STANDAMIlZED S P E C I F I C A T I O N
for
C I V I L ENGINEERING CONSTRUCTION
DN : EARTHWOKKS (RAILWAY S I D I N G S )
                    A p p r o v e d by t h e                                      O b t a i n a b l e from t h e
                    COUNCIL O F THE                                               SA BUREAU O F STANDARDS
                    SOUTH AFRICAN                                                 P r i v a t e B a g X191
                    BUREAU O F STANDARDS                                          Pretoria
                    on 3 March 1982                                               0001 R e p u b l i c of South A f r i c a
                                                  Telegrams : C o m p a r a t o r , P r e t o r i a
                            P u b l i s h e d and p r i n t e d i n t h e R e p u b l i c of South A f r i c a by t h e
                                                  South A f r i c a n B u r e a u of Standards
CONTENTS
             1   ..            SCOPE .........................................................................            5
             2                 IPRERPRETATIONS   ...............................................................          5
                   2.1         Supporting Specifications    ......................................................        5
                  2.2          Application  ...................................................................           5
                  2.3          Definitions  ...................................................................           5
             3   .3.1          MATERIALS  .....................................................................
                               Classification for Excavation Purposes       ........................................
                                                                                                                          5
                                                                                                                          5
                  3.2          Classification for Placing Purposes      ...........................................       5
                  3.2.1        Fills .........................................................................            5
                  3.2.2        Subballast layer   ..............................................................          5
                  3.3          Selection  ......................................................................          5
                  3.3.1        General .......................................................................             5
                  3.3.2        cuts ..........................................................................             5
                  3.3.3        Fills .........................................................................
                                     .........................................................................
                                                                                                                           5
             4.
             5.
                               PLANT
                               CONSTRUCTION   ..................................................................
                                                                                                                          5
                                                                                                                          6
                 5.1           Precautions  ...................................................................           6
                 5.1.1         Safety ........................................................................            6
                 5.1.2         Stormwater and groundwater and dust nuisance        ..................................     6
                 5..2          Methods and Procedures     ........................................................        6
                 5.2.1         Excavation  ....................................................................           6
                 5.2.2         Fills ................................ ........................................            6
                 5.2.3         Transport  ............................ ........................................           7
             6.                TOLERANCES  ........................... ........................................
                                                                                    .................................
                                                                                                                           7
               6.1             Degree of Accuracy and permissible Dev ations                                               7
             7.                TESTING .............................. ........................................
                                                                            ........................................
                                                                                                                           B
                  7.1          General ..............................                                                     8
                  7.2          Compaction Control    ................... ........................................         8
             8   .             MEASUREMENT AND PAYMENT     .............. ........................................        R
                 8.1           Basic Principles   ..............................................................          8
                 8.2           Computation of Quantities     .....................................................        R
                 8.3           Scheduled Items   ...............................................................          8
DRAWINGS
          1.         SCOPE
          1.1        This specification covers earthworks for the construction of sidings to be used for the conveyance of
                     railway traffic from main lines of the South African Transport Services (SAK) onto and in private
                     property whether by SAR or private locomotives. It covers cut to fill operations for tracks and
                     marshalling yards and excavations for culverts and drainage.
                     NOTE: The standards referred to in the specification are listed in Appendix A.
          2.        INTERPWTATIONS
          2.1       SUPPORTING SPECIFICATIONS
          2.1.1     Where this specification is required for a project, the following supporting specifications shall, inter
                    alia, form part of the contract document:
                    a) Project specification;
                    b) SABS 1200 A or SABS 1200 AA, as applicable;
                    c) SABS 1200 D or SABS 1200 DA, as applicable; and
                    d) SABS 1200 C.
          2.1.2     In addition, if work involving pipe trenches, concrete, or stormwater pipes, is included in the contract,
                    the following specifications may be required:
                    a) SABS 1200 DB;
                    b) SABS 1200 G or SABS 1200 GA; and
                    c) SABS 1200 LE.
