0% found this document useful (0 votes)
62 views39 pages

F 1

New Village
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
62 views39 pages

F 1

New Village
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 39
: FILE Copy ~_ COMMISSION ON AUDIT REGIONAL OFFICE NO. IV-B AUDIT GROUP LGS D - ROMBLON AUDIT TEAM NO, R48-05 PROVINCIAL AUDITING SUB-OFFICE Brgy. Tabin-Dagat, Municipality of Odiongan MUNICIPAL GOVERNMENT OF Looc CHECKLIST OF DOCUMENTS NEEDED FOR TECHNICAL REVIEW AND INSPECTION OF INFRASTRUCTURE PROJECTS (Straight Contract) Contract 1D No, unnumbered Name of Project and Location Rehabiltation of Local Access Road in Sto New Vilage, Bray. Camandag Name of Agency and Address Municipality of Looc, Looc, Rombion Name of Contractor Nolan Construction Source of Funding 20% Development Fund Contract Amount | 999,940.94 Approved Budget for the Contract (ABC) 1,000,000.00 Contract Period 320d Effectivity Date of Contract per NTP August 1, 2022 Expiry Date of Contract per NTP. September 1, 2022 ‘A. ON CONTRACT REVIEW DOCUMENTS NEEDED: ‘Remarks Notice to Proceed indicating the date of receipt by the Contractor Perfected Contract Agreement in standard form under PED ‘Approved PERT/CPM Network Diagram/Precedence Diagram/Bar Charti$-Curve Detailed Computations of Contract Time Winning Contractor's Bid Prices in the Bill of Quantities Winning Contractor's Detailed Quantity and Cost Estimates Abstract of Bids, as Read Abstract of Bids, as Calculated Approved Budget for the Contract (ABC) Program of Work and Detailed Quantity and Cost Estimates Complete Set of Approved Plans and Specifications Tot in standard form under PEDs tee eN eee » pe | VSS) < [ish B. ON INSPECTION DOCUMENTS NEEDED: ‘Approved Statement of Work Accomplished Back-up Computation of Quantities in SWA Statement of Time Elapsed Final Completion inspection Report of the Inspectorate Team Certificate of Completion issued by the Municipal Engineer Approved Variation Order with itemized cost of revision and derivation, if any ‘Approved Suspension and Resume Orders, if any Approved Time Extension, if any Material Test Results Approved As-Staked Plans, if applicable 11. Approved As-Buit Plans (for completed projects only) Prepared by MOHEDA State Auditbr/ViATL. Date : July 28, 2023 COMMISSION ON AUDIT REGIONAL OFFICE NO. IV-B AUDIT GROUP LGS D - ROMBLON AUDIT TEAM NO. R4B-05 PROVINCIAL AUDITING SUB-OFFICE Brgy.Tabin-Dagat, Municipality of Odiongan MUNICIPAL GOVERNMENT OF LOOC CHECKLIST OF DOCUMENTS NEEDED FOR TECHNICAL REVIEW AND INSPECTION OF INFRASTRUCTURE PROJECTS (Straight Contract) Contract ID No, unnumbered Name of Project and Location Rehabilitation of Local Access Road in Sitio New Village, Brgy. Camandag Name of Agency and Address Municipality of Loc, Looc, Romblon Name of Contractor Nolan Constructicn ‘Source of Funding 20% Development Fund Contract Amount 999,940.94 ‘Approved Budget for the Contract (ABC) '®1,000,000.00 Contract Period 320d Effectvity Date of Contract per NTP ‘August 1, 2022 Expiry Date of Contract per NTP September 1, 2022 ‘A. ON CONTRACT REVIEW DOCUMENTS NEEDED: aa Notice to Proceed indicating the date of receipt by the Contractor Perfected Contract Agreement in standard form under PBD ‘Approved PERT/CPM Network Diagram/Precedence Diagram/Bar Chart’S-Curve Detailed Computations of Contract Time Winning Contractor's Bid Prices in the Bill of Quantities Winning Contractor's Detailed Quantity and Cost Estimates. Abstract of Bids, as Read Abstract of Bids, as Calculated ‘Approved Budget for the Contract (ABC) Program of Work and Detailed Quantity and Cost Estimates Complete Set of Approved Plans and Specifications. otin standard form under PBDs v 7 z Z Z ma 7 Z 7 7 Z B. ON INSPECTION DOCUMENTS NEEDED: ‘Submitted Yes | Ne Approved Statement of Work Accomplished < ‘Back-up Computation of Quantities in SWA = Statement of Time Elapsed Final Completion inspection Report of the Inspectorate Team Certificate of Completion issued by the Municipal Engineer ‘Approved Variation Order with itemized cost of revision and derivation, if any Approved Suspension and Resume Orders, if any NA Approved Time Extension, if any NIA. Material Test Results = 10. Approved As-Staked Plans, if applicable 5 11. Approved As-Built Plans (for completed projects only) ¥ 4] NA Prepared by Date 3 July 28, 2023, Republic of the Philippines Province of Romblon MUNICIPALITY OF LOOC ~o0o~ HE MUNICIPAL MAYOR, NOTICE TO PROCEED July 29, 2022 NOLAN G. NGO Nolan Construction Brgy. Poblacion, Looc, Romblon Dear Mr. Ngo: After the execution of the attached Construction Contract for the REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, BRGY. CAMANDAG, LOOG, ROMBLON, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Construction