~_ COMMISSION ON AUDIT
REGIONAL OFFICE NO. IV-B
AUDIT GROUP LGS D - ROMBLON AUDIT TEAM NO, R48-05
PROVINCIAL AUDITING SUB-OFFICE
Brgy. Tabin-Dagat, Municipality of Odiongan
MUNICIPAL GOVERNMENT OF Looc
CHECKLIST OF DOCUMENTS NEEDED FOR TECHNICAL REVIEW AND INSPECTION
OF INFRASTRUCTURE PROJECTS
(Straight Contract)
Contract 1D No, unnumbered
Name of Project and Location Rehabiltation of Local Access Road in Sto New Vilage, Bray. Camandag
Name of Agency and Address Municipality of Looc, Looc, Rombion
Name of Contractor Nolan Construction
Source of Funding 20% Development Fund
Contract Amount | 999,940.94
Approved Budget for the Contract (ABC) 1,000,000.00
Contract Period 320d
Effectivity Date of Contract per NTP August 1, 2022
Expiry Date of Contract per NTP. September 1, 2022
‘A. ON CONTRACT REVIEW
DOCUMENTS NEEDED:
‘Remarks
Notice to Proceed indicating the date of receipt by the Contractor
Perfected Contract Agreement in standard form under PED
‘Approved PERT/CPM Network Diagram/Precedence Diagram/Bar
Charti$-Curve
Detailed Computations of Contract Time
Winning Contractor's Bid Prices in the Bill of Quantities
Winning Contractor's Detailed Quantity and Cost Estimates
Abstract of Bids, as Read
Abstract of Bids, as Calculated
Approved Budget for the Contract (ABC)
Program of Work and Detailed Quantity and Cost Estimates
Complete Set of Approved Plans and Specifications
Tot in standard form under PEDs
tee eN eee » pe
|
VSS) < [ish
B. ON INSPECTION
DOCUMENTS NEEDED:
‘Approved Statement of Work Accomplished
Back-up Computation of Quantities in SWA
Statement of Time Elapsed
Final Completion inspection Report of the Inspectorate Team
Certificate of Completion issued by the Municipal Engineer
Approved Variation Order with itemized cost of revision and
derivation, if any
‘Approved Suspension and Resume Orders, if any
Approved Time Extension, if any
Material Test Results
Approved As-Staked Plans, if applicable
11. Approved As-Buit Plans (for completed projects only)
Prepared by
MOHEDA
State Auditbr/ViATL.
Date : July 28, 2023COMMISSION ON AUDIT
REGIONAL OFFICE NO. IV-B
AUDIT GROUP LGS D - ROMBLON AUDIT TEAM NO. R4B-05
PROVINCIAL AUDITING SUB-OFFICE
Brgy.Tabin-Dagat, Municipality of Odiongan
MUNICIPAL GOVERNMENT OF LOOC
CHECKLIST OF DOCUMENTS NEEDED FOR TECHNICAL REVIEW AND INSPECTION
OF INFRASTRUCTURE PROJECTS
(Straight Contract)
Contract ID No, unnumbered
Name of Project and Location Rehabilitation of Local Access Road in Sitio New Village, Brgy. Camandag
Name of Agency and Address Municipality of Loc, Looc, Romblon
Name of Contractor Nolan Constructicn
‘Source of Funding 20% Development Fund
Contract Amount 999,940.94
‘Approved Budget for the Contract (ABC) '®1,000,000.00
Contract Period 320d
Effectvity Date of Contract per NTP ‘August 1, 2022
Expiry Date of Contract per NTP September 1, 2022
‘A. ON CONTRACT REVIEW
DOCUMENTS NEEDED: aa
Notice to Proceed indicating the date of receipt by the Contractor
Perfected Contract Agreement in standard form under PBD
‘Approved PERT/CPM Network Diagram/Precedence Diagram/Bar
Chart’S-Curve
Detailed Computations of Contract Time
Winning Contractor's Bid Prices in the Bill of Quantities
Winning Contractor's Detailed Quantity and Cost Estimates.
Abstract of Bids, as Read
Abstract of Bids, as Calculated
‘Approved Budget for the Contract (ABC)
Program of Work and Detailed Quantity and Cost Estimates
Complete Set of Approved Plans and Specifications.
otin standard form under PBDs
v
7
z
Z
Z
ma
7
Z
7
7
Z
B. ON INSPECTION
DOCUMENTS NEEDED: ‘Submitted
Yes | Ne
Approved Statement of Work Accomplished <
‘Back-up Computation of Quantities in SWA =
Statement of Time Elapsed
Final Completion inspection Report of the Inspectorate Team
Certificate of Completion issued by the Municipal Engineer
‘Approved Variation Order with itemized cost of revision and
derivation, if any
Approved Suspension and Resume Orders, if any NA
Approved Time Extension, if any NIA.
Material Test Results =
10. Approved As-Staked Plans, if applicable 5
11. Approved As-Built Plans (for completed projects only) ¥
4]
NA
Prepared by
Date 3 July 28, 2023,Republic of the Philippines
Province of Romblon
MUNICIPALITY OF LOOC
~o0o~
HE MUNICIPAL MAYOR,
NOTICE TO PROCEED
July 29, 2022
NOLAN G. NGO
Nolan Construction
Brgy. Poblacion, Looc, Romblon
Dear Mr. Ngo:
After the execution of the attached Construction Contract for the
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE,
BRGY. CAMANDAG, LOOG, ROMBLON, we hereby instruct you to proceed,
effective upon the date of your receipt of this Notice, with the implementation
of the provisions of the Contract, in accordance with the terms of the
Construction Contract, including the Conditions of Contract, Specifications, and
Drawings.
Please acknowledge receipt and acceptance of this notice by signing both copies
in the space provided below. Keep one copy and return the other to us.
Very truly yours,
ATTY. LISETT! ARBOLEDS
Lacknowledge receipt of this Notice on 2 _ BaGusr ty #08?
