DPWH Overtime Request for October 2024
DPWH Overtime Request for October 2024
OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: September 30 to October 03, 2024
1. MA. JOSEFINA D. LUISTRO 5:00PM - 8:00PM September 30 to 82% Preparation of Detailed plans for the Construction
Architect I October 03, 2024 of Multi-Purpose Building at Naga City (FINAL SITE -
Brgy. Balatas, Naga City)
2. LIANNE GRACE A. BRITON 5:00PM - 7:00PM September 30 to 40% Preparation of POW/ DUPA of the Construction/
Architect I October 03, 2024 Completion of Multi-Purpose Building (Rural Health
Unit), Barangay San Isidro, Magarao, Camarines Sur
3. MARK A. MORTEGA 5:00PM - 7:00PM September 30 to 85% Preparation of architectural plans for the
Architect I October 03, 2024 construction of three (3) storey nine (9) classroom,
school building,-CY 2024 Deped BEFF batch 1- new
construction) san jose, pili national high school, pili
camarines sur (for final DED plans)
4. JAYVEE DC. BOJOCAN 5:00PM - 7:00PM September 30 to 45% Preparation of Program of Works (with revisions)
for the Proposed Construction of Multi-Purpose Building
Architect I October 03, 2024 at Brgy. Carolina, Naga City, Camarines Sur
5. WENDELL WILLIAM S. QUINIANO 5:00PM - 8:00PM September 30 to 60% Preparation of POW and QTO of Improvement of
Architect I October 03, 2024 DPWH 3RD DEO Building, (Covered Roof Deck) at Baras,
Canaman, Camarines Sur
6. ANGELI GRANADA 5:00PM - 7:00PM September 30 to 55% Preparation of QTO,DUPA & POW of the
Architect I October 03, 2024 Construction of Multi-Purpose Building (Bureau of Fire
Protection), Brgy. Carolina, Naga City, Camarines Sur
7. YOBERT P. BAÑAGA 5:00PM - 7:00PM September 30 to 95% preparation of initial plans from the validation of
Architect I October 03, 2024 MPB (Evacuation Center) at Barangay La Purisima
Nuevo, Ocampo, Camarines Sur
8. VENESSE SOFIA R. LUCERO September 30 to 35% Drafted DED Plan and QTO for construction of MBP
Architect I 5:00PM - 7:00PM October 03, 2024 located at Paolbo, Calabanga, Camarines Sur
9. ALJO P. BELMES 5:00PM - 7:00PM September 30 to 75% Preparation of DED PLANS, POW, DUPA & QTO for
Architect I October 03, 2024 the PROPOSE CONSTRUCTION OF MPB at Barangay Del
Rosario, Naga City, Camarines Sur
10. MARK ANTHONY B. DIVINASFLORES 5:00PM - 07:00PM September 30 to 45% Preparation of DED Plans for the construction of
Architect I October 03, 2024 Multi-Purpose Building (Bureau of Fire Protection). Brgy.
Carolina, Naga City, Camarines Sur
11. MICHAEL ANGELO L. OSEA 5:00PM - 07:00PM September 23-26, 2024 60% Prepared BP 344 Quarterly Report for September
Engineer I 2024
12. REYNAN C. EBUENGA 5:00PM - 7:00PM September 09-12, 2024 70% Preparation of Structural Analysis of Multi-Purpose
Engineer I Building located at Barangay Carolina, Naga City
12. RICCI MARK I. LAURENTE 5:00PM - 7:00PM September 30 to 16% preparation of DED Plans & QTO for the
Construction of MPB PHASE II, Tabuco Naga City,
Architect I October 03, 2024 Camarines Sur,
JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.
The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section
OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 5, 2024
1. MA. JOSEFINA D. LUISTRO 8:00AM - 5:00PM October 5, 2024 92% Preparation of Detailed plans for the Construction
Architect I of Multi-Purpose Building at Naga City (FINAL SITE -
Brgy. Balatas, Naga City)
2. LIANNE GRACE A. BRITON 8:00AM - 5:00PM October 5, 2024 70% Preparation of POW/ DUPA/ ABC of the
Architect I Construction of Multi-Purpose Building (Rural Health
Unit), Barangay San Isidro, Magarao, Camarines Sur
3. JAYVEE DC. BOJOCAN 8:00AM - 5:00PM October 5, 2024 48% Preparation of Program of Works (with revisions)
for the Proposed Construction of Multi-Purpose Building
Architect I at Brgy. Carolina, Naga City, Camarines Sur
4. ANGELI GRANADA 8:00AM - 5:00PM October 5, 2024 55% Preparation of Revised QTO (Structural Design) of
Architect I the Construction of Multi-Purpose Building (Bureau of
Fire Protection), Brgy. Carolina, Naga City, Camarines
Sur
5. VENESSE SOFIA R. LUCERO 1:00PM - 5:00PM October 5, 2024 40% Prepared POW, DUPA and updated the price of
Architect I materials as per new CMPD for Construction of MPB
located at Paolbo, Calabanga, Camarines Sur
6. JOHN MICHAEL B. DE VERA 8:00AM - 5:00PM October 5, 2024 80% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur,
7. MARK ANTHONY B. DIVINASFLORES 8:00AM - 5:00PM October 5, 2024 60% Preparation of Preliminary Structural Plans for the
Architect I construction of Multi-Purpose Building (Bureau of Fire
Protection). Brgy. Carolina, Naga City, Camarines Sur
JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.