Contract, including the Conditions of Contract, Specifications, and Drawings. Please acknowledge receipt and acceptance of this notice by signing both copies in the space provided below. Keep one copy and return the other to us. Very truly yours, ATTY. LISETT! ARBOLEDS Lacknowledge receipt of this Notice on 2 _ BaGusr ty #08? Name of the Representative of the Bidder: Authorized Signature 5 oe CONSTRUCTION CONTRACT KNOW ALL MEN BY THESE PRESENTS: This CONSTRUCTION CONTRACT is made and executed by and between: LOCAL GOVERNMENT UNIT OF LOOC, ROMBLON, a public corporation, duly organized and existing under the laws of the Philippines, with address at Tirol Street, Poblacion, Looc, Rombion, represented herein by its Municipal Mayor, ATTY. LISETTE M, ARBOLEDA, hereafter referred to as the “ENTITY”; -and- NOLAN CONSTRUCTION, a business entity duly registered with the Department of Trade and Industry, with principal office address located at Poblacion, Looc, Romblon, represented in this act by its owner, NOLAN G. NGO, hereinafter referred to as the “CONTRACTOR”; Hereinafter collectively known as the PARTI Witnesseth that: WHEREAS, the ENTITY has advertised for interested bidders the Rehabilitation of Local Access Road in Sitio New Village, Brgy. Camandag, Looc, Romblon, hereinafter referred to as the “PROJECT”; WHEREAS, the public bidding for the PROJECT was conducted in accordance with applicable laws; WHEREAS, the CONTRACTOR has submitted the single calculated responsive bid for the PROJECT, hence was awarded the same; NOW, THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants and stipulations hereinafter set forth, the PARTIES hereto mutually agree, stipulate and covenant as follows: ARTICLE I ‘THE PROJECT 1.01 The CONTRACTOR shall perform and accomplish the PROJECT strictly in accordance with the related documents as itemized in Article II hereof; 1.02 The CONTRACTOR shall provide everything necessary to the proper accomplishment and completion of the PROJECT according to the true intent and meaning of the drawings, plans, program of works and other contract documents taken together, whether the same may or may not be particularly shown on the drawings or described in the specification; Provided, that the same is reasonably inferred therefrom; 1 page 1.03 1.04 2.01 2.02 3.01 3.02 3.03 3.04 @ & ‘The CONTRACTOR shall make no changes or alterations on the drawings, plans, program of works and other contract documents. The CONTRACTOR covenants to complete the PROJECT within Thirty Two (32) calendar days from date of receipt of the Notice to Proceed. ARTICLE II RELATED DOCUMENTS The related documents which are herein incorporated and made an integral part hereof, shall consist of, but not be limited to the following: General and Special Conditions of the Contract; Drawings/Plans; Specifications; Invitation to Bid; Instructions to Bidders; Bid Data Sheet; Addenda and/or Supplemental/ Bid Bulletins; Bid Forms; Eligibility requirements; Performance Security; Notice of Award of Contract with the Bidder’s conforme thereto; Pree me pose It is mutually understood that the documents are intended to be complimentary with each other and what is called for by any of the documents shall be binding upon the PARTIES as if called for in all, ARTICLE III SCOPE OF WORK & RESPONSIBILITIES OF THE CONTRACTOR ‘The CONTRACTOR shall furnish and provide for its account all the necessary materials, labor, tools, supplies, equipment, plant and other facilities as may be needed in the satisfactory performance and accomplishment of the PROJECT in accordance with and as directed by the CONTRACT, plans, specifications and Program of Works. ‘The CONTRACTOR hereby warrants and guarantees that all the materials to be supplied by them under this CONTRACT are free from defects and shall fully comply in every respect with the specifications and other requirements of the contract plan and other related contract documents. ‘The CONTRACTOR agrees and binds itself to indemnify the ENTITY for whatever injuries or damages suffered by or caused to the ENTITY or third parties for failure, negligence, delays or misconduct on the part of the CONTRACTOR and /or its employees or representatives in the performance of its obligations. The CONTRACTOR shall also comply with all the laws, rules and regulations promulgated by the government of the Republic of the Philippines or any of its branches, subdivisions and instrumentalities applicable to the PROJECT and shall be personally responsible for any violation of the same, and holds the ENTITY, its officers, agents, and employees free and harmless thereof. 