Final Report Li
Final Report Li
SESI II : 2023/2024
i
INDUSTRIAL TRAINING FINAL REPORT
BY
ii
STUDENT DECLARATION
I acknowledge this industry training report is the result of my own work, except excerpts and
summaries for which the original references are stated herein.
Signature : …………………………...……………….
Student ID No : 24DKM21F1051
Date :
I declare that this Industrial Training Final Report was written by the above candidate in accordance with
the regulations and the follow format established by the Politeknik Banting Selangor.
Signature : ……………………………………………..
Lecturer Name :
Date :
Official Stamp :
iii
ABSTRACT
This report serves the purpose to record the details of my industrial training which was
conducted at Amkor Technology Malaysia (also known as ATM), one of the world’s largest
providers of outsource semiconductor assembly and test services (OSAT). This report will
cover the details of my internship in the Mechanical Engineering Department for a duration
of 20 weeks which began from 29 January 2024 until 14 June 2024 at ATM that located
at Telok Panglima Garang, Kuala Langat, Selangor.
This report consists of 6 chapters and that are introduction to industrial training,
company background, industrial training activities, technical reports, conclusion,
comments and recommendations.
The training gave me good experience from the view of implementing my theoretical
knowledge in practical aspects. It helped me in improving my technical, interpersonal
and communication skills. Overall, it is a great experience to have industrial training in
such a reputed firm and I believe that it will help me in building a successful career.
iv
ACKNOWLEDGEMENT
First and foremost, I am expressing my thankfulness and praise to Allah for His
guidance and blessings throughout my entire industrial training period also for giving me
strength to complete my final report. This industrial training final report would have not
been carried successfully without the cooperation from many parties who contributes in
preparing and completing this study. Therefore, I feel that it is important for me to express
my greatest gratitude to all the wonderful people who had helped me in different ways
throughout this period.
I would like to thank Polytechnic Banting for conducting this industrial training which
benefits the students in different aspects. I also want to thank the Head of Industrial
Training Unit Dr. Vaina Vee Jane for the help before, during and after the industrial training
period.
Other than that, I would like to express my greatest gratitude to Amkor Technology
Malaysia which had provided me the wonderful opportunity to undergo my industrial
training with the company. I also would like to thank all the people whom I had met during
my internship period in ATM. These include my seniors, colleagues and the other staffs
here who had helped me a lot along these 20 weeks.
Thanks to my supervisor, Mr. Mat Habeha Bin Jusoh for the supervision and guidance
to me along this journey. The understanding, encouragement and continuous support from
his throughout the duration of fulfilling this assignment are most appreciated.
In a nutshell, I would like to dedicate special thanks to my family and my friends for their
continuous support and understanding during this period. They helped me a lot in
completing the industrial report, and without their help and advice, I could not able to do
the industrial training report well.
v
TABLE OF CONTENT
Title Page i
Abstract iv
Acknowledgement v
Table of Content vi
List of Figure ix
1.1 Introduction 11
2.1 Introduction 23
vi
3 TECHNICAL REPORT
3.1 Safety 32
3.2.1 Introduction 37
4.1 Conclusion 50
4.2 Recommendation 52
4.2.1 Students 52
4.2.2 Polytechnic 53
4.2.3 Organization 54
REFERENCE 55
vii
LIST OF TABLE
8
LIST OF FIGURE
9
10
CHAPTER 1
The Industrial Training module is a main component in the learning curriculum for the Polytechnic
of the Ministry of Higher Education (MOHE). All students must complete industrial training as a
partial fulfilment of the requirements for the Diploma in Mechanical Engineering. This program
exposes students to real-world situations in the field of mechanical engineering and serves as a
prelude to the working world. For session II 2023/2024, the industrial training performs for 20
weeks starting from 29 January 2024 until 14 June 2024.
With the guidance of lecturers and UPLI PBS, I sought and get hired at Amkor Technology
Malaysia Sdn Bhd. I was assigned to the Department of Manufacturing Engineering B (MEB). I’ve
got learned and explored along with Facilities Department (FD) and Machine Shop Department
(MSD). The working culture on this company is not only in the field of engineering but mixed with
the admin part to learn various fields.
