g Nuovo Pignone                                                                                                                     No.
STD-ET-211
                                                                          COMMISSIONING                                                page 1 of 2
                FIRENZE                                                      FORM                                                      date
                                                                 MV ELECTRICAL MOTORS
           Motor Item:.....................................................................................................................................................
           Service:...........................................................................................................................................................
                                                                    INSTRUMENTS FOR TEST
           - Voltage generator for voltage applied test
           - 500 - 5000 V megger
                  Motor insulation               M ohm                       R S T -. ground                      =                                      NOTES
                                                              Polarization
  Time               R - ( S T ground )=                      S - (R T ground )=                       T - ( R S ground )=
  1 min.
  10 min.
                     IP =
                                                              Load test
  Nom. volt. V =                                              Pickup time sec.=                        Curr.Abs.. A. =
  Pickup curr. A =                                            Speed RPM =                              Direct. of rot.=
                                                           Bearings
  Bearing 1 - Lubrication                                                                    Temp. °C             =
  Bearing 2 - Lubrication                                                                    Temp. °C             =
                                           Instruments
                Thermometers
                Thermoresistances
   2.3          Initial plant situation
                Power supply panel energized
                Functional tests of control logic
                Control cables tested and connected
                Power supply cables tested and connected
STD-ET-211                                                                                                                                           Page 1 of 2
                                                                MV ELECTRICAL MOTORS
                 Ground connection tested and tightened
                 Motor connected as per project
                 Coupling uncoupled (where possible).
                 Mechanical checks
                 Danger warning bills hanged
    3.1          Preliminary checks
                 Electrical energizing in safety
                 Heaters (if any)
                 Insulation resistance of motor
                 Power supply compartment
                 Thermic relay calibration
                 Free rotation of motor by hand
    3.2          Functional test
                 Direction of rotation
    3.3          No load test                                                                                                           See mechanical Standard
    3.4          Load test                                                                                                              See mechanical Standard
    4.0          Final setup
 Contractor                                                Nuovo Pignone:                                             Final Client:
 .......................................................   .......................................................... .........................................................
STD-ET-211                                                                                                                                            Page 2 of 2