2 fnge 3.05 3.06 3.07 3.08 4.01 5.01 6.01 6.02 \ . ‘The CONTRACTOR shall hold the ENTITY, its officers, agent and employees, free and harmless against any claim and losses, damages or inquiries of whatever kind or nature that may be filed or claimed against the ENTITY by any third person, firm or entity arising out of or in connection with, the construction undertaken by the CONTRACTOR under this CONTRACT or due to the neglect of the CONTRACTOR, its agent, servants, and employees. The CONTRACTOR shall, at all times, observe cleanliness and sanitation at the jobsite during the CONTRACT PERIOD. The CONTRACTOR shall keep the premises free from accumulation of waste materials/rubbish. After the completion of construction, but before acceptance of the work and final settlement had been made between the PARTIES, the CONTRACTOR shall remove all surplus materials, apparatus, machinery tools and equipment not part of the work, furnished or supplied by it and shall remove all debris and leave the PROJECT free and clean of all the obstructions and hindrances. All provisions, with respect to the warranties contained herein, are cumulative and not alternative and are in addition to such warranties as may be provided by law or contained in the other provisions of this CONTRACT. ARTICLE IV RIGHTS AND RESPONSIBILITIES OF THE ENTITY Notwithstanding provisions to the contrary, the ENTITY shall exercise reasonable supervision and shall have the right to inspect the PROJECT at any time without notice. This right to inspection shall be “at will” and cannot be restricted by the CONTRACTOR. Errors, defects or other deviations from the plans, specifications and Program of Work, shall be remedied at the sole cost of the CONTRACTOR. ARTICLE V CONTRACTOR'S PERFORMANCE BONDS This CONTRACT shall not be executed without the required Performance Bond. ARTICLE VI CONTRACT PRICE AND MODE OF PAYMENT The ENTITY shall pay the CONTRACTOR, in consideration of the satisfactory completion of the PROJECT within the time for completion and the remedying the defects therein and the assumption of additional obligations and liabilities contained in this CONTRACT, the Contract Price of NINE HUNDRED NINETY- NINE THOUSAND NINE HUNDRED FORTY PESOS & 94/100 (Php 999,940.94) in the manner prescribed in succeeding sections. The ENTITY, in its interest to have the PROJECT started and completed on time as allowed by applicable laws and guidelines, agrees to give the CONTRACTOR a 15% mobilization fund, upon completion of the documentary requirements to effect the release of the same 3 page 6.03 6.04 6.05 7.01 8.01 8.02 So @ The balance shall be paid based on the progress billing as submitted by the CONTRACTOR. Progress payments will be made at the CONTRACTOR'S request based on the percentage of work accomplished during the covered period. However, in accordance with Article VII hereof, TEN (10%) percent of each monthly progress payment shall be retained by the ENTITY. The CONTRACTOR shall submit each billing, based on actual accomplishments to the ENTITY. Payment for works billed shall not be construed as an admission by the ENTITY that the CONTRACTOR has. satisfactorily performed or is. satisfactorily performing the works in accordance with the plans, specifications and general conditions and bid documents, or that the work is free from defects of any kind, hidden or otherwise, or that the CONTRACTOR is not violating or has complied with the provisions, terms and conditions of this CONTRACT or any of the CONTRACTOR’s obligations hereunder. ARTICLE VII RETENTION, Final Payment of the Ten Percent (10%) retention shall be made after the actual turn over and acceptance of the PROJECT and after the issuance of a Guarantee Bond or its equivalent in favor of the ENTITY. The Guarantee Bond, equivalent to Ten Percent (10%) of the Contract Price, shall be obtained by the CONTRACTOR at its own expense in place of the Ten Percent (10%) retention, to guarantee the work done against any defects for a period of one (1) year from date of final acceptance. ‘The CONTRACTOR may opt not to obtain a Guarantee Bond, provided thatitshall only bill the ten Percent (10) % retention after the lapse of one (1) year from date of actual turn over and acceptance of the PROJECT. ARTICLE VI CONTRACTOR'S GUARANTEE OF WORK The CONTRACTOR further agrees to guarantee its work against qualitative defects, poor workmanship, and the like for the period of one (1) year reckoned from the date of final acceptance of the PROJECT, during which time, in cases of said defects, failure and poor workmanship of any part of the PROJECT due to normal use, the CONTRACTOR shall make good such defects and/or failure at no expenses to the ENTITY. If the CONTRACTOR fails to correct or repair the defects within ten (10) days from the receipt of written notice thereof from the ENTITY, the ENTITY may have the work or repairs done by another party at the expense of the CONTRACTOR, or alternatively, deduct the expenses from the retention amount and /or confiscate the guarantee bond referred to in Article 7.01. 