          2.2        APPLICATION. This specification contains clauses that are generally applicable to earthworks for railway
                     sidings. Interpretations and variations of this specification are set out in Portion 2 of the project
                     specification which precedes this specification in a contract document.
          2.3        DEFINITIONS. For the purposes of this specification the definitions and abbreviations given in the
                     applicable of the specifications listed in 2.1 and the following definitions shall apply:
                     Cutting-. An excavation that provides basically for the formation, but that includes excavation for
                     undercut, borrow, or drainage.
                     Down-let. A lined drain to carry stormwater down a slope.
                     Fill (embankment). A filling constructed to provide for the formation.
                     Formation. The prepared surface on which the ballast and track are laid.
                     Subballast layer. The uppermost layer of the formation.
                     Table drain. A drain along the edge of the formation.
                     Undercut. An excavation made below the formation level or below the bottom of an embankment for the
                     removal of unsuitable material.
          3.         MATERIALS
          3.1        CLASSIFICATlON FOR EXCAVATION PURPOSES. All cut to fill, cut to spoil, borrow to bank, and excavations
                     for foundations and drains will be classified as set out in Subclause 3.1.1 of SABS 1200 D or Subclause
                     3.1.1 of SARS 1200 DA, as applicable.
          3.3       SELECTION
          3.3.1     General. Excavation work shall be so planned and executed that material is excavated and placed in
                    accordance with the requirements for classification given in 3.1 and 3.2 and the requirements given in
                    3.3.2 and 3.3.3.
          3.3.2     -
                    Cuts. Suitable material from cuts (in preference to selected materials from borrow pits or other sources)
                    shall be used to form fills. Operations shall be so arranged that suitable material for fills can be
                    selected as the work proceeds.
                    The work shall be so programmed that, as far as is reasonably possible, excavated material is transported
                    directly to its final position without being stockpiled. If stockpiling is unavoidable, materials
                    intended for different uses shall be stockpiled separately.
                    Any material that is below the formation level and that in the opinion of the Engineer is unsuitable,
                    shall be excavated and disposed of as directed. The resultant space shall be refilled with approved
                    imported material and compacted as specified.
          3.3.3     -
                    Fills. The Contractor shall ensure that all material selected is placed in the correct position in the
                    fill.
          4.        PLANT
          4.1       The requirements of Clause 4 of SABS 1200 D or Clause 4 of SABS 1200 DA, as relevant, shall apply.
     This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
               entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
                                     that no more than five persons have concurrent access to the standard.
SABS 1200 DN-1982                                                                         6
Earthworks ( r a i l w a y s i d i n g s )
5.            CONSTRUCTION
5.1           PRECAUTIONS
5.1.1         S a f e t y . The requirements of Subclausc 5.1.1 of SABS 1200 D or Subclause 5.1.1 of SAnS 1200 DA, as
              r e l e v a n t , s h a l l apply.
5.1.2         Stormwater and Groundwater and D u s t Nuisance. The requirements of Subclauses 5.1.3 and 5.1.4 of SABS
              1200 U o r Subclauses 5.1.4 and 5.1.5 of S A R S 1200 DA, a s r e l e v a n t , s h a l l apply.
5.2.2
5.2.2.1
              -
              Fills,
              Preparatkn
              a ) C l e a r i n g s i t e . Shrubs, bush, stumps, and d e b r i s s h a l l be removed completely from t h e r i g h t of way f o r
              t h e s i d i n g . Boulders s h a l l be removed t o t h e e x t e n t r e q u i r e d i n terms of t h e p r o j e c t s p e c i f i c a t i o n . A l l
              t r e e s w i t h i n 5 in of t h e formation s h a l l be uprooted and s i m i l a r l y removed. The C o n t r a c t o r s h a l l d i s p o s e
              of a l l c l e a r e d m a t e r i a l t o d e s i g n a t e d sites.
