the job and age above 18year.
2. Ensure only trained person deployed for the work.
3. Conduct the safety training .
4. Provide the appropriate personal protective equipments such as helmet,
Provide the first aid on
1. Improper hand tool goggles,safety shoes,fluroscent jacket, hand gloves and ensure that PPE is using
immediate basis, ERT
Steel Fixing for rafter 2. Slip trip fall Lack of awareness properly. Injury to people
member should be
3. Pinch point 5.Provision of safe access .
available at site location
6.Removed all obstraction from access way.
7. Specific visual control signages to be displayed at location site.
8. Ensure proper material handiling techniques.
9. Maintain good housekeeping at all times.
1. Ensure Before start work H2s gas test must be required.
2 Ensure all person shall be physical fit for the job and age above 18year.
3. Ensure only trained person deployed for the work.
1. Slip trip fall
4. Safety training is conducted by HSE Department.
2. Pinch point Provide the first aid on
1. Manual Handlin 5. Provide the appropriate personal protective equipments such as helmet, Injury to people and
Shuttering & 3. Fall of shuttering plate immediate basis, ERT
2. Improper hand tool goggles,safety shoes,fluroscent jacket, hand gloves and ensure that PPE is using damage of the
deshuttering during shifting and fixing member should be
3. Lack of awareness properly. property
4. Collapse of shuttering due available at site location
6.Provision of safe access .
to overload/ improper locking
7.Removed all obstraction from access way.
8.Method Statement to be followed.
9. Shutting Locked and Support should be checked before pouring the material.
1. Check all rotating part must be covered
2. Ensure do not touch on rotating part
3. Be mind ful during work
4. Proper supervison must be provided
5. Must be wearing proper PPE’s as per requirement
6. Remove all obstruction in work location
1. Cut hazard by sharp parts Provide the first aid on
1. Manual Handlin 7. Follow Groove cutting machine manual and operating instruction Injury to people and
Groove cutting by using 2. Slip trip fall immediate basis, ERT
2. Improper hand tool 8. Ensure groove cutting machine manual must be available at work location damage of the
groove cutting machine 3. Fyling object member should be
3. Lack of awareness 9. Certify Operator must be oprate groove cutting machine property
4. Rotating part available at site location
10. Ensure area must be in barricaced and do not enter the unauthorized person while
working inside barrication
11. Periodic inspection of cutting wheel while working
12. Daiuly visual inspection checklist must be follow
13. TBT must be conducted before work start
1. Conduct the safety training .
2. Provide the appropriate personal protective equipments such as helmet,
goggles,safety shoes,fluroscent jacket, hand gloves and ensure that PPE is using
properly.
1. Slip trip fall 1. Manual Handlin 3.Provision of safe access . Provide the first aid on
Injury to people and
Dewatering by using 2. Pinch point 2. Improper hand tool 4.Removed all obstraction from access way. immediate basis, ERT
damage of the
pump 3. Uneven access. 3. Lack of awareness 5. Specific visual control signages to be displayed at location site. member should be
property
4. Electric shock 4. Slipery floor 7. Ensure proper material handiling techniques. available at site location
8. Maintain good housekeeping at all time
9. ELCB board must be used
10. Ensure electrical cable must be in good condition
PREPARED BY CEPL