11
1.2 Objective of Industrial Training
A polytechnic's target is to figure out successful, excellent, and responsible students through
industrial training. The Industrial Relations and Training Unit (UPLI) has defined a number of
industrial training objectives that must be fully attained by the students through training to achieve
that goal. Among those objectives are the following:
Students will gain more knowledge about their actual line of work. Additionally, they will discover what
steps they must take to complete their assignments. This will enable the students to integrate easily
into their professional environment and meet demands upon the end of their course.
During their industrial training, students must follow through all firm rules and regulations, including
those related to safety, discipline, order, and any laws established by the company. Through this, it
shall be simpler for the students to become familiar with all the regulations and enter the workplace
without any issues.
Students will be able to evaluate themselves based on training that has been carried out for five
months in an organization. Through this self-evaluation, students can evaluate through the tasks
performed during the training by highlighting the characteristics of effective leadership and with the
initial exposure that students get, students can also give ideas to help improve the organization. In
addition, this is recorded as a confidential item in the industrial training book that will be reviewed and
filled in by the supervisor after the industrial training is over.
12
1.3 Importance of Industrial Training
It is common knowledge that the purpose of involving Industrial Training into Polytechnic
syllabuses is to equip students with the skills necessary to succeed in the real world of work.
Consequently, professional training plays a role in creating people's personalities. It is possible to
develop personalities through engaging in mental and physical demanding tasks. Additionally,
industrial training may increase students' awareness, enabling them to develop their
communication skills.
Additionally, in an effort to advance both the business and their own personal growth, students
can learn how to engage or communicate with each employee of the company as well as its
clients. Students can adjust to the workplace culture and environment throughout the company
with the help of this industry training. Furthermore, it is known to us how each employee behaves
and works, both positively and negatively, to carry out and finish a task that has been assigned to
them.
Furthermore, industrial training trains students in work ethics and conventions. This is because
each employee must adhere to all company policies to produce perfect job results. Maintaining
the company's reputation and preventing harm are both possible by following by its ethical
standards.
Thus, specific to an industry training can also indirectly help students develop and transform their
personalities and self-images into highly competent, self-assured individuals who can support
society in raising community awareness, capabilities, and living standards.
13
1.4 Organization Introduction
packaging and test services. Amkor pioneered the outsourcing of semiconductor packaging
and test services through a predecessor corporation in 1968, and over the years they have
built a leading position by designing and developing innovative packaging and test
strategic end markets that offer solid growth potential and cultivating long-standing
relationships with our customers, which include many of the world’s leading semiconductor
companies.
manufacturers (“OEMs”) and equipment and material suppliers. Besides that, they
in high-volume manufacturing processes and developing a reputation for high quality and
solid execution also providing a geographically diverse operating base, with research and
14
Amkor Technology Malaysia (ATM) is located at 15km, Jalan Klang- Banting, 42507 Telok
Panglima Garang, Kuala Langat, Selangor which is a very strategic location because it was
located at the free industrial zone (FIZ). FIZ is a place where most of the manufacturing
activities carried out are for export purpose. It is a facility meant for export-orientated
companies. Besides that, FIZ can also carry out other activities such as evaluation, testing of
ATM is assigned as one of the assembly and test facilities aside from Fukui, Fukuoka,
Hakodate, Kitsuki, Kumamoto and Usuki at Japan, Gwangju at Korea, Hukou Township
Taoyuan City and also Muntinlupa City and Binan Laguna at Philippines.
During my industrial training period at Amkor Technology Malaysia, I was instructed to work
under the person in charge which is my supervisor, Mr. Mat HAbeha. He is an engineer and
Amat.
15
Figure 1.3: Amkor Technology Malaysia (ATM) Location
Amkor Technology claims that they deliver defect-free products and provides flawless service
beyond customer expectations. Amkor delivers industry leading quality services to customers
through their Quality FIRST initiative. Quality FIRST is embedded in their processes
that, it also includes deliver zero defect products and services to their customers.