The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section
OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 7 - October 10, 2024
1. MA. JOSEFINA D. LUISTRO 5:00PM - 7:00/8:00PM October 7-8, 2024 98% Preparation of Detailed plans for the Construction
Architect I of Multi-Purpose Building at Naga City (FINAL SITE -
Brgy. Balatas, Naga City)
2. LIANNE GRACE A. BRITON 5:00PM - 7:00PM October 7-10, 2024 90% Preparation of POW/ DUPA/ ABC of the
Architect I Construction of Multi-Purpose Building (Rural Health
Unit), Barangay San Isidro, Magarao, Camarines Sur
3. MARK A. MORTEGA 5:00PM - 7:00PM October 7-10, 2024 15% Preparation of architectural plans (floor plans,
Architect I elevations, sections) for the construction of DPWH
Camarines sur 3rd DEO materials testing laboratory and
maintenance building, canaman camarines sur
4. JAYVEE DC. BOJOCAN 5:00PM - 7:00PM October 7-10, 2024 70% Preparation of Program of Works (with revisions)
for the Proposed Construction of Multi-Purpose Building
Architect I at Brgy. Carolina, Naga City, Camarines Sur
5. WENDELL WILLIAM S. QUINIANO 5:00PM - 8:00PM October 7-10, 2024 70% Preparation of Revision of Architectural and
Architect I Electrical DED plans of Improvement of DPWH 3RD DEO
Building, (Covered Roof Deck) at Baras, Canaman,
Camarines Sur
6. ANGELI GRANADA 5:00PM - 7:00/8:00PM October 7-10, 2024 60% Preparation of Revised QTO (Structural Design &
Architect I Architectural Finishes) of the Construction of Multi-
Purpose Building (Bureau of Fire Protection), Brgy.
Carolina, Naga City, Camarines Sur
7. VENESSE SOFIA R. LUCERO 50% Prepared POW and DUPA for the revised plan of
Architect I Construction of MPB located at Paolbo, Calabanga,
5:00PM - 7:00PM October 7-10, 2024 Camarines Sur
8. MARK ANTHONY B. DIVINASFLORES 5:00PM - 07:00PM October 7-10, 2024 45% Preparation of Preliminary Plans for Revision for
Architect I the construction of Multi-Purpose Building (Bureau of
Fire Protection). Brgy. Carolina, Naga City, Camarines
Sur
9. RICCI MARK I. LAURENTE 5:00PM - 8:00PM October 7-10, 2024 10% preparation of DED Plans Architectural (Spot
Details, Elevations & Sections), Structural (Schedule of
Architect I Beams & Columns) for the Construction of Multi
Purpose Building , Paolbo Calabanga Camarines Sur,
10. JOHN MICHAEL B. DE VERA 5:00PM - 7:00PM October 7-10, 2024 90% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur,
JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.
The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section
OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 12, 2024
1. LIANNE GRACE A. BRITON 8:00AM - 5:00PM October 12, 2024 80% Preparation of DED Plans of the Construction of
Architect I Multi-Purpose Building (Rural Health Unit), Barangay
San Isidro, Magarao, Camarines Sur
2. MARK A. MORTEGA 8:00AM - 5:00PM October 12, 2024 25% Preparation of architectural plans (reflected ceiling
Architect I plans, ceiling framing plans, bay sections and details)
for the construction of DPWH Camarines sur 3rd DEO
materials testing laboratory and maintenance building,
canaman camarines sur
3. WENDELL WILLIAM S. QUINIANO 8:00AM - 5:00PM October 12, 2024 80% Preparation of Revision of Architectural and
Architect I Electrical DED plans of Improvement of DPWH 3RD DEO
Building, (Covered Roof Deck) at Baras, Canaman,
Camarines Sur
4. ANGELI GRANADA 8:00AM - 5:00PM October 12, 2024 65% Preparation of Revised QTO (Architectural Finishes)
Architect I of the Construction of Multi-Purpose Building (Bureau of
Fire Protection), Brgy. Carolina, Naga City, Camarines
Sur
7. YOBERT P. BAÑAGA 5:00PM - 7:00PM August 27-29, 2024 50% preparation of initial plans from the validation of
Architect I MPB (Evacuation Center) at Barangay La Purisima
Nuevo, Ocampo, Camarines Sur
5. VENESSE SOFIA R. LUCERO 8:00AM - 5:00PM October 12, 2024 55% Prepared POW and ABC of the Final Plan for
Architect I Construction of MPB located at Paolbo, Calabanga,
Camarines Sur
6. JOHN MICHAEL B. DE VERA 8:00AM - 5:00PM October 12, 2024 95% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur
7. MARK ANTHONY B. DIVINASFLORES 8:00AM - 5:00PM October 6, 2024 20% Preparation of DED Plans for the construction of
Architect I Multi-Purpose Building (Bureau of Fire Protection). Brgy.