Name of the Representative of the Bidder:
Authorized Signature 5 oeCONSTRUCTION CONTRACT
KNOW ALL MEN BY THESE PRESENTS:
This CONSTRUCTION CONTRACT is made and executed by and between:
LOCAL GOVERNMENT UNIT OF LOOC, ROMBLON, a
public corporation, duly organized and existing under the laws of
the Philippines, with address at Tirol Street, Poblacion, Looc,
Rombion, represented herein by its Municipal Mayor, ATTY.
LISETTE M, ARBOLEDA, hereafter referred to as the “ENTITY”;
-and-
NOLAN CONSTRUCTION, a business entity duly registered
with the Department of Trade and Industry, with principal office
address located at Poblacion, Looc, Romblon, represented in this
act by its owner, NOLAN G. NGO, hereinafter referred to as the
“CONTRACTOR”;
Hereinafter collectively known as the PARTI
Witnesseth that:
WHEREAS, the ENTITY has advertised for interested bidders the Rehabilitation
of Local Access Road in Sitio New Village, Brgy. Camandag, Looc, Romblon, hereinafter
referred to as the “PROJECT”;
WHEREAS, the public bidding for the PROJECT was conducted in accordance
with applicable laws;
WHEREAS, the CONTRACTOR has submitted the single calculated responsive
bid for the PROJECT, hence was awarded the same;
NOW, THEREFORE, for and in consideration of the foregoing premises, and the
mutual covenants and stipulations hereinafter set forth, the PARTIES hereto mutually
agree, stipulate and covenant as follows:
ARTICLE I
‘THE PROJECT
1.01 The CONTRACTOR shall perform and accomplish the PROJECT strictly in
accordance with the related documents as itemized in Article II hereof;
1.02 The CONTRACTOR shall provide everything necessary to the proper
accomplishment and completion of the PROJECT according to the true intent and
meaning of the drawings, plans, program of works and other contract documents
taken together, whether the same may or may not be particularly shown on the
drawings or described in the specification; Provided, that the same is reasonably
inferred therefrom;
1 page1.03
1.04
2.01
2.02
3.01
3.02
3.03
3.04
@ &
‘The CONTRACTOR shall make no changes or alterations on the drawings, plans,
program of works and other contract documents.
The CONTRACTOR covenants to complete the PROJECT within Thirty Two (32)
calendar days from date of receipt of the Notice to Proceed.
ARTICLE II
RELATED DOCUMENTS
The related documents which are herein incorporated and made an integral part
hereof, shall consist of, but not be limited to the following:
General and Special Conditions of the Contract;
Drawings/Plans;
Specifications;
Invitation to Bid;
Instructions to Bidders;
Bid Data Sheet;
Addenda and/or Supplemental/ Bid Bulletins;
Bid Forms;
Eligibility requirements;
Performance Security;
Notice of Award of Contract with the Bidder’s conforme thereto;
Pree me pose
It is mutually understood that the documents are intended to be complimentary
with each other and what is called for by any of the documents shall be binding
upon the PARTIES as if called for in all,
ARTICLE III
SCOPE OF WORK & RESPONSIBILITIES OF
THE CONTRACTOR
‘The CONTRACTOR shall furnish and provide for its account all the necessary
materials, labor, tools, supplies, equipment, plant and other facilities as may be
needed in the satisfactory performance and accomplishment of the PROJECT in
accordance with and as directed by the CONTRACT, plans, specifications and
Program of Works.
‘The CONTRACTOR hereby warrants and guarantees that all the materials to be
supplied by them under this CONTRACT are free from defects and shall fully
comply in every respect with the specifications and other requirements of the
contract plan and other related contract documents.
‘The CONTRACTOR agrees and binds itself to indemnify the ENTITY for
whatever injuries or damages suffered by or caused to the ENTITY or third parties
for failure, negligence, delays or misconduct on the part of the CONTRACTOR
and /or its employees or representatives in the performance of its obligations.
The CONTRACTOR shall also comply with all the laws, rules and regulations
promulgated by the government of the Republic of the Philippines or any of its
branches, subdivisions and instrumentalities applicable to the PROJECT and shall
be personally responsible for any violation of the same, and holds the ENTITY, its
officers, agents, and employees free and harmless thereof.
2 fnge3.05
3.06
3.07
3.08
4.01
5.01
6.01
6.02
\ .
‘The CONTRACTOR shall hold the ENTITY, its officers, agent and employees, free
and harmless against any claim and losses, damages or inquiries of whatever kind
or nature that may be filed or claimed against the ENTITY by any third person,
firm or entity arising out of or in connection with, the construction undertaken by
the CONTRACTOR under this CONTRACT or due to the neglect of the
CONTRACTOR, its agent, servants, and employees.
The CONTRACTOR shall, at all times, observe cleanliness and sanitation at the
jobsite during the CONTRACT PERIOD.
The CONTRACTOR shall keep the premises free from accumulation of waste
materials/rubbish. After the completion of construction, but before acceptance of
the work and final settlement had been made between the PARTIES, the
CONTRACTOR shall remove all surplus materials, apparatus, machinery tools
and equipment not part of the work, furnished or supplied by it and shall remove
all debris and leave the PROJECT free and clean of all the obstructions and
hindrances.
All provisions, with respect to the warranties contained herein, are cumulative and
not alternative and are in addition to such warranties as may be provided by law
or contained in the other provisions of this CONTRACT.
ARTICLE IV
RIGHTS AND RESPONSIBILITIES OF THE ENTITY
Notwithstanding provisions to the contrary, the ENTITY shall exercise reasonable
supervision and shall have the right to inspect the PROJECT at any time without
notice. This right to inspection shall be “at will” and cannot be restricted by the
CONTRACTOR.
Errors, defects or other deviations from the plans, specifications and Program of
Work, shall be remedied at the sole cost of the CONTRACTOR.
ARTICLE V
CONTRACTOR'S PERFORMANCE BONDS
This CONTRACT shall not be executed without the required Performance Bond.