Another one is flawless execution across the entireorganization and job functions.
16
Figure 1.5: QualityFIRST Policy
guidelines. These are modeled to industry and internationally accepted standards. Amkor
systems, processes and worldwide manufacturing sites are equipped with the latest
17
1.4.3 Amkor Vision and Mission
Amkor Technology vision is to be the center of excellence for power packaging with 40 years
The mission of Amkor Technology is to be the trusted global provider of reliable assembly
18
1.5 Company Activities
Customer demand for highly sophisticated products has made semiconductor packaging a
semiconductor advanced packaging design, assembly and test services, Amkor helps make
Amkor works closely with substrate and software suppliers to drive next generation package
design. Their design engineers are trained experts and experienced in the latest design tools
and packaging technology. This enables theirWorld Class Design Centers to reduce design
lower cost. Amkor is an industry leader in finding semiconductor packaging solutions to meet
broad portfolio of packaging solutions including wire bond and flip chip using Pb-free and
green packaging.
Amkor provides a complete range of semiconductor test services including various types of
final, system level, wafer and strip testing and completeend-of line services up to and including
final shipping. We provide customers around the world with the electronic components they
need to grow their businesses. Amkor offers tape & reel, dry pack and warehousing services
19
1.5.1 Company Products
20
1.6 Company Organization Check
21
Figure 1.9: ATM Industrial Technician Training Organization
Chart
22
CHAPTER 2
2.1 Introduction
Every time supervisor give a task or work to students, it must be recorded in Industrial
Training Reflective Journal which has been provided by Polytechnic for student use.
Tasks or activities that has been done or witnessed by students must be recorded briefly
from start until end. It also need to be concluded every single week to make checking
process by supervisor easier. During my industrial training period, I have been exposed
with so many new things and knowledge. Aside from practicing all the theoretical things
that I have learned from Polytechnic, I also have been disclosed with the company’s
Students that undergo industrial training will come to work following the company’s terms. At
Amkor there’s three working hour available which is normalworking hour, morning shift hour
and night shift hour. As for me, I was instructedto work on normal working hour.
23
2.3 Industrial Training Activities Summary
2. Orientation
stopPDA machine
PDAmachine
5th February 2024 -
2 2. Device manual check on testing
8th February 2024
3. Preventive maintenance at PDA 12
part(Heater wire)
3
13th February 2024 -
3. Learn alarm PDA
16th October 2024
4. Preventive maintenance at VR2
(Doorbearing)
24
1. Repair heller machine
25
1. NDNC manual check at PDA 10
5. Preventive Maintenance at VR 1
26
1. Breakdown maintenance at machine heller
VR3
27
1. Make a data about type of family that
15th April 2024 –19th 3. Change solder and clean nozzle for PDA
12
April 2024 machine
heater)
( leaking valve )
door seal )
28
1. Preventive maintenance at VR3
29th April 2024 4. Learn with technician about how to converta PDA
14
- 3rd May 2024 machine
change SSR )
terminal block )
4. Preventive Maintenance at VR 3
13
29
1. Change Heater Plate BCOS at
PDA 17
machine
17
4. Change Ezhaust at VR 4
5. Preventive Maintenance at VR 5
4. Preventive Maintenance at VR 2
at machine PDA
Malaysia
31
CHAPTER 3
TECHNICAL REPORT
3.1 Safety
Safety is the condition of being protected against physical, social, spiritual, financial, political,
damage, error, accidents, harm or any other event which could be considered non-desirable.
Safety can also be defined to be the control or recognized hazards to achieve an acceptable
level of risk.
A safe work environment is a productive one. No matter the size or type of the business,
procedures for safety in the workplace are a necessity for all staff. Safety measures protect
employees as well as equipment and business property. Avoiding or minimizing injuries and
damage to equipment and facilities will result in fewer expenses and more profit for a
business.