9.01 9.02 9.03 9.04 10.01 10.02 10.03 Se . ARTICLE IX CONTRACT TIME, COMPLETION DATE, EXTENSIONS & LIQUIDATED DAMAGES, This CONTRACT shall take effect immediately upon execution of the PARTIES. Works shall be completed in accordance with the agreed work program of Thirty Two (32) Calendar Days; 9.01.01 Project day one (1) shall be the date based on the provisions of Article 1.04, Extension or extensions of time in the completion of the PROJECT shall be authorized or granted by the ENTITY in writing, upon a written request of CONTRACTOR, for any of the following causes or reasons, to wil; 9.02.01 Force Majeure or unforeseen or unforeseeable events and circumstances; and/or 9.02.02 Causes or events, which are beyond the control, and without the fault or negligence of the CONTRACTOR In case the CONTRACTOR encounters any justifiable cause or reasons for delay, the CONTRACTOR shall within ten (10) days after encountering such cause of delay submit to the ENTITY in writing a request for the time extension, Failure by the CONTRACTOR to comply with this requirement will be adequate reason for the ENTITY not to grant the time extension. Should the CONTRACTOR fail to complete the PROJECT within the CONTRACT. PERIOD herein stipulated or within the period of extension granted by the ENTITY, the GENERAL CONTRACTOR agrees-—- 904,01 To pay the ENTITY, the amount equivalent to one tenth of one percent (1/10 of 1%) of the CONTRACT AMOUNT per calendar day of delay until completed, which the ENTITY may deduct from any payments due to the CONTRACTOR. 9.04.02 The liability of the CONTRACTOR to pay damages due to delays shall not relieve it of the obligations to complete and finish the construction. ARTICLE X MISCELLANEOUS Any payment or failure of the ENTITY to enforce its right and privileges under this, CONTRACT shall not be construed as a waiver or renunciation of such rights and privileges. ‘This CONTRACT may be executed in any number of counterparts which shall together constitute one agreement. If any provision contained herein is declared ineffective, void, violable, or unenforceable, or if this CONTRACT would, if a particular provision were not omitted herefrom, be ineffective, void, violable or unenforceable, that provision shall (without in any way affecting the effectiveness, validity, legality and Sige I &- © enforceability of the remainder hereof) be severable herefrom and this CONTRACT. shall be read and construed and take effect for all intents and purposes as if that provision were not contained herein. 10.04. No terms, conditions, or stipulations in this Agreement shall be deemed amended, modified or novated unless the same is made in writing and signed by the Parties hereto in accordance with and subject to any and all applicable and relevant laws. IN WITNESS HEREOF, we have hereunto set our hands in Looc, Romblon, on the date below written. LOCAL GOVERNMENT UNIT OF NOLAN CONSTRUCTION LOOC, ROMBLON By: By: ATTY. LISETTE M. ARBOLEDA NOLAN G. NGO Municipal Mayor Owner Date: July 29, 2022 Date: July 29, 2022 WITNESSES: So . BANCORO II, EnP_—— MA. CARIAITA I. DUROCA MPDC/BAC Clfairma Representati¥e of the Contractor ACKNOWLEDGEMENT Republic of the Philippines) _) Before me, a notary for and in. ____, personally appeared: ATTY. LISETTE M. ARBOLEDA PP No. P8250335A valid until 06 August 2028 NOLAN G. NGO. PRC ID Reg. No. 0024499 valid until 05 December 2022 known to me to be the same person who executed the foregoing Agreement and acknowledged that the same is her free and voluntary deed. This instrument consists of six (6) pages, including the pages where the acknowledgments are written, and is signed by the parties and their instrumental witnesses on each and every page hereof. Witness my hand and seal this AS Doc.No. (4 ; PageNo. _[% 5 BookNo. _| > Series 2022 6 ime WoLAN ACCOMPLISHMENTS STINE G. GUA ip incu T T T T 1 ° 7 “ a 28 32 NUMBER OF DAYS RCOWAY DAYS rea 3 a 3 B= ai €=5 39 CONCRETE PAVEMENT D “B=E 4 ‘DEMOBILIZATION seeshe J LACHICL crus itidcens WUNICIBAL ENGINEER ‘CONSTRUCTION SCHEDULE AND S-CURVE o ACCOMPLISHMENT JriancaL ACCOMPLISHMENT Precred poproved by Weouce ‘SEPTEMBER mere} ets @ oS NOLAN 381C Foren St Poblacion, Lose, Romblon ConsssennTzE Contract 10: 1WRA 2022-06015 ‘ContactName: Rehtitation of Local Access Roan ito New Viloge Location of the Contract Barangay Camando, Loot, RomBon