STANDARDIZED SPECIFICATION
for
CONTENTS
. SCOPE ............................................................................... 5
1
2 .2.1 INTERPRETATIONS .....................................................................
Supporting Specifications ...........................................................
5
5
2.2 Application .........................................................................
Definitions and Abbreviations .......................................................
5
5
2.3
3 . MATERIALS ...........................................................................
Classification for Excavation Purposes ..............................................
5
5
3.1
3.1.1 Method of classifying
Classes of excavation
...............................................................
...............................................................
5
5
3.1.2
3.2 Classification for Placing Purposes
Earthfill material
.................................................
..................................................................
6
6
3.2.1
3.2.2 Filter materials
Rockfill
....................................................................
............................................................................
6
6
3.2.3
3.2.4 Gravel capping ...................................................................... 6
3.3 Selection
General
...........................................................................
.............................................................................
6
6
3.3.1
3.3.2 Topsoil .............................................................................
Fill materials ......................................................................
6
6
3.3.3
Filter and rockfill materials ....................................................... 6
4 .4.1
3.3.4
PLANT ...............................................................................
Excavation Plant ....................................................................
6
6
Compaction Plant .....................................
.............................. ..................................... 6
5 .4.2 CONSTRUCTION
Precautions
..................................
................................... .....................................
6
6
5.1
5.1.1 Safeguarding of excavations
Explosives
...................
....................................
.....................................
.....................................
6
7
5.1.2
5.1.3 surfaces damaged by plant ..................... .....................................
.....................................
7
5.2 Methods and Procedures ........................
Clearing and stripping of Site ................ .....................................
7
7
5.2.1
5.2.2 Excavation ..................
Placing and compacting ...... .................
.................
.....................................
.....................................
7
8
5.2.3
5.2.4 Finishing ...................
Transport for earthworks
.................
.... .................
.....................................
..................................... 9
9
5.2.5
.6.1 TOLERANCES .................. ................. ...................................... 9
6
General ..................... ................. .....................................
I.
DRAWINGS
STANDARDIZED SPECIFICATION
for
CIVIL ENGINEERING CONSTRUCTION
1. SCOPE
1.1 This specification covers the requirements for the construction of small earth dams of height up to 15 m
as defined by the International Commission on Large Dams (ICOLD). It covers site clearing, Safety
precautions, excavation, and the selection, placing, and compacting of materials in the various zones of
the embankment.
NOTE: The standards referred to in the specification are listed in Appendix A.
2. INTERPRETATIONS
2.1 SUPPORTING SPECIFICATIONS. Where this specification is required for a project, the fOlloWing
specifications shall, inter alia, form part of the contract document:
a) Project specification;
b) SABS 1200 AD or SABS 1200 A, as applicable;
c) SABS 1200 GA;
and, in addition, 1200 DK may be required for the project.
2.2 APPLICATION. This specification contains clauses that are generally applicable to the construction of
small earth dams. Interpretations and variations of this specification are set out in Portion 2 of the
project specification which precedes this specification in a contract document.
2.3 DEFlNITIONS AND ABBREVIATIONS. For the purposes of this specification the definitions and abbreviations
given in the applicable of the specifications listed in 2.1 and the following definitions shall apply:
Dam basin. The part of the catchment area that is upstream of a dam wall, and that lies below the full
supply level of the dam.
Dispersive soil. A material that consists of clayey particles of colloidal size in a state in which they
can easily go into suspension in water.
Filter material
a ) A material that has a grain size distribution such that the voids between grains are smaller than the
finest grains of adjoining material on one side and with a grain size that is larger than the interstices
of adjoining material on the other side; or
b) A material such as a fine aggregate, a sandy madrial, or a woven or a non-woven fabric (geotextile)
having pore sizes that are fine enough to prevent.the migration of soil particles from a soil mass
I,
adjoining it.
Optimum moisture content (OMC). The moisture content at which the maximum dry density occurs in the test
for Proctor density.
Proctor density. The maximum dry density determined at OMC in accordance with the method given in
ASTM D 698.
Rip-raE. A surface layer of approved rockfill material placed to a specified controlled thickness.