              b ) S u i t a b l e i n - s i t u m a t e r i a l . Where t h e i n - s i t u m a t e r i a l a t t h e b a s e of f i l l s i s a c c e p t a b l e and t h e
              Engineer r e q u i r e s t h a t t h e b a s e be c o n s o l i d a t e d , t h e t o p 150 mm or such o t h e r depth a s may be d i r e c t e d
              s h a l l , a f t e r t h e a r e a has bee11 c l e a r e d as s p e c i f i e d i n ( a ) above, be compacted a t OMC to a d e n s i t y of a t
              l e a s t 93 % o r 95 % of modificd AASHTO maximum d e n s i t y a s d i r e c t e d .
              c) Unsuitable i n - s i t u m a t e r i a l . Unsuitable i n - s i t u m a t e r i a l a t the base of f i l l s or i n t h e f l o o r of
              c u t t i n g s s h a l l be removed by excavating t o such d e p t h s , w i d t h s , and l e n g t h s a s a r e d i r e c t e d , t o allow f o r
              t h e p l a c i n g and compaction of approved m a t e r i a l a f t e r t h e t o p 150 mm of t h e s o i l l e f t i n p l a c e h a s been
              compacted a t OMC t o a d e n s i t y of a t l e a s t 93 % o r 95 % of modified MSHTO maximum d e n s i t y as d i r e c t e d .
              d ) Renching. O n ground with a s l o p e yreater t h a n one v e r t i c a l to s i x h o r i z o n t a l and on t h e s i d e s of
              e x i s t i n g embankments t h a t are t o be widened, t h e s u r f a c e s h a l l be benched as d i r e c t e d .
              e) Catchwater d r a i n s . Catchwater d r a i n s o r mounds ( o r both) t o t h e dimensions shown o n t h e d e t a i l
              drawings s h a l l be c o n s t r u c t e d n o t less t h a n 5 m from t h e t o p of t h e b a t t e r of a l l c u t s and elsewhere a s
              directed.
5.2.2.2       Placinq
              a) General. Of t h e m a t e r i a l o b t a i n e d from c u t s and borrow p i t s only m a t e r i a l t h a t i s f r e e from stumps,
              trees, rubbish, and o t h e r d e l e t e r i o u s m a t e r i a l and i s approved hy t h e Engineer s h a l l be placed i n t h e
              lower l a y e r s of t h e f i l l and m a t e r i a l of t h e same or b e t t e r qual.ity s h a l l be p l a c e d i n t h e upper p o r t i o n
              of t h e f i l l .       (See Subclause 3.2.1 of SABS 1200 D or Subclause 3.2.1 of SABS 1200 UA, a s a p p l i c a b l e . )
              Where it i s necessary t o u s e c l a y o r c l a y e y m a t e r i a l , t h e Enginc?er may d i r e c t t h a t such m a t e r i a l be
              placed w i t h i n n o t less than 1 m of t h e f i n i s h e d s u r f a c e and n o t more than 6 m below it.
              Rock having a maximum dimension exceeding 600 mm s h a l l n o t b e p l a c e d a t t h e b a s e of t h e f i l l .
              Throughout t h e work t h e f i l l s h a l l be c o n s t r u c t e d t o advance uniformly o v e r t h e whole width w i t h a s l i g h t
              c r o s s f a l l over t h e s u r f a c e f o r drainage.            The C o n t r a c t o r s h a l l a r r a n g e i r i s o p e r a t i o n s so t h a t each l a y e r
              of f i l l can be compacted i n s u i t a b l e continuous s e c t i o n s which, u n l e s s o t h e r w i s e agreed by t h e Engineer,
              s h a l l be of t h e g r e a t e s t l e n g t h p r a c t i c a b l e .
              The f i l l m a t e r i a l s h a l l be d e p o s i t e d i n l a y e r s of t h i c k n e s s , b e f o r e compacting, not exceeding 300 mm.