ARTICLE VI
CONTRACT PRICE AND MODE OF PAYMENT
The ENTITY shall pay the CONTRACTOR, in consideration of the satisfactory
completion of the PROJECT within the time for completion and the remedying the
defects therein and the assumption of additional obligations and liabilities
contained in this CONTRACT, the Contract Price of NINE HUNDRED NINETY-
NINE THOUSAND NINE HUNDRED FORTY PESOS & 94/100 (Php 999,940.94)
in the manner prescribed in succeeding sections.
The ENTITY, in its interest to have the PROJECT started and completed on time as
allowed by applicable laws and guidelines, agrees to give the CONTRACTOR a
15% mobilization fund, upon completion of the documentary requirements to effect
the release of the same
3 page6.03
6.04
6.05
7.01
8.01
8.02
So @
The balance shall be paid based on the progress billing as submitted by the
CONTRACTOR. Progress payments will be made at the CONTRACTOR'S
request based on the percentage of work accomplished during the covered period.
However, in accordance with Article VII hereof, TEN (10%) percent of each
monthly progress payment shall be retained by the ENTITY.
The CONTRACTOR shall submit each billing, based on actual accomplishments
to the ENTITY.
Payment for works billed shall not be construed as an admission by the ENTITY
that the CONTRACTOR has. satisfactorily performed or is. satisfactorily
performing the works in accordance with the plans, specifications and general
conditions and bid documents, or that the work is free from defects of any kind,
hidden or otherwise, or that the CONTRACTOR is not violating or has complied
with the provisions, terms and conditions of this CONTRACT or any of the
CONTRACTOR’s obligations hereunder.
ARTICLE VII
RETENTION,
Final Payment of the Ten Percent (10%) retention shall be made after the actual turn
over and acceptance of the PROJECT and after the issuance of a Guarantee Bond
or its equivalent in favor of the ENTITY. The Guarantee Bond, equivalent to Ten
Percent (10%) of the Contract Price, shall be obtained by the CONTRACTOR at its
own expense in place of the Ten Percent (10%) retention, to guarantee the work
done against any defects for a period of one (1) year from date of final acceptance.
‘The CONTRACTOR may opt not to obtain a Guarantee Bond, provided thatitshall
only bill the ten Percent (10) % retention after the lapse of one (1) year from date of
actual turn over and acceptance of the PROJECT.
ARTICLE VI
CONTRACTOR'S GUARANTEE OF WORK
The CONTRACTOR further agrees to guarantee its work against qualitative
defects, poor workmanship, and the like for the period of one (1) year reckoned
from the date of final acceptance of the PROJECT, during which time, in cases of
said defects, failure and poor workmanship of any part of the PROJECT due to
normal use, the CONTRACTOR shall make good such defects and/or failure at no
expenses to the ENTITY.
If the CONTRACTOR fails to correct or repair the defects within ten (10) days from
the receipt of written notice thereof from the ENTITY, the ENTITY may have the
work or repairs done by another party at the expense of the CONTRACTOR, or
alternatively, deduct the expenses from the retention amount and /or confiscate the
guarantee bond referred to in Article 7.01.9.01
9.02
9.03
9.04
10.01
10.02
10.03
Se .
ARTICLE IX
CONTRACT TIME, COMPLETION DATE,
EXTENSIONS & LIQUIDATED DAMAGES,
This CONTRACT shall take effect immediately upon execution of the PARTIES.
Works shall be completed in accordance with the agreed work program of Thirty
Two (32) Calendar Days;
9.01.01 Project day one (1) shall be the date based on the provisions of Article
1.04,
Extension or extensions of time in the completion of the PROJECT shall be
authorized or granted by the ENTITY in writing, upon a written request of
CONTRACTOR, for any of the following causes or reasons, to wil;
9.02.01 Force Majeure or unforeseen or unforeseeable events and circumstances;
and/or
9.02.02 Causes or events, which are beyond the control, and without the fault or
negligence of the CONTRACTOR
In case the CONTRACTOR encounters any justifiable cause or reasons for delay,
the CONTRACTOR shall within ten (10) days after encountering such cause of
delay submit to the ENTITY in writing a request for the time extension, Failure by
the CONTRACTOR to comply with this requirement will be adequate reason for
the ENTITY not to grant the time extension.
Should the CONTRACTOR fail to complete the PROJECT within the CONTRACT.
PERIOD herein stipulated or within the period of extension granted by the
ENTITY, the GENERAL CONTRACTOR agrees-—-
904,01 To pay the ENTITY, the amount equivalent to one tenth of one percent
(1/10 of 1%) of the CONTRACT AMOUNT per calendar day of delay until
completed, which the ENTITY may deduct from any payments due to the
CONTRACTOR.
9.04.02 The liability of the CONTRACTOR to pay damages due to delays shall
not relieve it of the obligations to complete and finish the construction.
ARTICLE X
MISCELLANEOUS
Any payment or failure of the ENTITY to enforce its right and privileges under this,
CONTRACT shall not be construed as a waiver or renunciation of such rights and
privileges.
‘This CONTRACT may be executed in any number of counterparts which shall
together constitute one agreement.
If any provision contained herein is declared ineffective, void, violable, or
unenforceable, or if this CONTRACT would, if a particular provision were not
omitted herefrom, be ineffective, void, violable or unenforceable, that provision
shall (without in any way affecting the effectiveness, validity, legality and
Sige
I&- ©
enforceability of the remainder hereof) be severable herefrom and this CONTRACT.
shall be read and construed and take effect for all intents and purposes as if that
provision were not contained herein.
10.04. No terms, conditions, or stipulations in this Agreement shall be deemed amended,
modified or novated unless the same is made in writing and signed by the Parties
hereto in accordance with and subject to any and all applicable and relevant laws.
IN WITNESS HEREOF, we have hereunto set our hands in Looc, Romblon, on the
date below written.