Zone (of an embankment). A section of a dam wall that is wholly constructed with material that conforms
to a particular set of physical characteristics that are different from those of the material of an
adjoining zone. (See Drawing DE-2.)
3. MATERIALS
3.1 CLASSIFICATION FOR EXCAVATION PURPOSES
3.1.1 Method of Classifying. The Contractor may use any method he wishes to excavate any class of material,
but his chosen method of excavation shall not determine the classification of the excavation.
The Engineer will decide on the classification of the materials. In the first instance the
classification will be based on inspection of the material to be excavated and on the criteria given in
3.1.2(a)-(c).
~ l lequipment specified in 3.1.2(a)-(c) shall be in good working order. "Efficiently" as used in
3.1.2(a)-(c) shall be taken to mean "in a manner that can reasonably be expected of a contractor, having
regard to the production achieved".
In the event of disagreement between the Contractor and the Engineer it shall be the responsibility of
the Contractor, if so ordered and subject to the terms of 4.1, to make available at his own expense such
mechanical equipment as is specified in 3.1.2(a)-(c) in order to enable the reasonable removability or
otherwise of the material to be assessed. The decision of the Engineer on the classification shall then,
subject to the provisions of the contract, be final and binding.
3.1.2 Classes of Excavation (See Drawing DE-1). The excavation of material will be classified as follows for
purposes of measurement and payment:
a) Soft excavation
1) Soft excavation, other than in restricted excavation, shall be excavation in material that can be
efficiently removed or loaded without prior ripping by any of the following plant:
i) A bulldozer of mass (including the mass of a ripper if fitted) 22 t and flywheel power approximately
145 kW; or
ii) a tractor-scraper unit of total mass approximately 28 t and flywheel power approximately 245 kw,
pushed during loading by a bulldozer equivalent to that specified in (b) below; or
iii) a track-type front-end loader of mass approximately 2 2 t and flywheel power approximately 145 kw.
2) In the case of restricted excavation, soft excavation shall be excavation in material that can be
efficiently removed by a back-acting excavator of flywheel power approximately 0,lO kW for each
millimetre of tined-bucket width, without the assistance of pneumatic tools such as paving breakers.
b) Intermediate excavation
1) Intermediate excavation, other than in restricted excavation, shall be excavation (excluding Soft
excavation) in material that can be efficiently ripped by a bulldozer of mass approximately 35 t fitted
with a single-tine ripper suitable for heavy ripping, and of flywheel power approximately 220 kw.
2) In the case of restricted excavation, intermediate excavation shall be excavation (excluding Soft
excavation) in material that requires a back-acting excavator of flywheel power exceeding 0,io kW for
each millimetre of tined-bucket width or the use of pneumatic tools before the material can be removed by
equipment equivalent to that specified in (a)(2) above.
c) Hard rock excavation. Hard rock excavation shall be excavation (excluding boulder excavation) in
material that cannot be efficiently ripped by a bulldozer equivalent to that specified in (b)(l) above.
Such excavation generally includes material such as formations of unweathered rock that can be removed
only after blasting.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
that no more than five persons have concurrent access to the standard.
SABS 1200 DE-1984 6
Small earth dams
d) Boulder excavation Class A. Boulder excavation Class A shall be excavation in material containing
more than 40 2, by volume of boulders of size between 0,03 m3 and 20 m3, in a matrix of soft material or
smaller boulders.
Excavation in dolomite formations other than solid dolomite will also be classed as boulder excavation
Class A if the formation contains m r e than 40 X by volume of lumps of hard dolomite of size between
0,03 m3 and 20 m3, in a matrix of soft material or smaller 1 m p s of hard dolomite.
Excavation of solid boulders or lumps of hard dolomite of size greater than 20 m3 will be classed as hard
rock excavation. Excavation of fissured or fractured rock will not be classed as boulder excavation but
as hard rock or intermediate excavation according to the nature of the material.
e) Boulder excavation Class R. Where a material contains 40 % or less by volume of boulders or lumps of
hard dolomite ranging in size between 0,03 m3 and 20 m3, in (a matrix of soft material or smaller boulders
or lumps of hard dolomite, excavation of the boulders or lumps of hard dolomite in the said size range
will be classed as boulder excavation Class B.