              The m a t e r i a l s s h a l l be s p r e a d and mixed t o form a l a y e r of approximately uniformly graded m a t e r i a l over
              t h e whole width of t h e f i l l . Oversize (exceeding 300 mm) mater;.al t h a t cannot be broken down t o t h e
              maximum p e r m i s s i b l e s i z e s p e c i f i e d s h a l l be removed and used a s d i r e c t e d .                   Each l a y e r s h a l l be watered
              and compacted t o t h e s p e c i f i e d d e n s i t y .           During compaction, every l a y e r s h a l l be maintained t o t h e
              r e q u i r e d s l o p e and c r o s s - s e c t i o n by means of s e l f - p r o p e l l e d g r a d e r s , and a l l h o l e s and d e p r e s s i o n s s h a l l
              he f i l l e d w i t h approved m a t e r i a l .
              The C o n t r a c t o r s h a l l ensure t h a t stormwater w i l l a t a l l t i m e s be d i s c h a r g e d uniformly over t h e f u l l
              l e n g t h of each embankment or through down-lets.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
          entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
                                that no more than five persons have concurrent access to the standard.
                                                                        7                                        SABS 1200 DN-1982
                                                                                                      Earthworks (railway sidings
                      b) Rock fills. Rock excavated from cuttings shall be used in the portion of the fill that is more than
                      1 m below a subballast layer. The rock material shall be deposited in layers of thickness at least
                      sufficient to accommodate the bulk of the material, provided that the thickness of the uncompacted layer
                      does not exceed 750 mm. Oversize (exceeding 750 mm) material shall be either broken down to size or,
                      where by the nature of the material this is impracticable, moved clear of the Works.
                      The rock fill shall be spread and sorted by a bulldozer large enough to obtain a uniform layer thickness.
                      Any oversize (exceeding 750 nun) fragments shall be dozed to the outside of the embankment and removed as
                      spoil. After the material has been spread, the interstices shall be filled with smaller rock or
                      fine-grained material and if, after the addition of such material, the stone layer is still too rough to
                      roll, sufficient fine-grained material shall be added to blind the surface, or the unevennesses s h a l l be
                      broken down by knapping. The layer shall then be watered and given six passes of a 6 t vibrating roller
                      or four passes of a 10 t vibratiiig roller. If the "lock" or the void in the finished layer is not to the
                      satisfaction of the Engineer, he may order spot dumping and hand distribution of suitable fine material,
                      and the application of further water between passes and such additional rolling as he may consider
                      necessary for a dense stable embankment fill to be obtained.
                      The portion of the fill between 200 mm and 1 m below the subballast level shall be constructed in layers
                      of thickness not exceeding 300 mm before compaction. The layers shall be formed with material containing
                      no lumps, stones, or clods that, after being broken down and compacted, have any dimension greater than
                      75 mm.
                      c) Backfill and compaction at structures. The requirements of Subclause 5.2.3.2 of SABS 1200 D or
                      Subclause 5.2.3.2 of SAHS 1200 DA, as applicable, shall apply.
                      d) Down-lets. Down-lets shall be constructed as shown on the detail drawings in positioiis as directed.
         5.2.2.3      Compaction. The material used in the fill shall be compacted at OMC to a density of at least 95 % of
                      modified AASHTO maximum density in the subballast layer, and at least 93 % of modified AASHTO maximum
                      density below that layer. Where non-cohesive soils are used, the density shall be at least 100 % of
                      modified RASIITO maximum density.
                      The compaction moisture during construction shall be the optimum moisture content for the construction
                      plant employed.     .
                      The material to be compacted shall be thoroughly broken up over the full width and depth, water shall be
                      added if necessary, and the whole mixed until a uniform and homogeneous mixture is obtained. Should the
                      material be too wet, because of rain or any other cause, it shall be harrowed and allowed to dry out to
                      the correct moisture conteiit before compaction is proceeded with.
                      Any weak spots that become apparent duriny compaction shall be cut out and repaired with sound material
                      at the Contractor's expense.