Each business should have a safety policy in place, created either by management or in a
joint effort between management and staff. Every employee has a role in carrying out the
safety policies. A safety handbook should be created identifying safety issues and spelling
32
3.1.2 Hazard Identification
At first glance, the semiconductor industry looks sterile. Between the clean rooms and
personal protective equipment (PPE) such as gloves, gowns and respirators, conditions at chip-
making plants have been described as cleaner than the average hospital. On important notes,
electrostatic discharge can be extremely hazardous when working with semiconductors and
related components. Common work safety concerns can include ergonomics, presence of
falling and weather-related hazards. Issues with non-ergonomic equipment may cause human
health problems, including sore backs and carpal tunnel syndrome. Chemicals can explode,
Mechanical safety issues can occur related to the operation of any machinein the workplace.
Noise and visibility issues can compromise an employee’s hearing and sight. Falls resulting
from poor housekeeping or negligence can cause serious injury and death; procedures should
For electrostatic discharge problem, Amkor Technology Malaysia has practice several
precautions to eliminate it. Firstly, all production lines at Amkor Technology Malaysia are
limits.
line to eliminate electrostatic discharge which can cause damage or defects to electronic
products.
34
Shoes o prevents a build-up of static
electrical charges in the human
body by sending these charges
to the ground in a very safe and
controlled manner also prevent
the sudden flow of electricity
between electrically charged
objects
caused by contact.
Thirdly, to eliminate electrostatic discharge that can damage product, ATM also use Anti-
Static tools and equipment, lay ESD-Safe mat on table or work bench and ground it, use
ionizers (static eliminator) for ionization (charge mitigating) to neutralize the charge where
grounding is not possible and also use antistatic bags forpackaging PCB when transporting or
storage.
35
TOOLS OR EQUIPMENT PICTURE
Pen
Chair
Wrist Strap
Floor grounding
Mat grounding
36
3.2 Process Flow at M4XF Production Line
3.2.1 Introduction
M4XF is one of production line at Amkor Technology Malaysia. Every production
line has specific production depends on customers and packages. On M4XF, most
production is for SO8-FL, TSON8-FL, Vishey, Toshiba, PSMC and TOLL packages.
Most of production run at ATM are for discrete device. A discrete device (or discrete
component) is an electronic component with just one circuit element, either passive
(resistor, capacitor, inductor, diode) or active (transistor or vacuum tube), other than
an integrated circuit. The term is used to distinguish the component from integrated
circuits and hybrid circuits, which are built from several circuit elements in one
The process is divided into three parts which is Front of Line, Middle of Line and End
of Line.
37
3.2.2 PDA Machine (Canon BESTEM – D310/510)
During my industrial training, I was assigned to work at M4XF production line.
To be specific, I was placed on front of line (FOL) section. FOL process consist 6
process which is wafer mount, wafer saw, die attach, vaccum reflow, flux cleaning
frame by means of soldering/ Ag paste/ pellet/ clip. This process needs to be done
before move to wire bond process. In PDA there are using combination of four unit
of machine which is 2 unit of die bonder machine, 1 unit of clip bonder machine and
1 unit of reflow machine. Every machine has different task. For die bonder, this
machine needs to attach the die on the frame. Why the PDA need to use 2 unit of die
bonder machine because the die bonder needs to catch up with the clip bonder speed.
Clip bonder task is to attach the clip on the die. Reflow machine task is to heat the
lead frame to melt the solder paste. The solder paste will melt if expose to high
temperature, when the solder paste melted the solder paste will hold the clip and pellet
to the lead frame. Material use in this process are wafer (real shape of pellet before
38
3.2.3 Canon BESTEM – D310/510 Process Flow
At the die bonder 1, the machine is have doing only for the odd process which is when attach
the solder and pallet to the frame. At die bonder 2, the machine only doing for even which is
when attach the solder and pallet at the frame only do for even, but this 2 die bonder can be
setting if want to use 1 die bonder only for process “ clear lot “. This process is for the last
wafer that we need to used. This process will happen when last lot for the production.