The excavation of the rest of the material will be classed as soft or intermediate excavation accordina
to the nature of the material.
3.3 SELECTION
3.3.1 General. Where a zoned embankment is shown on the drawings, the Contractor shall ensure that the
material is correctly selected and placed in the correct zone in the embankment.
3.3.2 Topsoil. Topsoil removed from any borrow area within the dam basin shall be stockpiled and used as
directed.
Topsoil removed from any borrow area above the full supp:.y level of the dam shall be preserved for
reinstatement of the borrow area.
3.3.3 Fill Materials. Fill material for the construction of the embankment shall be obtained from the dam
basin or from within the boundaries shown on the drawings.
Suitable fill material from excavations shall be stockpiled for later use or used in the embankment.
Unsuitable material shall be disposed of as specified in 5.2.2.4.
3.3.4 Filter and Rockfill Materials. The sources from which filter and rockfill materials are supplied shall
be subject to approval.
4. PLANT
4.1 EXCAVATION PLANT. Although particular items of plant are specified in 3.1 for the classifying of
excavations, the Contractor is not obliged to provide or use those particular items of plant for carrying
out the work. However, should those items of plant not be freely available in good working order on the
Site, the Engineer shall be entitled to decide the classification of materials and types of excavation on
the basis of the good-working-order-performance of the items of plant provided by the Contractor, pro
rata to the theoretical performance of the items specified. (See 3.1.1.)
4.2 COMPACTION PLANT. The plant used for applying the dynamic load, controlling the moisture content, and
grading or mixing shall be capable of achieving the compaction specified (without over-compaction) with
the materials available for the construction of the Works.
5. CONSTRUCTION
5.1 PRECAUTIONS
5.1.1 Safeguarding of Excavations
5.1.1.1 __
The Contractor or his aqent or representative appointed in writinq shall be deemed to be and shall be
both the "excavator" and "a person competent to inspect bracing and shoring" as defined and required in
terms of the Factories, Machinery and Building work Act, 1941 (Act 2 2 of 1941).
5.1.1.2 should the depth of an excavation or the nature of the material excavated render the sides of the
excavation liable to movement that might endanger the Works or the workmen engaged on the excavation,
a) the sides of the excavation shall be supported by suitable timber or other sheeting adequately
strutted and braced, all being assembled properly and having sufficient strength and stiffness to prevent
mvement in the materials supported; or
b) alternatively, the Contractor may, subject to the approval of the Engineer, so reduce the slope of the
excavated face or faces that any danger to the Works or to the said workmen is removed.
NOTE: Depending on circumstances, the Engineer may or may not approve a change of slope in a cut-off
trench (see 5.2.2.2).
5.1.1.3 The Contractor shall make good any fall of rock or earth due to rain, flooding, insufficient timbering,
or other cause, and any cavities so formed shall be filled in at his own expense, as directed or by using
approvec? means.
5.1.1.4 Without relieving the Contractor in any way of his responsibility, the Engineer may order additional
lateral support for, or the sloping or reduction of the slope of, the sides of any excavation.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
that no more than five persons have concurrent access to the standard.
7 SABS 1200 DE-1984
Small earth dams
5.1.1.5 During the progress of each excavation, the Contractor shall report to the Engineer the presence of
bedding planes inclined towards the excavation, seepage water, and any other feature that may affect the
stability of the excavation, as soon as the presence of such feature(s1 is known.
5.1.1.6 All timbering and sheeting shall be removed from the excavation before the completion of the work, unless
the written permission of the Engineer allowing any portion to remain is obtained.
5.1.2 Explosives. Should blasting be necessary, the Contractor shall take every precaution to protect the
Works and persons, animals, and property in the vicinity of the Site. The Contractor will be held
responsible for any injury or damage caused by any blasting operations and shall, at his own expense,
make good such damage.
The transport, storage, and use of explosives shall comply with the provisions of the Explosives Act,
1956 (Act 26 of 1956) or Chapter 9 of the regulations published in terms of the Mines and Works Act, 1956
(Act 27 of 1956), as applicable. A copy of each blasting permit issued to workmen, and of each permit
issued to the Contractor to cover the purchase, storage, and transportation of explosives, shall be
handed to the Engineer. The Contractor shall grant the Engineer access to all records maintained for the
Inspector of Explosives or the Government Mining Engineer, as the case may be.