LOCAL GOVERNMENT UNIT OF NOLAN CONSTRUCTION
LOOC, ROMBLON
By: By:
ATTY. LISETTE M. ARBOLEDA NOLAN G. NGO
Municipal Mayor Owner
Date: July 29, 2022 Date: July 29, 2022
WITNESSES:
So
. BANCORO II, EnP_—— MA. CARIAITA I. DUROCA
MPDC/BAC Clfairma Representati¥e of the Contractor
ACKNOWLEDGEMENT
Republic of the Philippines)
_)
Before me, a notary for and in. ____, personally appeared:
ATTY. LISETTE M. ARBOLEDA PP No. P8250335A valid until 06 August 2028
NOLAN G. NGO. PRC ID Reg. No. 0024499 valid until 05 December 2022
known to me to be the same person who executed the foregoing Agreement and
acknowledged that the same is her free and voluntary deed.
This instrument consists of six (6) pages, including the pages where the
acknowledgments are written, and is signed by the parties and their instrumental
witnesses on each and every page hereof.
Witness my hand and seal this AS
Doc.No. (4 ;
PageNo. _[% 5
BookNo. _| >
Series 2022
6 imeWoLAN
ACCOMPLISHMENTS
STINE G. GUA
ip incu
T T T T 1
° 7 “ a 28 32
NUMBER OF DAYS
RCOWAY DAYS
rea 3
a 3
B= ai
€=5 39 CONCRETE PAVEMENT
D “B=E 4 ‘DEMOBILIZATION
seeshe J LACHICL crus itidcens
WUNICIBAL ENGINEER‘CONSTRUCTION SCHEDULE AND S-CURVE
o ACCOMPLISHMENT
JriancaL ACCOMPLISHMENT
Precred
poproved byWeouce
‘SEPTEMBER
mere} ets@ oS
NOLAN
381C Foren St Poblacion, Lose, Romblon
ConsssennTzE
Contract 10: 1WRA 2022-06015
‘ContactName: Rehtitation of Local Access Roan ito New Viloge
Location of the Contract Barangay Camando, Loot, RomBon
DETAILED COMPUTATION OF CONTRACT TIME
DESCRIPTION wr NUMBER OF DAYS
Duration (Calendar Days) sep 36.60 24c0 aac
ony ned oe 25.00% 2s00% | 25.00%
Commuative Percentage
200% | 25.00% 50.00% 7s00% | :00.00%
Amount of Scheduled Monty
peso of Sched x00%| 2450521 | 2490523 | 24990523 | 200.90523
Commutative Amount a7
Schedule Monthy 100% | 24990523 | 49997047 | 745,550 | 990,040.04
Accompllanment
Prepared by:
Onmer/ Authdrized MAnaging Officer
NOLAN CONSTRUCTION
July 14, 2022NOLAY CD eet
olconsuctionS gral om
'09633354442/09352264549
Contract 1D: INFRA-2022-06-013
Contract Name: Rehabilitation of Local Access Road In Sitio Nev Village
Location of the Contract: Barangay Camandag, Looc, Rombion
BILL OF QUANTITIES
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE
Barangay Camandag, Looc, Romblon
Bill of Quantities
IrreM no. DESCRIPTION ‘ry. | unt |unrr cost] AMOUNT (PESOS)
1 JoTHeR GENERAL REQUIREMENTS 2.00 | Lor | 27,993.20 27,893.20
it [FACILITIES FoR THE ENGINEER 1.00 | tor | 22,260.00 22,260.00
ir |BASE PREPARATIONS 240.00) sqm | 1,174.71 281,930.25,
w___|coNcReTE PaveMeNT: 43.00 | cum | 13,913.70 667,857.49,
[GRAND TOTAL 395,540.94
Prepared by:
‘owner/ Authorized Ménaging Officer
NOLAN CONSTRUCTION
uly 14, 2022¢
ADLAN CY
Valeconetecons8 pram
oaG2aaseaar/oses2 264648
‘contract 10: INFRA-2022-06-013
‘Contract Name: Rehabitation of Local Access Road in Sto Wew Vilage
Location of the Contract: Barangay Camandag, Looe, Romblon
DETAILED ENGINEERING ESTIMATE FOR
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE
‘Barangay Camandag, Looe, Romblon
Ec TT RO yo, oF RENTAL,
irTem wo, PRICE COMPONENT RATE/ DAYS AMOUNT
E QTY. | payssuner|_uNrT/ cost.
x [OTHER GENERAL REQUIREMENTS:
Medical Room and First Aide |
| Faciities, Construction Survey and| 1.00 Lor
Staking _ =
(A TABOR,
‘SUB-TOTAL =
‘MATERIALS
weimet 70.00. Be 25.00, 2,350.00,
working Goves £0.00 aks 100.00 000,00
Safety Snoes 30.007 pais 7,100.00 71,000.00
Meshes! Stuff inside Medical Room, 1.00 ot 5,000.00] 5,000.00 |
| ‘SUB-TOTAL 7 79,350.00)
[S-EQUIPMENT RENTAL
(OPERATED)
[Mobitzavon/Demobiizaton z 1 7a435| aa,
‘SUB-TOTAL 7,414.95
[D_ ESTIMATED DIRECT COST (ATB¥C) 26,564.95
[E. INDIRECT COAT/MARK-UP_
ioc =
2. PROFIT
otal of
Fy. Value Added Tax_5%,of (+E) 3328.25
(G. TOTAL COST (D+ESF) 37,893.20 |
in. UNIT COST 27,893.20
TY /FACILITIES FORTHE ENGINEER
[Facilities for the Engineer [00] t0r"
TABOR
|B MATERIALS, I
[Traffic Waring Sign od a 7,700.00] 75,300.00
informative Signs 2.00. ps 5,500.09] 31,000,00.