At the clip bonder the machine is attach the solder again and insert the clip to cover the
pallet.The bonding head can cut the clip and attach to 14 pallet at one time, at the right of the
machine we have the slot for insert the clip, there to so many types of clip. After done for clip
bonder process, the product will go to machine BCOS VI, the function is to heating the solder
and make the solder will attach properly to frame and pallet.
39
3.2.4 Activities related to Canon BESTEM
During my industrial training period, there are several activities that I have
done related to Canon BESTEM. Here are the few activities that I have done:
40
2 Change solder paste
What : Need change new solder when solder
already reach their limit
Why : Every solder have the limit to prevent
oil in solder through the nozzle and course
nozzle logged
Where : Solder paste and nozzle
How :
1. Bring solder to discharge plate to remove
solder more easily
2. Loose the screw and take out the solder
carefully
3. Remove the nozzle and pressure host and
change with new solder paste
4. Then install back nozzle and pressurehost
5. After that, do piercing on discharge plate
to stabilize the solder paste
6. Lastly do ‘auto teaching discharge Z’
and auto teaching multi point’ on dummy
frame
41
4 Solve problem sensor cant
What : The pick up frame cant detect which
detect
one is paper or frame cooper
Why : The pick up was unable to identify the
copper frame and had thrown the frame into
a paper container
Where : Pick up from load frame to work
mechanism
When : During pick up from load frame to
work mechanism
How :
1. This problem occur because both sensor
do not touch frame, and sensor triggered
frame is a paper
2. When the position of the sensor is away
from the vacuum, the sensor cannot touch
because the frame is bent
3. Close the position of both sensors with a
vacuum
42
3.2.5 Heller machine (1809 MK III)
A test program was developed to evaluate the effectiveness of vacuum reflow processing on
solder joint voiding and subsequent thermal cycling performance. Area array package test
vehicles were assembled using conventional reflow processing and a solder paste that
generated substantial void content in the solder joints. Half of the population of test vehicles then
were re-processed (reflowed) using vacuum reflow. Transmission x-ray inspection showed a
significant reduction in solder voiding after vacuum processing. The solder attachment reliability
of the conventional and vacuum reflowed test vehicles was characterized and compared using
two different accelerated thermal cycling profiles. The thermal cycling results are discussed in
terms of the general impact of voiding on solder thermal fatigue reliability, results from the open
literature, and the evolving industry standards for solder voiding. Recommendations are made
for further work based on other void reduction methods andadditional reliability studies.
The vacuum reflow profile for the re-assembly process is shown in Figure 4.19. The red
rectangle denotes the total time the substrates were in the vacuum chamber, which is
approximately 60 seconds. This total time includes transport of the test vehicles in and out of
the vacuum chamber as well as pump down, refill and dwell times. The pump down time is 8
seconds, the dwell time at 10 torr vacuum is 20 seconds, and the refill time is approximately 5
seconds. The peak temperature in the reflow profile is achieved while the substrates are in the
43
Figure 3.5. Vacuum reflow profile used in the re-assembly process.
The total time in the vacuum chamber, outlined by the red rectangle, is 60 seconds. The
The vacuum chamber located within the convection reflow oven is shown in Figure 4.20with
Figure 3.6 : Vacuum reflow chamber shown within the convection reflow oven.