When blasting to specified profiles, the Contractor shall so arrange the holes and charges that the
resulting exposed surfaces are as sound as the nature of the material permits. The Contractor shall make
good at his own expense any additional excavation resulting from the shattering of rock in excess of any
overbreak allowance shown on the drawings or specified in the project specification.
NOTE: Where rock excavation by non-explosive methods is scheduled and ordered, the Contractor shall not
use explosives. Should the Contractor fail to carry out such an order he shall bear the cost of making
good any resultant over-excavation including its replacement with concrete or selected material, as
ordered.
5.1.3 Surfaces Damaged by Plant. Should the operation by the Contractor of any mobile plant of any type damage
any finished surface of any area normally open to the public, the Contractor shall repair such surface as
a matter of urgency and at his own expense.
Joints and cracks that are exposed in the excavation shall be cleaned to a depth of not less than three
times their width at the surface. Such joints and cracks shall then be filled with an approved grout.
where possible, a pipe shall be set at the bottom of a joint or crack and grout shall be pumped in until
the joint or crack is completely filled. Grout shall then be broomed and brushed across the top of the
joint or crack to ensure that the contact with the core or other zone material will be tight and
non-erodible. Except in the case of small cracks, the brushing of slush grout to fill a crack is not
acceptable.
Grout used for the purpose of filling cracks shall be highly plastic and buttery. The maximum size of
aggregate in grout used for filling a crack shall not exceed one-third of the width of the crack.
Depressed areas, potholes, and similar irregularities shall be filled with a plastic mix of 2 0 NPa/40 mm
concrete vibrated into place. Small ribs and similar irregularities shall be filleted to produce a slope
not steeper than 1:l.
The final rock surface shal1,havesmooth contours against which soil can be compacted by heavy equipment.
b) soil surfaces. Before each soil foundation is inspected by the Engineer, the Contractor shall ensure
that all loose material is removed from the foundation. After the foundation has been approved, the soil
shall be ploughed to a depth of 1 5 0 mm, wetted or dried, as applicable, and then compacted to at least
95 % of the Proctor density (see 6 . 2 ( b ) ) except that where the presence of dispersive soil has been
proved by the Engineer, the density shall be at least 98 % of the Proctor density. After the soil has
been compacted, the surface shall be scarified to a depth of 25 m to ensure bonding with the fill
material and, immediately after that, the embankment fill shall be placed directly on the prepared
surface.
5.2.2.3 Borrow pits. When the Contractor is required by the Engineer to open up borrow pits to obtain additional
or selected excavated material from designated sites, the Contractor shall first. clear the surface of the
sites in accordance with the applicable requirements of 5 . 2 . 1 . Topsoil and overburden shall be stripped
and stockpiled separately. The Contractor shall so maintain borrow pits that they do not become a danger
to persons and livestock.
The Contractor shall so plan and operate borrow pits as to obtain maximum use of the materials. Haulage
and access roads shall be kept to a minimum and the Contractor shall inform the Engineer fully of any
proposed routes for haulage and access roads to and from the borrow areas. On completion of borrowing
all unused material shall, except in the case of borrow pits that are below the full supply level of the
dam, be returned to the sides of the borrow pits and graded to a slope of 1 vertical to 4 horizontal.
In the case of borrow pits that are below the full supply level of the dam, the stockpiled topsoil shall
be used on the embankment or as otherwise specified in the project specification.
Borrow pj.ts that are outside the full supply level of 'the dam shall be so levelled off that they present.
an acceptable appearance, are fully free-draining, and are covered evenly and completely with the
stockpiled topsoil.
5.2.2.4 Disposal. The Contractor shall not spoil, stockpile, or waste any material without approval. In
addition to complying with the requirements of 5 . 2 . 2 . 3 for the disposal of unused material from borrow
pits, he shall dispose of surplus and unsuitable material in areas designated on the drawings or in the
project specification.