‘SUB-TOTAL 24,200.00)
[D- ESTIMATED DIRECT COST (A?B+C) I 124,200.00
[E. INDIRECT COAT/MARK-UP
1. 0cH
2. PROFIT
Total of
F, Value Added Tax (D+) 7 3,060.00
[G. TOTAL COST (D+E+F) 32,260.00
HUNTT COST 23,360.00
IBASE PREPARATIONS
[Spreading and Tampering of
| ay 240.00 | SQM
[AtABOR DAYS:
Foreman, 7 6 00.00 3508.00
| [skies worker z 6 500.00 6,000.00
Laborer 3 6 350.00 6,300.00
[suB-TOTAL is,900.00|
B. MATERIALS a
' [agoregates Base Coarse: a am 750.0) $4900.05)/OLAN ©
a
Telincontectons8@ pmacon
uly 13, 2022
cacssasazjo9szz64609
ae serra alee “5a;p00.09]
= EQUTEMENTS
Pavement Breaker/onckiow i 3,580.00 ase
Road Greer 2 17,384.00 34,7600 |
[Road Roller 5 11,384.00 56,920.00
foump Truck 2 30,816.00 31,632,00
= TOTAL 744,904.00
[b_ ESTIMATED DIRECT COST (Au I 234,804.00 |
INDIRECT COAT/MARK-
1. 0cM 33,220.60.
2. PROFIT 23,480.40
“oral of 53,701.00
Iz Value Added Tax_5%_of (OE) 33,435.25
[g. TOTAL cost (O+E+F) 381,930.25
IH. UNIT CosT. ERUZEZS
[CONCRETE PAVEMENT
R-tABOR BAYS:
Foreman i 2 00.00 7,400.00
Skea worker 5. aI 500.0 “47,500.00
[adore io ist 350.0 6,500.00
[SUB-TOTAL 2s 400,00
i. MATERIALS
[cement Bags 330.05 asa.
[Sond eu. 7,200.00 33,500.00
ELT aSSsE eum 4500.00 72,000.00
6mm dia 6m RSE igs | 63.00 25,850:80_|
Forms and Support ot 77,000.00, 47,000.00,
Frying Wire gs 120.00 1440.00
CCWN Assorted bor. 7,900.00] 1,900.09,
No. 100 Nylon Sing 9 345.0 345.00
32001, Empty Paste Dram pee 7,200.00 7,200.00
20. Empey Fastic Container pes 250.00 500.00
Asphalt Cement Bags 7,200.09 3,500.00 |
{UB-TOTAL 340,575.80
[ec EQUIPMENTS: —=
runt Bagger Moker aye 7376.00 F060
unt Concrete Vibrator ays 098.00 37,5040
unt Concrete, Cutter aye 1,136.00 3,346.00,
2,868.00
[D_ ESTIMATED DIRECT COST (AvBxC) T [ 08,843.80
INDIRECT COAT/MARK-UP a
40cm 76,326.57
2. PROFIT 50,884.38
Total of 327,210.95.
Ie Value Added Tax_5%_of (O7E) 33,802.74
[g: TOTAL cost (O+e+F)
UNIT COST.
‘SUMMARY,
DIRECT COST Tiaia.78
[oce. 108,547.17
[PROF 72,364.78,
[sua-ToTAL 352,324.70
vat 47,646.24
iroTaL 399,940.94
[GRAND TOTAL 240.94,Contract Reference Number: 8771714
Name of the Procuring Entity Name of the Contract: Rehabilitation of Local Access Road in Sitio New Village
Location of the Contract: Bray. Camandag, Looe, Romblon
Standard Form: SF-INFR-S7
Revised on: August 11, 2004 |
ABSTRACT OF BIDS AS READ
Contract Name Rehabilitation of Local Access Road in Sitio New Vilage sheet :1
Contract Location Date July 13, 2022
Implementing Office Municipal Engineer Time : 2:00 p.m.
Approved Budget for the Contract: One Million Pesos (P 1.000.000.00)
NAME OF BIDDERS] BIDDER T BIDDER? T BIDDERS BIDDER
Nouanl_wonsniatcrion
4A, 440-44
PIO SEQunw Prewne ——
Total Amount of Bid
Form of Bid Security
Bank/Company
Number |
__ Validity Period _
__Bid Security Amount Hb MOWe7 VALE - |
Required Bid Security BSD | bipoe es _DpXD
Sufficient / Insufficient GPF CENT
Remarks / \ LANE BIER _ |
/\
ah ;
R.GADAONI MARL} | M. DACARA sus S. NOCHE
cbi.cowon warp nicine soll asi
AVILES, a ae sis
ber PWLR, INC. ‘MAMMAL foie cosP ‘COA Representative
INEZ JR,
BAC MmberContract Reference Number: 8:
Name of the Contract: Rehabilitation of Local Access Road in Sitio New Vi
Name of the Procuring Entity
Standard Form: SF-INFR-59
Revised on: April 11, 2004
Contract Name
: Rehabilitation of Local Access Road in Sitio New Vill
Location of the Contract: Brgy. Camandag, Looc, Romblon
ABSTRACT OF BIDS AS CALCULATED
Sheet : 1.
