g Nuovo Pignone                                                                                                                          No.
STD-MT-253-1
                                                                             COMMISSIONING                                                  page 1 of 2
                  FIRENZE                                                       FORM                                                        date
                                                                      CENTRIFUGAL PUMPS
             Pump Item:             ....................................................................................................................................
             Service:................................................................................................................................................
  POS. No.                                   ACTIVITY                                    CHECK                  DATE                                NOTES
       2.2             Instruments used in testing
         1             Clump tester
         2             Temporary thermometers
       2.3             Initial situation verification
         1             End of erection documents
         2             Area and equipment clean
         3             Power supply cables insulation
         4             Signalling and control cables tested
         5             Electrical motor checked
         6             Group aligned (if applicable)
         7             Ground           connection            tested          and
                       tightened
         8             Power supply panel energized
       3.1             Commissioning activities
         1             Load test
         2             Functional test
       3.2             Final setup
 Contractor:                                                  Nuovo Pignone:                                              Final Client:
 .......................................................... ........................................................      ........................................................
STD-MT-253-1                                                                                                                                               Page 1 of 2
                                                                 CENTRIFUGAL PUMPS TEST
      Pump Item:...........................................Service:                   .....................................................................................
                                          TEMPERATURES                                         PRESSURES                 FLOW                  ELECTRICAL MOTOR
                                                                                                                                                                            Insulat.
    TIME            1            2            3           4            5         Amb.       Suction.     Delivery                         V          A           Speed
  before start                                                                                                           ---------                ---------
   00,10
   00,20
   00,30
   00,45
   01,00
   01,15
   01,30
   01,45
  02.00
 after stop
                   VIBRATION                                  Notes:
                   Hor.  Axial                Vertical
    Pos.         Amplit.Veloc.Amplit.    Ampilit.
                                  Veloc.     Veloc.
      1
      2
      3
      4
      5
      Date: ............................                         Test start time:           ..........................               Test stop time .........................
 Contractor:                                                  Nuovo Pignone.:                                              Final Client:
 ......................................................       ......................................................... ......................................................
STD-MT-253-1                                                                                                                                                  Page 2 of 2