5.2.3 Placing and Compacting
5.2.3.1 Lines and grades. The embankment shall be constructed to the lines, grades, and levels shown on the
drawings or as directed. The allowance for settlement given on the drawings or specified in the project
specification shall be taken into account during construction so that the final crest level shortly after
construction, is at the height given on the drawings (see 8 . 2 . 1 ) .
5.2.3.2 Embankment
a) only material that
1) has been obtained from excavations or borrow pits, or both; and
2 ) has been approved and complies with the applicable requirements of 3 . 2 ,
shall be placed in the embankment.
b) A s far as is practicable the moisture content of the mate.ria1 for the embankment shall be adjusted in
the borrow pits. If required, water shall be added by spraying and mixed into the soil to bring it to
within the specified moisture content limits and to produce a uniform moisture content in the material.
Material containing excessive moisture shall be either stockpiled or harrowed.
c) The material of the embankment shall be placed in layers of thickness, before compaction, not
exceeding 300 mm. The material shall be spread over the area of the embankment and sloped sufficiently
to allow for the run-off of rainwater. Where the dam is constructed across a river, the construction
level of the embankment shall be always on the same horizontal level throughout to avoid concentration of
floods. Where it is economically advantageous to place the fill material at different levels during
construction of the dam, the Contractor shall have advised the Engineer, before starting the work, of his
intention to use such a method of construction and shall tak(e all the special precautions that have been
laid down by the Engineer in respect of the work.
d) Each layer shall be compacted, mainly by means of heavy compaction equipment, to at least the Proctor
density specified in the project specification for the particular zone or, where no such density is
specified, to at least 95 X of Proctor density, subject to the applicable tolerance specified in 6.2(b).
Compaction by hand-held compaction tools shall be kept to a minimum, and where they are used, such tools
shall be subject to approval.
Where the presence of dispersive soil has been proved by the: Engineer, the Contractor shall ensure that
the precautionary measures specified in the project specification are strictly adhered to.
e) In addition to the tests required in terms of 7 . 2 . the Engineer may order the Contractor to perform
tests to ensure that the specified density is attained throughout the entire thickness of a layer.
f) Should the material of the top layer of compacted material be too wet (from rain or other cause) to
allow the next layer to be placed, it shall be harrowed and (allowedto dry out to the specified moisture
content and recompacted. Should the top layer of compacted material dry out and form shrinkaue cracks,
it shall be harrowed, rewetted, and recompacted. The top surface of each layer shall be sufficiently
rough to ensure proper bonding with the succeeding layer. The Contractor may be required, at his own
expense, to scarify the surface if, in the opinion of the Engineer, the surface is too smooth to ensure
proper bonding.
g) Except where grassing of the downstream face is scheduled, fill material shall be placed 500 m wider
than the relevant width shown on the drawings to ensure proper compaction on the upstream and downstream
slopes, and then cut back.
11) End slopes and side slopes of partial fill sections in the embankment shall not be steeper than 1
vertical to 4 horizontal.
i) The distribution and gradation of materials in any zone shall be such that the embankment will be free
of lenses, pockets, streaks, and layers of material differing markedly in texture or gradation from the
surrounding material.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
that no more than five persons have concurrent access to the standard.
9 SADS 1200 DE-1984
Small earth dams
6. TOLERANCES
6.1 GENERAL. The degree of accuracy of the finished work and the permissible deviations (PD) (see Clause 6
of SABS 1200 A , SABS 1200 AA, or SABS 1200 AD, as applicable) shall be within the appropriate of the
limits given in 6.2.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
that no more than five persons have concurrent access to the standard.
SABS 1200 DE-1984 10
Small earth dams
Item
tII I1 I
*
4) Random fill material ...............................
5) Dispersive soil ....................................
7. TESTING
7.1 EXPLORATORY HOLES. The Engineer may require the Contractor to drill, auger, or excavate holes in advance
of the start of construction to determine founding conditiona or for other purposes. when so requested
by the Engineer, the Contractor shall provide labour, tools, machinery, and equipment for sinking such
exploratory holes and for refilling them. The operations specified in this subclause will be paid for as
daywork.
7.2 TAKING AND TESTING OF SAMPLES. The Contractor shall carry out sufficient tests to satisfy himself as to
the consistency of materials placed in embankments, around and over pipes, and as backfill to structures.