Date
: July 15, 2022
Contract Location : Bray. Ci Looe, Romblon
mviementing Ose = LGU-Looc, Romblon Time: 2:00 p.m,
“7 Approved Budget for the Contract: One Million Pesos (P 1,000,000,000.00)
‘Time and Place of Bid Opening: July 13, 2022 ~ 2:00 p.m. ~ Municipal Session Hall — Looc, Romblon
| NAME OF BIDDERS BIDDER 1 BIDDER 2 BIDDER S BIDDER 4
|
| NOLAN CONSTRUCTION
[Total Amount of Bid lp | 999,940.94 ~
| Form of Bid Security Bid Securing Declaration
Bank/Company T
Number
Validity Period a
Bid Security Amount P | No Money Value ~ ~
Required Bid Security P | BSD/Bidder's Bond —
() | Susicient / Tasufficient Suflicient
[Remarks 7 I
- tk os
RTINEZ JR, SAB R.GADAONI © MARLYN M. DACARA sustt’s focue
BAC Member BAC Member BAC Member
~ PWLR, INC. ‘MAMMAL INHS CREDIT COOP ——COA RepresentativePage 1 of 2
Name ofthe Procurng Entity
Stange Form Number: SFNER-O2
eve lly 28, 2004,
the Contract Rehabilitation of Lael Access Roa in Sto New Vilage
Location ofthe Contract: Camandag, Looe, Remblon
[APPROVED BUDGET FOR THE CONTRACT
[REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG, LOOC, ROMBLON
Contract duration
PREPARED/SUBMITTED BY:
* OcM = Overhese, Contingencies nd
2 Mo8./92MO8. = Mobilation and Demat
2 VT Value Aged Tax
e
‘APPROVED:
ia omy | STATED TARPS IN PERCENT, TOTAL MAREUP 5] rarat womect | TOTAL RIT COST
Javawtimy} uN | “rect cosr_[ cw" [ paoriT | moe /oeMOa™| 5 var cost cost
a | @ |e
[Oifar Ganaral Requrerents PAGE 570
Facies forthe Engineer i 20000 7 32,260.00 | 22,260.00,
Base Preparations Bra.s08 00 | i5y ra 370i 37.3262, yai.sw0.25 | ——17a7t
[Conerete Pavement 503-646 80 | 154 3% |_—477.21220] 31,803.05 | 359.015 25 667,868.05 | 13. 913.53,
- RAND YOTAL | —1,000;000.00"
RAwerny
Reiy LSETTEW. ARBOTEDA
Municipal Mayoro
Republic of the Philippines
Province of Romblon
MUNICIPALITY OF Looe
@
-200-
QFFICE OF THE MUNICIPAL ENGINEER
May 23, 2022
Date
Program Of Work
MIMAROPA Region
DistrictCity Romblon. Implementation Procedure: Contract
Name of Project Rehabilitation of Local Access Road in Sitio Descxption/Dimension OW at X 0.20
‘New Village, Camandag
Project Number
Location: ‘Camandag, Looe, Romblon width Pavement Width
Appropriation 'P7,000,000.00. Bridge Clear width
‘Source of Fund 20% Development Fund Type of Sub-Structuré
Limit ‘Type of Superstructure
Net Length No. of Spans:
Classification: Infrastructure No. of Piers Wo. ofA
No. of WK Days to Complete: 20D. Starting Date: UPON THE AVAILABILITY OF FUND,
EQUIPMENT
%or ‘NUMBER
DESCRIPTION OF WORK TO BE DONE Taek, | DESCRIPTION |... NUMBER |
BreakerTaackhos = 7
| _ |Medical Room and First Aide Facilties, Construction Survey end 3.45% — |Road Grader: 1
Staking Road Roller 1
1 [Facities of the Engineer 2.75% {Concrete Mixer 1
UL | Spreading and tampering of coarse aggregates 27.84% — |Concrete Vibrator 1
IV [installation of forms, fabrication of shear bar, concreting of roads 65.96% [Concrete Cutter 1
Dump Truck 4
TOTAL 00%.
DIRECT COST ROIUSTED
rem DESCRIPTION UNIT QUANTITY ToT UNIT ar Goat
1 Jotner General Requirements io 7 28,814.95 28814.95, 27,945.70
1 [Facies for the Engineer Tot 1 21,200.00 221,200.00, 22,260.00
it |8ase Preparations sqm Bad 244/804.00 1395.02 i741
1 [Concrete Pavement cum: 48 508,848.80 10,601.02, 13191383
Estimated Direct Cost 771,487.75,
[BREAKDOWN OF ESTIMATED "ANOUNT OF [A Materials, Foel, Os P P
EXPENDITURES. TOTAL IB. Equipment, labor. P
IC, Total Direct Cost P
1. Labor (Man- Days) P 141,300.00 14.19%|D. Consultancy Fee,
2. Materials P 434,980.80 4350%|E. OCM Mob Profit. P
3. Equipment Renta P 195,186.95 19.52%]F. VAT Pr
4. Fuel, Oi, Maint IF. Construction Cost P7,000,000.00
IS. OCM, Profit Mob. P 180,913.20 18.09%|G. Matls. Quality Control
6. vaT. P 47,619.05 4.76%|l. Overhead.
17. Matis Quality Control J. Retention.
ls. Overhead,
|2. Contigencies.
{0 Retention
TOTAL P_1,000,000.00, "Too. 0o%|K Total estimated Cost P__1,000,000-00
PREPARED BY. (CHECKED BY: APPROVED BY: \
JEROME GENFCRIS J. LACHICA Atty. LISETTE M{}RBOLEDA
ricipal Engineer Municipal Abr“Page 1 of 3 S
So
DETAILED ENGINEERING ESTIMATE FOR
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG.
‘CAMANDAG, LOOC, ROMBLON
Tem:
Quantity: Lump Sum.
UNIT cost:
——————
18,800.00
Wo] No of | Rental
PRICE COMPONENT ary. |pays/unit| Ratetbays | Amount | Sub-Total TOTAL
rit Costs
|. OTHER GENERAL REQUIREMENTS
DESCRIPTION: MOBILIZATION AND SAFETY HEALTH PROGRAM
lquantity: + LoT
DURATION: 5 DAYS
JA)LABOR
IB) MATERIALS
HELMET 10 [pcs 22000} 2,200.00
[WORKING GLovEs 10 [pais 400.00) 1,000.00
ISAFETY SHOES 10 [pairs | 1,100.00] 11,000.00
MEDICAL STUFF INSIDE MEDICAL, 1 tor 5000.00] 5,000.00
Room
Ic)EQUIPMENT RENTAL (OPERATED)
IMOBILIZATIONIDEMOBILIZATION 1 hor 7at495| 7.41495
7.41495
26,614.95
oom
PROFIT
SUB-TOTAL, 26,614.95
vaT 1,330.75
TOTAL 27,945.70
Il. FACILITIES FOR THE ENGINEER
JOESCRIPTION: FACILITIES FOR THE ENGINEER
Jauantiry: 1 LoT
DURATION: 2 DAYS
JA)LABOR
JB)MATERIALS
HRAFFIC WARNING SIGNS 6 pcs 4,700.00
INFORMATIVE SIGNS 2 [pcs 5,500.00
21,200.00
21,200.00,
ocm
PROFIT
‘SUB-TOTAL, 21,200.00
vat 1,080.00
TOTAL 22,260.00
Il. BASE PREPARATIONS.