DETAILED COMPUTATION OF CONTRACT TIME DESCRIPTION wr NUMBER OF DAYS Duration (Calendar Days) sep 36.60 24c0 aac ony ned oe 25.00% 2s00% | 25.00% Commuative Percentage 200% | 25.00% 50.00% 7s00% | :00.00% Amount of Scheduled Monty peso of Sched x00%| 2450521 | 2490523 | 24990523 | 200.90523 Commutative Amount a7 Schedule Monthy 100% | 24990523 | 49997047 | 745,550 | 990,040.04 Accompllanment Prepared by: Onmer/ Authdrized MAnaging Officer NOLAN CONSTRUCTION July 14, 2022 NOLAY CD eet olconsuctionS gral om '09633354442/09352264549 Contract 1D: INFRA-2022-06-013 Contract Name: Rehabilitation of Local Access Road In Sitio Nev Village Location of the Contract: Barangay Camandag, Looc, Rombion BILL OF QUANTITIES REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE Barangay Camandag, Looc, Romblon Bill of Quantities IrreM no. DESCRIPTION ‘ry. | unt |unrr cost] AMOUNT (PESOS) 1 JoTHeR GENERAL REQUIREMENTS 2.00 | Lor | 27,993.20 27,893.20 it [FACILITIES FoR THE ENGINEER 1.00 | tor | 22,260.00 22,260.00 ir |BASE PREPARATIONS 240.00) sqm | 1,174.71 281,930.25, w___|coNcReTE PaveMeNT: 43.00 | cum | 13,913.70 667,857.49, [GRAND TOTAL 395,540.94 Prepared by: ‘owner/ Authorized Ménaging Officer NOLAN CONSTRUCTION uly 14, 2022 ¢ ADLAN CY Valeconetecons8 pram oaG2aaseaar/oses2 264648 ‘contract 10: INFRA-2022-06-013 ‘Contract Name: Rehabitation of Local Access Road in Sto Wew Vilage Location of the Contract: Barangay Camandag, Looe, Romblon DETAILED ENGINEERING ESTIMATE FOR REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE ‘Barangay Camandag, Looe, Romblon Ec TT RO yo, oF RENTAL, irTem wo, PRICE COMPONENT RATE/ DAYS AMOUNT E QTY. | payssuner|_uNrT/ cost. x [OTHER GENERAL REQUIREMENTS: Medical Room and First Aide | | Faciities, Construction Survey and| 1.00 Lor Staking _ = (A TABOR, ‘SUB-TOTAL = ‘MATERIALS weimet 70.00. Be 25.00, 2,350.00, working Goves £0.00 aks 100.00 000,00 Safety Snoes 30.007 pais 7,100.00 71,000.00 Meshes! Stuff inside Medical Room, 1.00 ot 5,000.00] 5,000.00 | | ‘SUB-TOTAL 7 79,350.00) [S-EQUIPMENT RENTAL (OPERATED) [Mobitzavon/Demobiizaton z 1 7a435| aa, ‘SUB-TOTAL 7,414.95 [D_ ESTIMATED DIRECT COST (ATB¥C) 26,564.95 [E. INDIRECT COAT/MARK-UP_ ioc = 2. PROFIT otal of Fy. Value Added Tax_5%,of (+E) 3328.25 (G. TOTAL COST (D+ESF) 37,893.20 | in. UNIT COST 27,893.20 TY /FACILITIES FORTHE ENGINEER [Facilities for the Engineer [00] t0r" TABOR |B MATERIALS, I [Traffic Waring Sign od a 7,700.00] 75,300.00 informative Signs 2.00. ps 5,500.09] 31,000,00. ‘SUB-TOTAL 24,200.00) [D- ESTIMATED DIRECT COST (A?B+C) I 124,200.00 [E. INDIRECT COAT/MARK-UP 1. 0cH 2. PROFIT Total of F, Value Added Tax (D+) 7 3,060.00 [G. TOTAL COST (D+E+F) 32,260.00 HUNTT COST 23,360.00 IBASE PREPARATIONS [Spreading and Tampering of | ay 240.00 | SQM [AtABOR DAYS: Foreman, 7 6 00.00 3508.00 | [skies worker z 6 500.00 6,000.00 Laborer 3 6 350.00 6,300.00 [suB-TOTAL is,900.00| B. MATERIALS a ' [agoregates Base Coarse: a am 750.0) $4900.05) /OLAN © a Telincontectons8@ pmacon uly 13, 2022 cacssasazjo9szz64609 ae serra alee “5a;p00.09] = EQUTEMENTS Pavement Breaker/onckiow i 3,580.00 ase Road Greer 2 17,384.00 34,7600 | [Road Roller 5 11,384.00 56,920.00 foump Truck 2 30,816.00 31,632,00 = TOTAL 744,904.00 [b_ ESTIMATED DIRECT COST (Au I 234,804.00 | INDIRECT COAT/MARK- 1. 0cM 33,220.60. 2. PROFIT 23,480.40 “oral of 53,701.00 Iz Value Added Tax_5%_of (OE) 33,435.25 [g. TOTAL cost (O+E+F) 381,930.25 IH. UNIT CosT. ERUZEZS [CONCRETE PAVEMENT R-tABOR BAYS: Foreman i 2 00.00 7,400.00 Skea worker 5. aI 500.0 “47,500.00 [adore io ist 350.0 6,500.00 [SUB-TOTAL 2s 400,00 i. MATERIALS [cement Bags 330.05 asa. [Sond eu. 7,200.00 33,500.00 ELT aSSsE eum 4500.00 72,000.00 6mm dia 6m RSE igs | 63.00 25,850:80_| Forms and Support ot 77,000.00, 47,000.00, Frying Wire gs 120.00 1440.00 CCWN Assorted bor. 7,900.00] 1,900.09, No. 100 Nylon Sing 9 345.0 345.00 32001, Empty Paste Dram pee 7,200.00 7,200.00 20. Empey Fastic Container pes 250.00 500.00 Asphalt Cement Bags 7,200.09 3,500.00 | {UB-TOTAL 340,575.80 [ec EQUIPMENTS: —= runt Bagger Moker aye 7376.00 F060 unt Concrete Vibrator ays 098.00 37,5040 unt Concrete, Cutter aye 1,136.00 3,346.00, 2,868.00 [D_ ESTIMATED DIRECT COST (AvBxC) T [ 08,843.80 INDIRECT COAT/MARK-UP a 40cm 76,326.57 2. PROFIT 50,884.38 Total of 327,210.95. Ie Value Added Tax_5%_of (O7E) 33,802.74 [g: TOTAL cost (O+e+F) UNIT COST. ‘SUMMARY, DIRECT COST Tiaia.78 [oce. 108,547.17 [PROF 72,364.78, [sua-ToTAL 352,324.70 vat 47,646.24 iroTaL 399,940.94 [GRAND TOTAL 240.94, Contract Reference Number: 8771714 Name of the Procuring Entity Name of the Contract: Rehabilitation of Local Access Road in Sitio New Village Location of the Contract: Bray. Camandag, Looe, Romblon