In addition he shall carry out routine compaction control tests to ensure that the specified densities
are being attained. Records of the test results and the Working sheets shall be kept in a systematic
manner and shall be submitted to the Engineer on a regular basis.
Routine in-situ control tests will be carried out by the Engineer at such frequency as he considers
necessary for the proper evaluation of the quality of the embankment, etc. (See also 5.2.3.2(e) and
8.1.3.)
7.3 MATERIAL OR COMPACTION STANDARD NOT TO SPECIFICATION. Where the Engineer's tests reveal that the
material used does not comply with the applicable requirements of the specification, or that the
compaction specified has not been attained, the Contractor rihall so rectify the work that the material
complies with the said requirements and the compaction specified is attained.
7.4 TRIAL EMBANKMENT. The Engineer may order the construction of a trial embankment to test the properties
and compaction characteristics of the earthfill material. In such an event the Contractor shall
construct the trial embankment in the manner specified for the main embankment. Payment for such work
will be made in terms of 8.3.7.
7.5 DENSITY. The density of the earthfill shall be measured in accordance with the standard Proctor test
(see ASTM D 698).
Should the average Proctor density determined from 10 consecutive routine compaction control tests at
random locations in the earthfill fall below the specified density, the Engineer may order that, before
further material is placed, the Contractor submit a revised compaction procedure for approval by the
Engineer.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
that no more than five persons have concurrent access to the standard. SABS 1200 DE-1'784
11
Small earth dams
Should the Engineer consider that any area in the earthfill is not receiving adequate compaction he may
require specific tests to be carried out.
should the Proctor density determined in any specific test be more than 5 percentage points belor that
required for the layer, the material in the area of work represented by that specific test shall be
reworked until it complies with the said requirement or it shall be removed from the emhankment, as
directed, at the Contractor's expense.
measured. The sum or rate, as applicable, shall cover the cost of compliance with 5.2.1.4.
8.3.2 Remove Topsoil to Nominal Depth 150 mm (or other Stated Depth), Stockpile,and Maintain .... Unit: 2
m or m
3
The rate shall cover the cost of removal of topsoil to a nominal depth of 150 mm (or other
stated depth), stockpiling, and preventing dust nuisance.
Where removal to greater depths is ordered, the area measured for payment will, unless
otherwise scheduled, be increased pro rata to the average increase in depth.
8.3.3 Excavation
a) Material unsuitable for embankment .....................................................
The rate shall cover the cost of excavation in all materials (see Drawing DE-l), removal to
Unit: n
3
c) Fertilizer
d) Watering
...
at the rate of ... kg/ha................................................
............................................................................... Unit:
Unit:
ha
ha
8.3.10 Pitching/Gabions. If required, see Subclause 8.2 of SABS 1200 DK.
This standard is exclusively for Emnambithi Ladysmith Municipality for use on a shared file server. Under the copyright agreement
entered into, Emnambithi Ladysmith Municipality may make five (5) printouts of the standard and must see to it
that no more than five persons have concurrent access to the standard.
13 SABS 1200 DE-1984
Small earth dams
Fj
(I O R,"
HARD ROCK; SUBCLAUSE 8 . 3 . 3 ( c )
/GRAVEL CAPPING
RIP- RAP,
-- - - .
, . ....
F Y P A V A T F nTRENCH
CUT-OFF Tn / (SEE SUBCLArSE 5.2.1 )
i-iZE7.i66s 'CAYER'
(SEE SUBCLAUSE 5.2.2.2)
TYPE A
,- GRAVEL CAPPING
ROCK Y E
,GRAVEL CAPPING
GRADED C
TYPE C
Reference is made to the applicable issues (see Subclause 2.2 of SABS 1200 A or SABS 1200 AD, as applicable) of the
following standards:
ASTM D 698 Moisture-density relations of soils and soil-aggregate mixtures using 5.5-lb. (2.49-kg)
rammer and 12-in. (305-nun) drop
SABS 1200 A Civil engineering construction : General
SABS 1200 AD Civil engineering construction : General (small dams)
SABS 1200 DK Civil engineering construction : Gabions and pitching
SABS 1200 GA Civil engineering construction : Concrete (small works)
ISBN 0-626-06883-5