IDESCRIPTION: EMBANKMENT, SPREADING OF COARSE AGGREGATES, TAMPERING OF ROADS.
Jouanrity.240 sam
lOURATION: 6.0,
JALABOR
IFoREMAN 1 6 600.00] 3,600.00
[SKILLED WORKER, 6 00,00] 6,000.00
LABORER, 3 6 350,00] 6,300.00age 20f 3 6 @
DETAILED ENGINEERING ESTIMATE FOR
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG.
‘CAMANDAG, LOC, ROMBLON
unt cost
a
bruce COMPONENT ary. oayer Uni] RatsDaye | Amount | sub-total ora.
eset
ay wareRiats
AGGREGATES BASE COARSE 72 foum | 72000] s4000.00
4000.00
Jc) equipments
pavement areaKersacenoe | + | 1 | stseqoo| s1se400
fRoA0 GRADER + | 2 | a73ee00] 3476800
Road ROLLER + | 8 | ar3ec00] —sesz000
loump truck + | 2 | tosteco| 2res200
14,908.00
214,804.00
oom 222060
PROFIT 2.at0.40
SUB-TOTAL 268,808.00
vat 1326.25
TOTAL 281,930.25
Iv. coNcRETE PAVEMENT (om x 4M X 020M)
loescRiPTiON: instalation offoms, fabrcaton a hear bar, conreting of roads
lauanmiry. 48 cum
louramion: 19 avs
Jaason
FOREMAN + | 1 | 60000) +1.40000 |
SKILLED WoRKeR s | 1 | s0000| 4780000 |
Lagorer to | 1 | 35000) casc000
125,400.00
a) mareriats
cement 528 fexcs | 33000) 17424000
sano 28 |cum | 120000] 3360000
lorave as foum | 100.00] 72,000.00
sn 1AM x eM RSE sare. |kcs e300 | 28,850.80
roRMS AND SUPPORT + tor | 7.00000) 7.00000
rine wine 12 kos. 12000] 1,440.00
Jcwm assonren + sox | 1.20000 120000
Io. 100 NYLON STRING 1 ike ‘soco | ‘360.00
200. EMPTY PLASTIC ORUM 6 fecs | 120000) 7.20000
fou ewry ptasniccontawer | 2 pcs 25000 | ‘s00.00
JasPHaLr CEMENT 3 ferss | 120000) 60000
0880.80
Jc) equipments
/ unir eaccer woxer ae | oavs | 137600] 2201800
; UNrT CONGRETE VIBRATOR 18 | oavs | toe400] 7.50400
i unit CONCRETE cuTTER 3 | pays | 1.11800) 3348.00
42.808.00
508,848.80| age 30f3
©
So
DETAILED ENGINEERING ESTIMATE FOR
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE, CAMANDAG.
‘CAMANDAG, LOOC, ROMBLON
mer UNIT cost:
‘Quantity: Lump Sum.
Wa] Noof | Rental
PRICE COMPONENT ary. |paysi Unit] Rate/Oays | Amount | Sub-Total TOTAL
Unit Coste
‘oc 76,327.32
PROFIT 50,984.88
SUB-TOTAL 636,061.00,
vat 31,803.08
TOTAL 667,864.05
“SUMMARY
DIRECT COST 771,467.75
‘ocm 108,547.92
PROFIT 72,365.28
‘SUB-TOTAL (952,380.95
vaT 47,619.05
ENG'G SUPERVISION
Tora 7,000,000.00,
GRAND TOTAL 1,000,000.00PROVINCE OF ROMBLON
MUNICIPALITY OF LOOC
TECHNICAL DRAWINGS
REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW
VILLAGE, CAMANDAG
LOCATION: BRGY. CAMANDAG, LOOC, ROMBLONoc
ATION MA(Ly TYPICAL, ROADWAY SECTION
Sree cS
a
DETAIL "A" oe
‘CONSTRUCTION/LONGITUDINAL JOINT ON CARRIAGEWAY AND. |
SHOULDER + |
- ae et cas aoe a
= = s
as. a elec =
tWw eee
| starr.
| ov0000
START OF PROJECT:
ae
etSTATION om
FINISHED GRADE
ELEVATION.
|NaTuRAL GRADE
|v sevanion
FINISHED GRACE |
JLo ant
qo Lee
Jo = Sina aa
2 = Ta ace
severe |
BEARINGS, ELEVATIONS & GRADES (PT. 0,000-PT.60.0)__ |
ae ee 4“TRANGVERSE CONSTRUCTION JOINT WITHIN THE.
— iSO THRO OF SUB
Lise soma ransvense consTaucTION
JON AT MODLE THD OF NORWAL JOT
DETAIL”
LONGITUDINAL CONSTRUCTION JOINT D PLANE JOINT OR CONTRACTION JOINTRepublic of the Philippines
Province of Rombion
MUNICIPALITY OF Looe
‘Statement of Work Accomplished
‘As of August 24, 2022
Project REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE
CAMANDAG, LOOC, ROMBLON
Looe
ROMBLON
NOLAN CONSTRUCTION.
