Letter No: IZZATNAGER DIVISION-ELECTRICAL /
Dated: 19/07/2024
IZN-elect-OT-8-3-202dt29 / 01535080108173
M/s BHOOMI CONTROLS-KANPUR.
G-21 Ispat Nagar Panki
Kanpur.- 208027
Uttar Pradesh, India
Sub: Letter Of Acceptance
Ref: 1. Tender No. IZN-elect-OT-8-3-202dt29 closing date 28-
06-2024 11:00 for Electrical work of provision of
Automatic Power Factor Control Panel at various
stations of Izatnagar Division.
2. Your bid ID 16898901 dated 27/06/2024 16:38
The Competent Authority has accepted your offered rates in
connection with the subject work. The total cost of the work at the
accepted rates works out to Rs. 1192252 (Rupees Eleven Lakh Ninety-
Two Thousand Two Hundred And Fifty-Two Rupees Only)
A sum of Rs.28000 deposited as Earnest Money vide IREPS
reference ID PE697222818585 has been retained towards initial
Security Money for due and faithful fulfillment of the contract, and the
balance Security Money will be recovered from the progressive bills @
6 % of the bill amount till it reaches 5 % of the contract value in terms
of clause 16(1) of General Conditions of Contract, April 2022..
You are requested to submit Performance Guarantee in the form as
given in Clause 16 (4) of General Conditions of Contract, April 2022.
equivalent to 5 % of the contract value amounting to Rs. 59612.6
(Rupees Fifty-Nine Thousand Six Hundred And Twelve Rupees And
Sixty Paise Only) within 21 days from the date of issue of Letter of
Acceptance, valid up to stipulated date of completion plus 60 days so
that contract agreement can be executed. Extension of time for
submission of PG beyond 21 (Twenty one) days and upto 60 days from
the date of issue of LOA may be given by the Authority who is
competent to sign the contract agreement. However, a penal interest of
12% per annum shall be charged for the delay beyond 21(Twenty one)
days, i.e. from 22nd day after the date of issue of LOA. Further, if the
60th day happens to be a declared holiday in the concerned office of
the Railway, submission of PG can be accepted on the next working
day. In all other cases, if the Contractor fails to submit the requisite PG
even after 60 days from the date of issue of LOA, the contract is liable
to be terminated. In case contract is terminated railway shall be entitled
to forfeit Earnest Money Deposit and other dues payable against that
contract. In case a tenderer has not submitted Earnest Money Deposit
on the strength of their registration as a Startup recognized by
Department of Industrial Policy and Promotion (DIPP) under Ministry
of Commerce and Industry, DIPP shall be informed to this effect. The
failed Contractor shall be debarred from participating in re-tender for
that work. Performance Bank Guarantee should be pledged in favour
of F.A & C.A.O. North Eastern Railway, Gorakhpur.
The entire work shall be completed within 4 month from the date
of issue of Letter of Acceptance. Work shall be governed by the
General Conditions of Contract, April 2022 with latest version &
correction slip.
Commencement of work :: The contractor shall commence the work
within 7 days after the receipt of Letter of acceptance.
Income Tax: Deduction of income tax shall be done as per prevailing
rule.
Stamp Duty: You are here by requested to submit non judicial stamp
paper of value Rs.70 per thousand of security money as per the above
and Rs.125 per thousand of the remaining security money of the
amount recovered on account bill. It is entire responsibility of the
contractor the ensure genuineness of stamp paper to be purchased from
the state government treasury. There is another option that, you
produce the non judicial stamp paper of Rs.100.00 and an affidavit
regarding payment of Balance stamp paper after the decision of
petition in favour of Railways.
Legal Binding: Until formal contract agreement is prepared &
executed, this letter shall constitute legal binding on both parties.
Registration: You are also advised to register your letter of acceptance
on Railways Shramikkalyan portal
(www.shramikkalyan.indianrailways.gov.in) immediately. During
execution of contract you have to fulfil the provisions of General
Condition of Contract for works mandatorily.
Declaration: On production of On Account bill/final bill, contractor
shall submit a certificate that (I have uploaded the correct details of
contract labours engaged in connection with his contract and payment
made to them during the wage period in Railway's Shramikkalyan
portal at www.shramikkalyan.indianrailways.gov.in. till .... month,
year)
Payment: On account payments will be made as per Para 46 of General
Conditions of Contract, April 2022
Variation: Do not do any work beyond the sanctioned cost of the work
without written order of the competent authority. Railway
administration shall not be responsible for the work done without
proper order.