44
3.2.6 Activities related to Heller machine (1809 MK III)
During my industrial training period, there are several activities that I have
done related to Heller machine. Here are the few activities that I have done:
45
2 Change heater
What : The temperature that show on monitor
is lower and stuck from actual
Why : Because of the heater wire is tear
Where : XD-VR heller machine
When : While wait the machine to heat up
Who : Supervisor & Technician line
How :
1. Fisrtly must shut down the machine and
wait for machine to cool down
2. When the machine already cool down,
open inside the heater using adjustable and
allen key
3. Take out the problem heater with the wire
4. Change to the new heater and wire
5. Place it the heater to the origin place with
the correct position and make sure when close
the heater becareful to the sensor inside that
3 Change terminal block
What : The temperature that show on monitor
is lower and stuck from actual
Why : Because of the heater wire is tear
Where : XD-VR heller machine
When : While wait the machine to heat up
Who : Supervisor & Technician line
How :
1. Fisrtly must shut down the machine and
wait for machine to cool down
2. When the machine already cool down,
,open at the back of the machine
3. Take out the NG terminal block, when take
out the terminal block, wire heater must be
separate first
4. Using allen key, adjustable and screw
driver to separate the wire and terminal block
5. Take out terminal block and clean it using
scalpel and methanol
6. After done cleaning, place it to the origin
place and attach back the heater wire to
terminal block
46
4 Change Rapidox
What : The number of ppm that show in
monitor is not correct that can be problemafter
doing preventive maintenance
Why : Because the rapidox is already unstable
Where : XD-VR heller machine
When : After doing the preventive
maintenance
Who : Supervisor & Technician line
How :
1. Fisrtly make sure not running a machine
2. Open at the back of the machine
3. Before take out the rapidox, remove the
supply and wire connection from rapidox
using screw driver
4. Take out the rapidox and change with the
new rapidox
5. Connect the supply and wire to the new
rapidox and wait for a minutes until the rapidox
is done reading the value of ppm( must
below from 0.1 to get the ppm reading )
47
5 Change SSR
What : The temperature from monitor is not
change the colour to green light while the
temperature is already achieve the value
Why : Because of the problem inside the
machine that make the ssr problem
Where : XD-VR heller machine
When : While wait the machine to heat up
Who : Technian Expert
How :
1. Fisrtly make sure not running a machine
2. Open at the front of the machine
3. Before take out the ssr, switch off the
machine
4. Take the multimeter and check the watt of
each ssr until find the NG ssr
48
5. Remove the connector wire, board and
casing ssr using screw driver
6. Take off the NG ssr using screw driver
and remove the wire that connect to ssr
7. Before insert new ssr, make sure to attach
the ssr tape because the tape will function as a
heat transfer
8. Insert new ssr with correct position and
connect back all the wire that connect to ssr
6 Preventive maintenance
What : The temperature that show on monitor
is lower and stuck from actual
Why : Because of the heater wire is tear
Where : XD-VR heller machine
When : While wait the machine to heat up
Who : Supervisor & Technician line
How :
1. Fisrtly the machine must shut down and
wait for the machine to cooldown around 2
hours ( Door must be open )
2. After that, go to back of the machine and
open at the top of the machine
3. This machine have 5 coolpipe and all of
that must do a cleaning process
4. Remove the valve and filter for thecoolpipe
5. Separate the filter in the plastic box to do
a cleaning process
6. Clean the coolpipe and filter using brush
and methanol and make sure the coolpipe is not
clogged after done the cleaning process
7. Remove flux in the tank of the coolpipe and
clean it using methanol and tissue
8. When all is done, the machine can heat up
49
CHAPTER 4
4.1 Conclusion
Industrial Training is program that expose student to the real working environment and
experience. Through Industrial training, I can conclude that industrial training is very important
and it can give many advantage for student whowill graduate their Diploma or Certificate to gain
experience before they get to the real situation in the future where the student being expose to
many kinds of job or work with the time given.
In duration of 20 weeks of industrial training in Amkor Technology Malaysia, I have learn a lot of
things which cannot be learn in Polytechnic. In term oftheory, trainee realized that not all the theory
part is the basic for us to know more knowledge but hands- on experience is important as well. In
real world there have plenty of unforeseen factors can be occurred. As what trainee studied in
Polytechnic,most of the theories are for ideal case, but when come to a real world, it needs to
modify and compensate with certain factors so that the results get are closet to the ideal.
Besides, my communication skills are strengthening as well when communicating with others.
During my training period, I have received criticism and advice from engineers and technician
when mistakes were made. However, those advices are useful guidance for me to change myself
and avoid myself making the same mistakes again. Apart from that, I had also developed my
engineering skills through various activities that I had done. In sum, the activities that I had learned
during industrial training really are useful for me in future to face challenges in a working
environment.