%
Contract Physical Accompishmer luo of Aecomplishme mm
Description Relative Phoeten Acoumesterrnent neem suas
‘Amount|__we__ [Previous| This Period] To Oate | Previous | This Period | ToDate | Accomp.
oti GoneratReairerens 7789020] 279% 100% | _ 100% 2740320] 27,803.20] 270% i)
Fecstes or he Engineer 22,260.00 | 2.29% 100% | 100% 22,260.00 | _2226000| 223%
ase Preparatons 781,500.25 | 28.19% 100% | 100% 2a1,90025 | 81,9025] 28.19%
Conerte Pavement 967,857.49 | 66.79% 100% | 100% 367,857 40| 667,657.49] 66.79%
999,500.96 | 400% 00.00%] —100.00%| 299,540.06] 990.4008) 100.00%
Prepared by Reviewed ang (“ered Aepoved
NovarcQNsTaUCTION
aptractor
GENECRIS J. LACHICA
nicipal Engineer
Atty. LISENYE M. ARBOLEDA
cipal Mayor
ooe &
LEED Republic of the Philippines
Province of Romblon
Municipality of Looc
So
Statement of Time Elapsed and Work Accomplished
Project Name REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW VILLAGE
Location Camandag, Looc, Romblon
Contractor NOLAN CONSTRUCTION
1. Original Contract Amount PHP 999,940.98
2. Date Notice to Commence Work July 29, 2022
3 Date Contract effectivity ‘August 1, 2022
4 Original Contract Time 32c0.
5 Date Actually Started ‘August 1, 2022
6 Date Original Expiry September 1,2022
Days Time Ext. : N/A
Days Time Ext. N/A
ays Time Ext. : NA
Days Suspended N/A
Days Suspended N/A
7 Change Order No. 2 N/A Amount
Change Order No, N/A Amount
Change Order No, 2 N/A ‘Amount
Supplemental Agreement 2 N/A ‘Amount
8 Suspension Order No. WA Date
Suspension Order No. NA Date
9 Total Time Extension / Suspensions N/A
‘Approved to Date
10 Total Calendar Days Extended to Date N/A
(Original Contract Time/Extensions/
Supervision)
11 Latest Revised Expiry Date 2 N/A
12 Actual Date Completed ‘August 24, 2022
413. Number of Calendar Days Elapsed 2
4 Number of Days subjected to Liquidated N/A
Damages line 13 less line 10)
15 % Time Elapsed 100.0%
16 % Planned Accomplishment of date 75.00%
17% Actual Accomplishment of date 100.0%
18 % Slippage (+/-) 25.00% positive
Prepared By:
GGENECRIS J. LACHICA
Mupicipal Engineer
N/A
NA
N/A
N/A
N/A
N/Ao “So
Republic of the Philippines
Province of Romblon
MUNICIPALITY OF LOOC.
www. loocromblon.gov.ph
OFFICE OF THE MUNICIPAL ENGINEER
August 30, 2022
FINAL INSPECTION REPORT
PROJECT REHABILITATION OF LOCAL ACCESS ROAD IN SITIO NEW
VILLAGE, CAMANDAG
LOCATION : CAMANDAG, LOOC, ROMBLON
CONTRACTOR : NOLAN CONSTRUCTION
We the undersigned conducted a joint inspection of the above ~ stated project on the above-
mentioned date and found the project to be 100% accomplished as reflected in the attached statement of
work accomplishment report signed by the Municipal Engineer in accordance with the plan and
specifications of the contract.
Mbnicipal Engineer Arel a I
GENKCRIS J. LACHICA
NOTED:
Ny
Atty. LISEITTE M. ARBOLEDA
Mulicipal Mayor
GOVERNMENT OF LOOC-PROVINCE OF ROMBLON: CLEMENTE STREET, BARANGAY POBLACION 5507@e Se:
SA Republic of the Philippines
Province of Romblon
MUNICIPALITY OF LOOC
www.loocromblon.gov.ph
OFFICE OF THE MUNICIPAL MAYOR
August 30, 2022
CERTIFICATE OF COMPLETION
TO WHOM IT MAY CONCERN:
This is to certify that NOLAN CONSTRUCTION, with office address at
Poblacion, Looc, Romblon, was the Contractor of the Rehabilitation of Local
Access Road in Sitio New Village, Camandag ai Camandag, Looc, Romblon.
That the construction services rendered by the above-mentioned
company started on August 01, 2022 and was completed on August 24, 2022
This certification is issued upon the request of Nolan Construction for
whatever legal purpose it may serve
Wi
Atty. LISENTE M. ARBOLED,
Munidipal Mayor
Sais
LOCAL GOVERNMENT OF LOOC-PROVINCE OF ROMBLON: TIROL STREET, BARANGAY POBLACION 5507PROVINCE OF ROMBLON |
MUNICIPALITY OF LOOC
TECHNICAL DRAWINGS
AS-BUILT PLAN OF REHABILITATION OF LOCAL ACCESS ROAD IN
SITIO NEW VILLAGE, CAMANDAG
LOCATION: BRGY. CAMANDAG, LOOC, ROMBLONj
—
TYPICAL ROADWAY SECTION (PT.142.00Mts-182.00Mts.)
JON/LONGITUDINAL JOINT ON CARRIAGEWAY AND
ER| o+a00.0 | or0300 |
PROPOSED PoC? PROPOSED PccP |
‘COORDINATE COORDINATE
Lar. izrtes2N
LONG. 121°58'33"
ELEV. 36.15
SrA. | | starr.
tar, 121632"N
LONG. 121°58'3
ELEV. 36.01
55 |
te 5 | eyoorpnovecr
ig cram oraton eta g | seme
FE SS : |
Be z "%
a5 |
@ io
(LT) STRAIGHT LINE DIAGRAM
a eS sexe ——— =
j ; } Ea psn [3 |
a es we a =ROAD BEARINGS, ELEVATIONS & GRADES (PT. 0,000-PT.182.0)
3ING TRANSVERSE CONSTRUCTION
LGCATION OF WEAKENED PLAN JOT
CONSTRUCTION JOINT WATHIN THE)
‘orsuae
©
_VIDTH AS SHOWNTON PLANS
TRANSVERSE CONSTRUCTION
‘MIDOLE TARD OF NORMAL JONT
—
EXPANSION JOINT @ EVERY $0.H, ANCHOR AT EVERY ADJACENT EXISTING STRUCTURES
DeTAIL’A"
LONGITUDINAL CONSTRUCTION JOINT