Standard Form: SF-INFR-S7 Revised on: August 11, 2004 | ABSTRACT OF BIDS AS READ Contract Name Rehabilitation of Local Access Road in Sitio New Vilage sheet :1 Contract Location Date July 13, 2022 Implementing Office Municipal Engineer Time : 2:00 p.m. Approved Budget for the Contract: One Million Pesos (P 1.000.000.00) NAME OF BIDDERS] BIDDER T BIDDER? T BIDDERS BIDDER Nouanl_wonsniatcrion 4A, 440-44 PIO SEQunw Prewne —— Total Amount of Bid Form of Bid Security Bank/Company Number | __ Validity Period _ __Bid Security Amount Hb MOWe7 VALE - | Required Bid Security BSD | bipoe es _DpXD Sufficient / Insufficient GPF CENT Remarks / \ LANE BIER _ | /\ ah ; R.GADAONI MARL} | M. DACARA sus S. NOCHE cbi.cowon warp nicine soll asi AVILES, a ae sis ber PWLR, INC. ‘MAMMAL foie cosP ‘COA Representative INEZ JR, BAC Mmber Contract Reference Number: 8: Name of the Contract: Rehabilitation of Local Access Road in Sitio New Vi Name of the Procuring Entity Standard Form: SF-INFR-59 Revised on: April 11, 2004 Contract Name : Rehabilitation of Local Access Road in Sitio New Vill Location of the Contract: Brgy. Camandag, Looc, Romblon ABSTRACT OF BIDS AS CALCULATED Sheet : 1. Date : July 15, 2022 Contract Location : Bray. Ci Looe, Romblon mviementing Ose = LGU-Looc, Romblon Time: 2:00 p.m, “7 Approved Budget for the Contract: One Million Pesos (P 1,000,000,000.00) ‘Time and Place of Bid Opening: July 13, 2022 ~ 2:00 p.m. ~ Municipal Session Hall — Looc, Romblon | NAME OF BIDDERS BIDDER 1 BIDDER 2 BIDDER S BIDDER 4 | | NOLAN CONSTRUCTION [Total Amount of Bid lp | 999,940.94 ~ | Form of Bid Security Bid Securing Declaration Bank/Company T Number Validity Period a Bid Security Amount P | No Money Value ~ ~ Required Bid Security P | BSD/Bidder's Bond — () | Susicient / Tasufficient Suflicient [Remarks 7 I - tk os RTINEZ JR, SAB R.GADAONI © MARLYN M. DACARA sustt’s focue BAC Member BAC Member BAC Member ~ PWLR, INC. ‘MAMMAL INHS CREDIT COOP ——COA Representative Page 1 of 2 Name ofthe Procurng Entity Stange Form Number: SFNER-O2 eve lly 28, 2004, the Contract Rehabilitation of Lael Access Roa in Sto New Vilage Location ofthe Contract: Camandag, Looe, Remblon [APPROVED BUDGET FOR THE CONTRACT [REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG, LOOC, ROMBLON Contract duration PREPARED/SUBMITTED BY: * OcM = Overhese, Contingencies nd 2 Mo8./92MO8. = Mobilation and Demat 2 VT Value Aged Tax e ‘APPROVED: ia omy | STATED TARPS IN PERCENT, TOTAL MAREUP 5] rarat womect | TOTAL RIT COST Javawtimy} uN | “rect cosr_[ cw" [ paoriT | moe /oeMOa™| 5 var cost cost a | @ |e [Oifar Ganaral Requrerents PAGE 570 Facies forthe Engineer i 20000 7 32,260.00 | 22,260.00, Base Preparations Bra.s08 00 | i5y ra 370i 37.3262, yai.sw0.25 | ——17a7t [Conerete Pavement 503-646 80 | 154 3% |_—477.21220] 31,803.05 | 359.015 25 667,868.05 | 13. 913.53, - RAND YOTAL | —1,000;000.00" RAwerny Reiy LSETTEW. ARBOTEDA Municipal Mayor o Republic of the Philippines Province of Romblon MUNICIPALITY OF Looe @ -200- QFFICE OF THE MUNICIPAL ENGINEER May 23, 2022 Date Program Of Work MIMAROPA Region DistrictCity Romblon. Implementation Procedure: Contract Name of Project Rehabilitation of Local Access Road in Sitio Descxption/Dimension OW at X 0.20 ‘New Village, Camandag Project Number Location: ‘Camandag, Looe, Romblon width Pavement Width Appropriation 'P7,000,000.00. Bridge Clear width ‘Source of Fund 20% Development Fund Type of Sub-Structuré Limit ‘Type of Superstructure Net Length No. of Spans: Classification: Infrastructure No. of Piers Wo. ofA No. of WK Days to Complete: 20D. Starting Date: UPON THE AVAILABILITY OF FUND, EQUIPMENT %or ‘NUMBER DESCRIPTION OF WORK TO BE DONE Taek, | DESCRIPTION |... NUMBER | BreakerTaackhos = 7 | _ |Medical Room and First Aide Facilties, Construction Survey end 3.45% — |Road Grader: 1 Staking Road Roller 1 1 [Facities of the Engineer 2.75% {Concrete Mixer 1 UL | Spreading and tampering of coarse aggregates 27.84% — |Concrete Vibrator 1 IV [installation of forms, fabrication of shear bar, concreting of roads 65.96% [Concrete Cutter 1 Dump Truck 4 TOTAL 00%. DIRECT COST ROIUSTED rem DESCRIPTION UNIT QUANTITY ToT UNIT ar Goat 1 Jotner General Requirements io 7 28,814.95 28814.95, 27,945.70 1 [Facies for the Engineer Tot 1 21,200.00 221,200.00, 22,260.00 it |8ase Preparations sqm Bad 244/804.00 1395.02 i741 1 [Concrete Pavement cum: 48 508,848.80 10,601.02, 13191383 Estimated Direct Cost 771,487.75, [BREAKDOWN OF ESTIMATED "ANOUNT OF [A Materials, Foel, Os P P EXPENDITURES. TOTAL IB. Equipment, labor. P IC, Total Direct Cost P 1. Labor (Man- Days) P 141,300.00 14.19%|D. Consultancy Fee, 2. Materials P 434,980.80 4350%|E. OCM Mob Profit. P 3. Equipment Renta P 195,186.95 19.52%]F. VAT Pr 4. Fuel, Oi, Maint IF. Construction Cost P7,000,000.00 IS. OCM, Profit Mob. P 180,913.20 18.09%|G. Matls. Quality Control 6. vaT. P 47,619.05 4.76%|l. Overhead. 