Document: If any document of tenderer is found wrong, false/forge in
future, then appropriate action will be taken against the successful
tenderer.
Compliance: Since this work is involve a significant labour
component, therefore the provision of minimum wages act must be
complied strictly.
Execution of work: Please contact the Sr. Section
Engineer/Elect/west/Izzatnagar for further instruction and
commencement for this work.
Inspection of material:: All APFC Panel shall be inspected by the
RITES as per specification at the manufacture premises and inspection
cost shall be borne by the contractor.
Site Engineer: ADEE/Coaching/IZN is nominated as Site Engineer for
this work.
All Other terms and conditions, as stipulated in the tender
documents shall be applicable.
ANURAG SINGH
AEE/IZN
Digitally Signed
View Signature Details
Awarded Quantities And Rates
Item Item Desc Item Item Qty Unit Escl. Advt.Value Bid Rate/ Unit Bid
Sno. Code Qty Unit Rate(Rs) (%) (Rs) Rate Amount
(Rs)
Schedule 01-Electrical work with provision of APFC
Panel at various stations of Izatnagar Division. (Item 1395460.00
Directory - Not Applicable)
01 "Design, 01 2 Numbers 141000.00 At Par 282000.00 119850.00 Rs/Unit 239700.00
Manufacturing,
supply, fixing,
connecting
testing and
Commissioning
of 100 KVAR
APFC panel, as
per CPWD
Specification
fabricated with
CRCA sheet of
thickness 2.00
mm with 7
Tank process
powder
coated, CPRI
specification,
with supply,
fixing,
connecting
and
Commissioning
of consisting
of the
following
accessories: -
(A) Main MCCB
250 Amp 3
Pole 35/36KA -
01 No. Main
copper bus bar
TPN 400A
capacity-01
SET, APFC
Relay 8 stage -
01 No., LED
Indicator RYB
-03Nos (B)
MCCB 100 A
3-Pole 10 KA
-02 Nos. MCB
40 A 3-Pole 10
KA -02 Nos.
MCB 32 A 3-
Pole 10 KA -01
No. MCB 20 A
3-Pole 10 KA
-01 No. MCB
10 A 3-Pole 10
KA -01 No.
MCB 6 A 3-
Pole 10 KA -01
No. Contactor
Capacitor duty
type: - MOC
25 for 25
KVAR - 02 No.
MOC 15 for 15
KVAR - 02 No.
MOC 10 for 10
KVAR - 01 No.
MOC 05 for 05
KVAR - 01No.
MOC 03 for 03
KVAR - 01 No.
MOC 02 for 02
KVAR - 01 No.
Heavy Duty
capacitor :- 25
KVAR - 02No,
15 KVAR -
02No.,
10KVAR -
1No., 05 KVAR
- 01No.,
3KVAR -
01No., 2KVAR
- 01No. Auto
manual
selector switch
- 08 Nos. LED
indicator ON-
OFF - 16 Nos.
Along with all
the
accessories as
per site
requirement,
complete in all
respect as per
direction of
Engineer In-
charge. (LKU,
PBE switch
room each
100-100
KVAR)"
02 "Design, 02 2 Numbers 212000.00 At Par 424000.00 180200.00 Rs/Unit 360400.00
Manufacturing,
supply, fixing,
connecting,
testing and
Commissioning
of 150 KVAR
APFC panel, as
per CPWD
Specification
fabricated with
CRCA sheet of
thickness 2.00
mm with 7
Tank process
powder
coated, CPRI
specification,
with supply,
fixing,
connecting
and
Commissioning
of consisting
of the
following
accessories: -
(A) Main MCCB
320Amp 3 Pole
35/36KA - 01
No. Main
copper bus bar
TPN 400A
capacity - 01
Set APFC
Relay 12 stage
- 01 No. LED
Indicator RYB
-03Nos (B)
MCB 63 A 3-
Pole 10 KA -04
Nos. MCB 40 A
3-Pole 10 KA
-02 Nos. MCB
20 A 3-Pole 10
KA -01 No.
MCB 16 A 3-
Pole 10 KA -01
No. MCB 10 A
3-Pole 10 KA
-01 No. MCB 6
A 3-Pole 10 KA
-01 No.
Contactor
Capacitor duty
type: - MOC
25 for 25
KVAR - 04 No.
MOC 15 for 25
KVAR - 02 No.
MOC 10 for 10
KVAR - 01 No.
MOC 05 for 05
KVAR - 01No.