Carolina, Naga City, Camarines Sur
7. MICHAEL ANGELO L. OSEA 8:00AM - 5:00PM October 12, 2024 70% Preparation of Revised Structural Analysis and
Engineer I Design of MPB at Paolbo, Calabanga
8. RICCI MARK I. LAURENTE 8:00AM - 5:00PM October 12, 2024 13% preparation of DED Plans Architectural (Spot
Details, Elevations & Sections), for the Construction of
Architect I Multi Purpose Building , Paolbo Calabanga Camarines
Sur
JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.
The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section
OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 14 - October 17, 2024
1. MA. JOSEFINA D. LUISTRO 5:00PM - 7:00/8:00PM October 14-17, 2024 10% Preparation of preliminary plans for the
Architect I Construction/Improvement of MPB (Market) at Brgy.
Poblacion Central, Ocampo, Camarines Sur
2. LIANNE GRACE A. BRITON 5:00PM - 7:00PM October 14-17, 2024 90% Preparation of DED Plans of the Construction of
Architect I Multi-Purpose Building (Rural Health Unit), Barangay
San Isidro, Magarao, Camarines Sur
3. MARK A. MORTEGA 5:00PM - 7:00PM October 14-17, 2024 35% Preparation of architectural plans (schedule of
Architect I doors/ windows and details) for the construction of
DPWH Camarines sur 3rd DEO materials testing lab and
maintenance bldg, canaman camarines sur
4. JAYVEE DC. BOJOCAN 5:00PM - 7:00PM October 14-17, 2024 90% Preparation of POW (with revisions) for the
Proposed Construction of Multi-Purpose Building at
Architect I Brgy. Carolina, Naga City, Camarines Sur
5. WENDELL WILLIAM S. QUINIANO 5:00PM - 8:00PM October 14-17, 2024 90% Preparation of Revision of Architectural, Electrical,
Architect I and Electronics DED plans of Improvement of DPWH
3RD DEO Building, (Covered Roof Deck) at Baras,
Canaman, Camarines Sur
6. ANGELI GRANADA 5:00PM - 7:00PM October 14-17, 2024 70% Preparation of Revised QTO,DUPA & POW of the
Architect I Construction of Multi-Purpose Building (Bureau of Fire
Protection), Brgy. Carolina, Naga City, Camarines Sur
7. VENESSE SOFIA R. LUCERO 70% Prepared POW, ABC and BOQ for final of the
Architect I Construction of MPB located at Paolbo, Calabanga,
5:00PM - 7:00PM October 14-17, 2024 Camarines Sur
8. MARK ANTHONY B. DIVINASFLORES 5:00PM - 07:00PM October 14-17, 2024 48% Prep. of Prelim Plans for Revision for the
Architect I construction of MPB (Bureau of Fire Protection). Brgy.
Carolina, Naga City, Camarines Sur
9. JOHN MICHAEL B. DE VERA 5:00PM - 07:00PM October 14-17, 2024 95% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur
10. ALJO P. BELMES 5:00PM - 7:00PM October 14-17, 2024 95% Preparation of DED PLANS, POW, DUPA & QTO for
Architect I the PROPOSE CONSTRUCTION OF MPB at Barangay Del
Rosario, Naga City, Camarines Sur
11.YOBERT P. BAÑAGA 5:00PM - 7:00PM October 14-17, 2024 95% preparation of initial plans from the validation of
MPB (Evacuation Center) at Barangay La Purisima
Architect I Nuevo, Ocampo, Camarines Sur
95% preparation of initial plans from the validation of
MPB (Evacuation Center) at Barangay La Purisima
Nuevo, Ocampo, Camarines Sur
9. RICCI MARK I. LAURENTE 5:00PM - 8:00PM October 14-17, 2024 16% preparation of DED Plans Architectural (Spot
Details, Elevations & Sections), for the Construction of
Architect I Multi Purpose Building , Paolbo Calabanga Camarines
Sur
JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.
The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section