17. Matis Quality Control J. Retention. ls. Overhead, |2. Contigencies. {0 Retention TOTAL P_1,000,000.00, "Too. 0o%|K Total estimated Cost P__1,000,000-00 PREPARED BY. (CHECKED BY: APPROVED BY: \ JEROME GENFCRIS J. LACHICA Atty. LISETTE M{}RBOLEDA ricipal Engineer Municipal Abr “Page 1 of 3 S So DETAILED ENGINEERING ESTIMATE FOR REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG. ‘CAMANDAG, LOOC, ROMBLON Tem: Quantity: Lump Sum. UNIT cost: —————— 18,800.00 Wo] No of | Rental PRICE COMPONENT ary. |pays/unit| Ratetbays | Amount | Sub-Total TOTAL rit Costs |. OTHER GENERAL REQUIREMENTS DESCRIPTION: MOBILIZATION AND SAFETY HEALTH PROGRAM lquantity: + LoT DURATION: 5 DAYS JA)LABOR IB) MATERIALS HELMET 10 [pcs 22000} 2,200.00 [WORKING GLovEs 10 [pais 400.00) 1,000.00 ISAFETY SHOES 10 [pairs | 1,100.00] 11,000.00 MEDICAL STUFF INSIDE MEDICAL, 1 tor 5000.00] 5,000.00 Room Ic)EQUIPMENT RENTAL (OPERATED) IMOBILIZATIONIDEMOBILIZATION 1 hor 7at495| 7.41495 7.41495 26,614.95 oom PROFIT SUB-TOTAL, 26,614.95 vaT 1,330.75 TOTAL 27,945.70 Il. FACILITIES FOR THE ENGINEER JOESCRIPTION: FACILITIES FOR THE ENGINEER Jauantiry: 1 LoT DURATION: 2 DAYS JA)LABOR JB)MATERIALS HRAFFIC WARNING SIGNS 6 pcs 4,700.00 INFORMATIVE SIGNS 2 [pcs 5,500.00 21,200.00 21,200.00, ocm PROFIT ‘SUB-TOTAL, 21,200.00 vat 1,080.00 TOTAL 22,260.00 Il. BASE PREPARATIONS. IDESCRIPTION: EMBANKMENT, SPREADING OF COARSE AGGREGATES, TAMPERING OF ROADS. Jouanrity.240 sam lOURATION: 6.0, JALABOR IFoREMAN 1 6 600.00] 3,600.00 [SKILLED WORKER, 6 00,00] 6,000.00 LABORER, 3 6 350,00] 6,300.00 age 20f 3 6 @ DETAILED ENGINEERING ESTIMATE FOR REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG. ‘CAMANDAG, LOC, ROMBLON unt cost a bruce COMPONENT ary. oayer Uni] RatsDaye | Amount | sub-total ora. eset ay wareRiats AGGREGATES BASE COARSE 72 foum | 72000] s4000.00 4000.00 Jc) equipments pavement areaKersacenoe | + | 1 | stseqoo| s1se400 fRoA0 GRADER + | 2 | a73ee00] 3476800 Road ROLLER + | 8 | ar3ec00] —sesz000 loump truck + | 2 | tosteco| 2res200 14,908.00 214,804.00 oom 222060 PROFIT 2.at0.40 SUB-TOTAL 268,808.00 vat 1326.25 TOTAL 281,930.25 Iv. coNcRETE PAVEMENT (om x 4M X 020M) loescRiPTiON: instalation offoms, fabrcaton a hear bar, conreting of roads lauanmiry. 48 cum louramion: 19 avs Jaason FOREMAN + | 1 | 60000) +1.40000 | SKILLED WoRKeR s | 1 | s0000| 4780000 | Lagorer to | 1 | 35000) casc000 125,400.00 a) mareriats cement 528 fexcs | 33000) 17424000 sano 28 |cum | 120000] 3360000 lorave as foum | 100.00] 72,000.00 sn 1AM x eM RSE sare. |kcs e300 | 28,850.80 roRMS AND SUPPORT + tor | 7.00000) 7.00000 rine wine 12 kos. 12000] 1,440.00 Jcwm assonren + sox | 1.20000 120000 Io. 100 NYLON STRING 1 ike ‘soco | ‘360.00 200. EMPTY PLASTIC ORUM 6 fecs | 120000) 7.20000 fou ewry ptasniccontawer | 2 pcs 25000 | ‘s00.00 JasPHaLr CEMENT 3 ferss | 120000) 60000 0880.80 Jc) equipments / unir eaccer woxer ae | oavs | 137600] 2201800 ; UNrT CONGRETE VIBRATOR 18 | oavs | toe400] 7.50400 i unit CONCRETE cuTTER 3 | pays | 1.11800) 3348.00 42.808.00 508,848.80 | age 30f3 © So DETAILED ENGINEERING ESTIMATE FOR REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG. ‘CAMANDAG, LOOC, ROMBLON mer UNIT cost: ‘Quantity: Lump Sum. Wa] Noof | Rental PRICE COMPONENT ary. |paysi Unit] Rate/Oays | Amount | Sub-Total TOTAL Unit Coste ‘oc 76,327.32 PROFIT 50,984.88 SUB-TOTAL 636,061.00, vat 31,803.08 TOTAL 667,864.05 “SUMMARY DIRECT COST 771,467.75 ‘ocm 108,547.92 PROFIT 72,365.28 ‘SUB-TOTAL (952,380.95 vaT 47,619.05 ENG'G SUPERVISION Tora 7,000,000.00, GRAND TOTAL 1,000,000.00 PROVINCE OF ROMBLON MUNICIPALITY OF LOOC TECHNICAL DRAWINGS REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG LOCATION: BRGY. CAMANDAG, LOOC, ROMBLON oc ATION MA (Ly TYPICAL, ROADWAY SECTION Sree cS a DETAIL "A" oe ‘CONSTRUCTION/LONGITUDINAL JOINT ON CARRIAGEWAY AND. | SHOULDER + | - ae et cas aoe a = = s as. a elec = t Ww eee | starr. | ov0000 START OF PROJECT: ae et STATION om FINISHED GRADE ELEVATION. |NaTuRAL GRADE |v sevanion FINISHED GRACE | JLo ant qo Lee Jo = Sina aa 2 = Ta ace severe | BEARINGS, ELEVATIONS & GRADES (PT. 0,000-PT.60.0)__ | ae ee 4 “TRANGVERSE CONSTRUCTION JOINT WITHIN THE. — iSO THRO OF SUB Lise soma ransvense consTaucTION JON AT MODLE THD OF NORWAL JOT DETAIL” LONGITUDINAL CONSTRUCTION JOINT D PLANE JOINT OR CONTRACTION JOINT Republic of the Philippines Province of Rombion MUNICIPALITY OF Looe ‘Statement of Work Accomplished ‘As of August 24, 2022 Project REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE CAMANDAG, LOOC, ROMBLON Looe ROMBLON NOLAN CONSTRUCTION. % Contract Physical Accompishmer luo of Aecomplishme mm Description Relative Phoeten Acoumesterrnent neem suas ‘Amount|__we__ [Previous| This Period] To Oate | Previous | This Period | ToDate | Accomp. oti GoneratReairerens 7789020] 279% 100% | _ 100% 2740320] 27,803.20] 270% i) Fecstes or he Engineer 22,260.00 | 2.29% 100% | 100% 22,260.00 | _2226000| 223% ase Preparatons 781,500.25 | 28.19% 100% | 100% 2a1,90025 | 81,9025] 28.19% Conerte Pavement 967,857.49 | 66.79% 100% | 100% 367,857 40| 667,657.49] 66.79% 999,500.96 | 400% 00.00%] —100.00%| 299,540.06] 990.4008) 100.00% Prepared by Reviewed ang (“ered Aepoved NovarcQNsTaUCTION aptractor GENECRIS J. LACHICA nicipal Engineer Atty. LISENYE M. ARBOLEDA cipal Mayor o oe & LEED Republic of the Philippines Province of Romblon Municipality of Looc So Statement of Time Elapsed and Work Accomplished Project Name REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE Location Camandag, Looc, Romblon Contractor NOLAN CONSTRUCTION 1. Original Contract Amount PHP 999,940.98 2. Date Notice to Commence Work July 29, 2022 3 Date Contract effectivity ‘August 1, 2022 4 Original Contract Time 32c0. 5 Date Actually Started ‘August 1, 2022 6 Date Original Expiry September 1,2022 Days Time Ext. : N/A Days Time Ext. N/A ays Time Ext. : NA Days Suspended N/A Days Suspended N/A 7 Change Order No. 2 N/A Amount Change Order No, N/A Amount Change Order No, 2 N/A ‘Amount Supplemental Agreement 2 N/A ‘Amount 8 Suspension Order No. WA Date Suspension Order No. NA Date 9 Total Time Extension / Suspensions N/A ‘Approved to Date 10 Total Calendar Days Extended to Date N/A (Original Contract Time/Extensions/ Supervision) 11 Latest Revised Expiry Date 2 N/A 12 Actual Date Completed ‘August 24, 2022 413. Number of Calendar Days Elapsed 2 4 Number of Days subjected to Liquidated N/A Damages line 13 less line 10) 15 % Time Elapsed 100.0% 16 % Planned Accomplishment of date 75.00% 17% Actual Accomplishment of date 100.0% 18 % Slippage (+/-) 25.00% positive Prepared By: GGENECRIS J. LACHICA Mupicipal Engineer N/A NA N/A N/A N/A N/A o “So Republic of the Philippines Province of Romblon MUNICIPALITY OF LOOC. www. loocromblon.gov.ph OFFICE OF THE MUNICIPAL ENGINEER August 30, 2022 FINAL INSPECTION REPORT PROJECT REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG LOCATION : CAMANDAG, LOOC, ROMBLON CONTRACTOR : NOLAN CONSTRUCTION We the undersigned conducted a joint inspection of the above ~ stated project on the above- mentioned date and found the project to be 100% accomplished as reflected in the attached statement of work accomplishment report signed by the Municipal Engineer in accordance with the plan and specifications of the contract. Mbnicipal Engineer Arel a I GENKCRIS J. LACHICA NOTED: Ny Atty. LISEITTE M. ARBOLEDA Mulicipal Mayor GOVERNMENT OF LOOC-PROVINCE OF ROMBLON: CLEMENTE STREET, BARANGAY POBLACION 5507 @e Se: SA Republic of the Philippines Province of Romblon MUNICIPALITY OF LOOC www.loocromblon.gov.ph OFFICE OF THE MUNICIPAL MAYOR August 30, 2022 CERTIFICATE OF COMPLETION TO WHOM IT MAY CONCERN: This is to certify that NOLAN CONSTRUCTION, with office address at Poblacion, Looc, Romblon, was the Contractor of the Rehabilitation of Local Access Road in Sitio New Village, Camandag ai Camandag, Looc, Romblon. That the construction services rendered by the above-mentioned company started on August 01, 2022 and was completed on August 24, 2022 This certification is issued upon the request of Nolan Construction for whatever legal purpose it may serve Wi Atty. LISENTE M. ARBOLED, Munidipal Mayor Sais LOCAL GOVERNMENT OF LOOC-PROVINCE OF ROMBLON: TIROL STREET, BARANGAY POBLACION 5507 PROVINCE OF ROMBLON | MUNICIPALITY OF LOOC TECHNICAL DRAWINGS AS-BUILT PLAN OF REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG LOCATION: BRGY. CAMANDAG, LOOC, ROMBLON j — TYPICAL ROADWAY SECTION (PT.142.00Mts-182.00Mts.) JON/LONGITUDINAL JOINT ON CARRIAGEWAY AND ER | o+a00.0 | or0300 | PROPOSED PoC? PROPOSED PccP | ‘COORDINATE COORDINATE Lar. izrtes2N LONG. 121°58'33" ELEV. 36.15 SrA. | | starr. tar, 121632"N LONG. 121°58'3 ELEV. 36.01 55 | te 5 | eyoorpnovecr ig cram oraton eta g | seme FE SS : | Be z "% a5 | @ io (LT) STRAIGHT LINE DIAGRAM a eS sexe ——— = j ; } Ea psn [3 | a es we a = ROAD BEARINGS, ELEVATIONS & GRADES (PT. 0,000-PT.182.0) 3 ING TRANSVERSE CONSTRUCTION LGCATION OF WEAKENED PLAN JOT CONSTRUCTION JOINT WATHIN THE) ‘orsuae © _VIDTH AS SHOWNTON PLANS TRANSVERSE CONSTRUCTION ‘MIDOLE TARD OF NORMAL JONT — EXPANSION JOINT @ EVERY $0.H, ANCHOR AT EVERY ADJACENT EXISTING STRUCTURES DeTAIL’A" LONGITUDINAL CONSTRUCTION JOINT

You might also like