MOC 03 for 02
& 03 KVAR -
02 No. Heavy
Duty capacitor
:- 25 KVAR -
04No, 15
KVAR - 02No.,
10KVAR -
1No., 05 KVAR
- 01No.,
3KVAR -
01No., 2KVAR
- 02No. Auto
manual
selector switch
- 10 Nos. LED
indicator ON-
OFF - 20 Nos.
Along with all
accessories as
per site
requirement,
complete in all
respect as per
direction of
Engineer In-
charge. (IZN
division road
No 2 switch
room, TPU pit
line switch
room each
150-150
KVAR)"
03 "Design, 03 2 Numbers 110000.00 At Par 220000.00 93500.00 Rs/Unit 187000.00
Manufacturing,
supply, fixing,
connecting,
testing and
Commissioning
of 70 KVAR
APFC panel as
per CPWD
Specification
fabricated with
CRCA sheet of
thickness
2.00mm with
7 Tank process
powder
coated, CPRI
specification
with supply,
fixing,
connecting
and
Commissioning
of consisting
of the
following
accessories: -
(A) Main MCCB
200Amp 3 Pole
35/36KA - 01
No. Main
copper bus bar
TPN 300A
capacity - 01
Set, APFC
Relay 8 stage -
01 No., LED
Indicator RYB
-03Nos (B)
MCB 63 A 3-
Pole 10 KA -01
Nos. MCB 40 A
3-Pole 10 KA
-01 Nos. MCB
32 A 3-Pole 10
KA -02 No.
MCB 16 A 3-
Pole 10 KA -01
No. MCB 10 A
3-Pole 10 KA
-01 No. MCB 6
A 3-Pole 10 KA
-01 No.
Contactor
Capacitor duty
type:- MOC 25
for 25 KVAR -
01 No. MOC
15 for 25
KVAR - 01 No.
MOC 10 for 10
KVAR - 02 No.
MOC 05 for 05
KVAR - 01No.
MOC 03 for 02
& 03 KVAR -
02 No. Heavy
Duty capacitor
:- 25 KVAR -
01No, 15
KVAR - 01No.,
10KVAR -
2No., 05 KVAR
- 01No.,
3KVAR -
01No., 2KVAR-
01No. Auto
manual
selector switch
- 08 Nos. LED
indicator ON-
OFF - 16 Nos.
Along with all
accessories as
per site
requirement,
complete in all
respect as per
direction of
Engineer In-
charge. (NMC
switch room
no.2, KJN
switch room
each 70-70
KVAR)"
04 "Design, 04 1 Numbers 240720.00 At Par 240720.00 204612.00 Rs/Unit 204612.00
Manufacturing,
supply, fixing,
connecting,
testing and
Commissioning
of 170 KVAR
APFC panel as
per CPWD
Specification
fabricated with
CRCA sheet of
thickness
2.00mm with
7 Tank process
powder
coated, CPRI
specification
with supply,
fixing,
connecting
and
Commissioning
of consisting
of the
following
accessories: -
(A) Main MCCB
400 Amp 3
Pole 35/36KA -
01 No. Main
copper bus bar
TPN 600A
capacity - 01
Set, APFC
Relay 12 stage
- 01 No., LED
Indicator RYB
-03Nos (B)
MCCB 200 A
3-Pole 25 KA
-01 Nos. MCB
63 A 3-Pole 10
KA -02 Nos
MCB 40 A 3-
Pole 10 KA -02
Nos. MCB 25 A
3-Pole 10 KA
-02 Nos. MCB
16 A 3-Pole 10
KA -03 Nos.
MCB 10 A 3-
Pole 10 KA -01
No. MCB 6 A
3-Pole 10 KA
-01 No.
Contactor
Capacitor duty
type: - MOC
50 for 50
KVAR - 01 No.
MOC 25 for 25
KVAR - 02
Nos. MOC 15
for 15 KVAR -
02 Nos. MOC
10 for 10
KVAR - 02
Nos. MOC 05
for 05 KVAR -
03Nos. MOC
03 for 03
KVAR - 01 No.
MOC 03 for 02
KVAR - 01 No.
Heavy Duty
capacitor :- 50
KVAR - 01No,
25 KVAR -
02Nos, 15
KVAR -
02Nos.,
10KVAR -
2Nos., 05
KVAR -
03Nos., 3KVAR
- 01No.,
2KVAR - 01No.
Auto manual
selector switch
- 12 Nos. LED
indicator ON-
OFF - 24 Nos.