Throughout the industrial training, I found that several things are important and one of them is
relentless punctuality. Be willing to get to the office early, never be in a hurry to leave office early
and complete tasks by their deadlines. When it feels like you have a million things to do, make a
list of everything based on the deadline and how important they are. This will help you break down
your work, andhow much time you should spend on each task.
50
Besides that, as an industrial trainee, asking a good question is very important to gain
knowledge. Think in advance of questions to ask. If you are meeting with a senior colleagues
or supervisor, think of thoughtful questions you canask to demonstrate you’ve prepared for
the meeting and respect her time. Students also need to know not ask too many questions
because that will show you didn’t even try to look for the answer yourself.
Teamwork is one of the important key as well. Trainee got a chance to work as a team with
other people. As what mentioned before, teamwork is very important because it can determine
the successful of given tasks. In real world, it is impossiblefor us to work alone. People might
need others helps in order to complete the tasks. During these 20 weeks, I work with my
Although the challenges faced by each student during the Industrial Training differ from
each other, what is important is that the individual must be morepositive in dealing with each
situation so that the experience gained can be utilized and stimulated in the future.
In conclusion, the industrial training program is very good and can createthe potential
for students to be better in the field they want to work in the present. During the training. It is
clear that the training objectives have been achieved over the last weeks while they are being
implemented. Therefore, it can be concluded that all the disclosures given to the trainees
during this training are very useful and will be useful in the future.
51
4.2 Recommendation
Comments and suggestions are the freedom given to every student to make any
suggestions, opinions and comments on any problems and other matters pertaining to
their industry training. This is because every suggestion and recommendation will be
taken into account and addressed to improve the trainingprogram in the future. Each and
every proposal suggested is a good input for the actions of the parties involved. Each of
the comments and suggestions provided is intended to provide new ideas for mutual
development. It is not at all for the purpose of humiliating anyone involved during industrial
training.
4.2.1 Students
A good preparation must be made by student their self who will undergo industrial
training before they step out from campus. The preparation is not only on the equipment
or stationary but mentally and physically is also very important so that students are ready
to enter the working zone, the changing of environment around them. This is a must for
student so that this situation will not affect student mentally making them easily to give up
Students also need to choose the most preferable company when making decision.
Before industrial training, student need to make some research about the company that
caught their interest. They can’t just choose a certain based on one aspect. Students
52
4.2.2 Polytechnic
There are also a few matters that need to be improved by the Polytechnicand one
Language during lecture in class. The usage of English language is very important when
working in the field that revolved around development because most of the business
deals were carried out using English language. Most of the Polytechnic students are
unskilled in speaking in English. For example, business meetings were usually carried
out by using English language. So, for student that less skilled in that particular language,
the matter of discussions in the meetings willnot be understood by the students. This will
affect the students learning experience.I hope that the management of the Polytechnic
Industri) should hold more visits to the company where trainees who were undergoing the
industrial training as often as 2 or 3 times along the 20 weeks of training to monitor their
development and to ensure that students are always on the watch and monitored at all
time. This is because students tend to procrastinate knowing that there’s no observation
will happen the near future and do their work last minute.
53
4.2.3 Organization
There are also a few matters that need to be improved by the company which is Amkor
Technology and one of the improvement that can be suggested is the company need
understand students more. What does it mean by understand students more is that the
firm should not give the student any work that they do not know without giving any
guidance on how to do the work correctly and leave the students to figure it out by him or
herself. This is because sometimes, the work that had been given was yet to be learned
by the students, so, they need some guidance first before they can start working on the
Besides that, I think the industrial trainees need to have technicians as supervisor. This
is because engineer usually had a tight schedule and also a tons of reports to be done.
They might don’t have time to give proper lesson to trainees. Aside from that, technicians
are more exposed to technical problem directly at the machine. With that, trainees can
learn something new more frequently. If trainees had technician as their supervisor, they’ll
learn more deeply about something that related with their job scope.
54
REFERENCE
Pengajian Tinggi.
Project Guide
Chapter1.Pdf
from https://amkor.com/amkor-overview/
um-Void-Reduction-Reflow.pdf
55