         5.2.2.4      Finishinq
                      a) Final grading. On completion of the cuts, table drains, and fills to formation level the whole surface
                      shall be graded, shaped to camber, and compacted to final grades and levels. The surface shall be
                      lightly watered.
                      b) Topsoilin%. Topsoil on the slopes of embankments and cuttings shall not be consolidated. The
                      thickness of the layer shall be not less than 75 mni unless otherwise scheduled or required in terms of
                      the project specification. Such topsoil will not be regarded as forming part of the embankment, and the
                      widths specified or directed tor embankments shall not be reduced to allow for the thickness of topsoil
                      placed. Topsoiling shall proceed as embankments are constructed. Topsoiling of each side slope shall be
                      started before the height of the slope exceeds 5 m.
                      c) Grassinq. The requirements of Subclause 5.2.4.3 of SABS 1200 D or Subclause 5.2.5.3 of SABS 1200 DA,
                      as relevant, shall apply.
         5.2.3        Transport
         5.2.3.1      Freehaul. Except where otherwise specifically indicated and subject to the provisions of Subclause
                      5.2.5.1 of SAHS 1200 D or Subclause 5.2.6.1 of S A W 1200 DA, as applicable, all movement of cut and fill
                      materials will be regarded as freehaul.
         5.2.3.2      Overhaul.. Disposal of surplus material outside the servitude beyond a distance of 0,s km from source
                      will be regarded as overhaul.
                      The Contractor shall not incur overhaul expenses without prior approval.
         6.           TOLERANCES
         6.1          DEGREE OF ACCURACY AND PEHMISSIBLE DEVIATIONS. The degree of accuracy of the finished work shall be as
                      stated in the project specification and the permissible deviations '(PD) (see Clause 6 of SABS 1200 A or
                      Clause 6 of SABS 1200 AA, as applicable) shall be within the appropriate of the following limits (Degree
                      of Accuracy II shall apply if no degree of accuracy is specified):
                                                                                                          Permissible deviation
                                                                                                      I    Degree of accuracy       I
                      a) Bulk earthworks
                      1) Cut slope surface.(batters) parallel to centre
                      than rock cuttings
                                                                            ~
                                                                                line:
                                                                                  ~~    -
                                                                                        other
7.           TESTING
7.1          GENERAL.      The requirements of Clause 7 of SABS 1200 D o r Clause 7 of SABS 1200 DA, a s r e l e v a n t , s h a l l
             apply.
        I
                3700
      TABLE DRAIN
                         2750
                                       1
                                       I
                                       I
                                        I
                                                     BATTER AS SPECIFIED
                                                                                                                         4z
                                                                                                                         -21
                                                                                                                          5.
                                                                                                                               t
                                                                                                                                                  32 0 0
                                                                                                                                              I : 25
                                                                                                                                                               , ,             1I
                                                                                                                                                                      2000 LEVEL
I: 25
                                                    2 500                                                                 0
a           I            2500
                                        I                                                                                 LL
                                                                                                                          a
                                                                                                                                                                    5 5 0 0 FORMATION
            X                                                             X                                               F.
W                               5 5 0 0 FORMATION
        I
                                                                                             6000 LEVEL
                                                                                                                                                                                                            m
                                                                                                                                                                                                            sl
                                                                                                                                                                                                            r(
                                                                                                                                                                                                            R
                                                                                                                                                                                                            3-
                                                                                                                                                                                                            0
9 000
                                  X                                                                                                                                            X
                                                                                          9 5 0 0 FORMATION
                                            NOTE     X      X
                                                     NO LONGITUDINAL SERVICES MAY BE LOCATED WITHIN THE LIMITS
                                                     DEFINED THUS X        X
    Dimensions in milimeters
                                                           TYPICAL CROSS- SECTION OF DOUBLE TRACKS
 This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
           entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
SABS 1200 DN-1982                that no more than five persons have
                                                                 10 concurrent access to the standard.
Earthworks ( r a i l w a y s i d i n g s )
Reference is made t o t h e l a t e s t i s s u e s of t h e f o l l o w i n g s t a n d a r d s :