Along with all
accessories as
per site
requirement
complete in all
respect as per
direction of
Engineer In-
charge. (PBE
switch room
170 KVAR)"
05 "Design, 05 1 Numbers 70800.00 At Par 70800.00 60180.00 Rs/Unit 60180.00
Manufacturing,
supply, fixing,
connecting,
testing and
Commissioning
of 40 KVAR
APFC panel as
per CPWD
Specification
fabricated with
CRCA sheet of
thickness
2.00mm with
7 Tank process
powder
coated, CPRI
specification
with supply,
fixing,
connecting
and
Commissioning
of consisting
of the
following
accessories: -
(A) Main MCCB
125Amp 3 Pole
25KA - 01 No.
Main copper
bus bar TPN
300A capacity
- 01 Set, APFC
Relay 6 stage -
01 No., LED
Indicator RYB
-03Nos (B)
MCCB 40 A 3-
Pole 10 KA -01
No. MCCB 25
A 3-Pole 10 KA
-01 No. MCCB
16 A 3-Pole 10
KA -01 No.
MCCB 10 A 3-
Pole 10 KA -01
No. MCCB 6 A
3-Pole 10 KA
-01 No.
Contactor
Capacitor duty
type:- Moc 20
for 20 KVAR -
01 No. Moc 10
for 10 KVAR -
01 No. Moc 05
for 05 KVAR -
01No. Moc 03
for 03 KVAR -
01 No. Moc 03
for 02 KVAR -
01 No. Heavy
Duty capacitor
:- 20 KVAR -
01No.,
10KVAR -
01No., 05
KVAR - 01No.,
3KVAR -
01No., 2KVAR
- 01No. Auto
manual
selector switch
- 06 Nos. LED
indicator ON-
OFF - 12Nos.
Along with all
accessories as
per site
requirement
complete in all
respect as per
direction of
Engineer In-
charge. (TPU
switch room
40 KVAR)"
06 "Design, 06 1 Numbers 36000.00 At Par 36000.00 30600.00 Rs/Unit 30600.00
Manufacturing,
supply, fixing,
connecting,
testing and
Commissioning
of 20 KVAR
APFC panel as
per CPWD
Specification
fabricated with
CRCA sheet of
thickness 2.00
mm with 7
Tank process
powder
coated, CPRI
specification
with supply,
fixing,
connecting
and
Commissioning
of consisting
of the
following
accessories: -
(A) Main MCCB
100Amp 3 Pole
18KA - 01 No.
Main copper
bus bar TPN
100A capacity
- 01 Set, APFC
Relay 4 stage -
01 No., LED
Indicator RYB
-03Nos (B)
MCB 20 A 3-
Pole 10 KA -01
No. MCB 16 A
3-Pole 10 KA
-01 No. MCB
10 A 3-Pole 10
KA -01 No.
MCB 6 A 3-
Pole 10 KA -01
No. Contactor
Capacitor duty
type: - MOC
10 for 10
KVAR - 01 No.
MOC 05 for 05
KVAR - 01No.
MOC 03 for 03
KVAR - 01 No.
MOC 03 for 02
KVAR - 01 No.
Heavy Duty
capacitor :-
10KVAR -
01No., 05
KVAR - 01No.,
3KVAR -
01No., 2KVAR
- 01No. Auto
manual
selector switch
- 04 Nos. LED
indicator ON-
OFF - 08 Nos.
Along with all
accessories as
per site
requirement
complete in all
respect as per
direction of
Engineer In-
charge. (GHJ
switch room
20 KVAR)"
Digging of
trench in all
kinds of soil up
to the depth of
750 mm and
350 mm wide
for laying of
cable with
supply and
placing of
second-class
bricks, approx.
10 bricks per
meter, refilling
07 07 2000 Metre 49.47 At Par 98940.00 44.52 Rs/Unit 89040.00
of cable trench
with solid
earth
consolidating
by ramming
by 270 mm
above the
surrounding
level over
trench.
(Digging of
trench
conforming to
IS 1255).
08 Laying and 08 4000 Metre 5.75 At Par 23000.00 5.18 Rs/Unit 20720.00
connecting of
XLPE 1100
volts grade
(L.T.) cable of
suitable size
cable in
excavated
cable trench of
above item as
per
IS:1255/1983
(latest
version). Note:
- XLPE (L.T.)
cable will be
supplied by
the Railway at
site.
Schedule Totals 1192252.00
Total Value 1395460.00 1192252.00
Rebate on Total Value (%) 0.00
Net Bid Value 1192252.00
Item Breakup
No break up item added