0% found this document useful (0 votes)
34 views10 pages

DPWH Overtime Request for October 2024

Uploaded by

MakkMortega
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views10 pages

DPWH Overtime Request for October 2024

Uploaded by

MakkMortega
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

REQUEST FOR AUTHORITY TO RENDER

Department of Public Works and Highways


OVERTIME SERVICES (WEEKDAYS)

OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: September 30 to October 03, 2024

REST DAY/ HOLIDAY


NAME DATE EXPECTED OUTPUT INDICATOR ACTUAL OUTPUT SIGNATURE
SCHEDULE

1. MA. JOSEFINA D. LUISTRO 5:00PM - 8:00PM September 30 to 82% Preparation of Detailed plans for the Construction
Architect I October 03, 2024 of Multi-Purpose Building at Naga City (FINAL SITE -
Brgy. Balatas, Naga City)

2. LIANNE GRACE A. BRITON 5:00PM - 7:00PM September 30 to 40% Preparation of POW/ DUPA of the Construction/
Architect I October 03, 2024 Completion of Multi-Purpose Building (Rural Health
Unit), Barangay San Isidro, Magarao, Camarines Sur

3. MARK A. MORTEGA 5:00PM - 7:00PM September 30 to 85% Preparation of architectural plans for the
Architect I October 03, 2024 construction of three (3) storey nine (9) classroom,
school building,-CY 2024 Deped BEFF batch 1- new
construction) san jose, pili national high school, pili
camarines sur (for final DED plans)

4. JAYVEE DC. BOJOCAN 5:00PM - 7:00PM September 30 to 45% Preparation of Program of Works (with revisions)
for the Proposed Construction of Multi-Purpose Building
Architect I October 03, 2024 at Brgy. Carolina, Naga City, Camarines Sur

5. WENDELL WILLIAM S. QUINIANO 5:00PM - 8:00PM September 30 to 60% Preparation of POW and QTO of Improvement of
Architect I October 03, 2024 DPWH 3RD DEO Building, (Covered Roof Deck) at Baras,
Canaman, Camarines Sur

6. ANGELI GRANADA 5:00PM - 7:00PM September 30 to 55% Preparation of QTO,DUPA & POW of the
Architect I October 03, 2024 Construction of Multi-Purpose Building (Bureau of Fire
Protection), Brgy. Carolina, Naga City, Camarines Sur

7. YOBERT P. BAÑAGA 5:00PM - 7:00PM September 30 to 95% preparation of initial plans from the validation of
Architect I October 03, 2024 MPB (Evacuation Center) at Barangay La Purisima
Nuevo, Ocampo, Camarines Sur

8. VENESSE SOFIA R. LUCERO September 30 to 35% Drafted DED Plan and QTO for construction of MBP
Architect I 5:00PM - 7:00PM October 03, 2024 located at Paolbo, Calabanga, Camarines Sur

9. ALJO P. BELMES 5:00PM - 7:00PM September 30 to 75% Preparation of DED PLANS, POW, DUPA & QTO for
Architect I October 03, 2024 the PROPOSE CONSTRUCTION OF MPB at Barangay Del
Rosario, Naga City, Camarines Sur

10. MARK ANTHONY B. DIVINASFLORES 5:00PM - 07:00PM September 30 to 45% Preparation of DED Plans for the construction of
Architect I October 03, 2024 Multi-Purpose Building (Bureau of Fire Protection). Brgy.
Carolina, Naga City, Camarines Sur

11. MICHAEL ANGELO L. OSEA 5:00PM - 07:00PM September 23-26, 2024 60% Prepared BP 344 Quarterly Report for September
Engineer I 2024

12. REYNAN C. EBUENGA 5:00PM - 7:00PM September 09-12, 2024 70% Preparation of Structural Analysis of Multi-Purpose
Engineer I Building located at Barangay Carolina, Naga City

12. RICCI MARK I. LAURENTE 5:00PM - 7:00PM September 30 to 16% preparation of DED Plans & QTO for the
Construction of MPB PHASE II, Tabuco Naga City,
Architect I October 03, 2024 Camarines Sur,

JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.

The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section

RONELO D. DOLOR ROMEO D. DOLOIRAS ROMEO D. DOLOIRAS


Chief, Planning and Design Section District Engineer District Engineer
Date: Date: Date:
Note: To be filled/accomplished once the OT services for the above-indicated period have been rendered.
To be signed by the Division Chief/District Engineer concerned in concurrence with the "actual output" submitted.
REQUEST FOR AUTHORITY TO RENDER
Department of Public Works and Highways
OVERTIME SERVICES (SATURDAY)

OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 5, 2024

REST DAY/ HOLIDAY


NAME DATE EXPECTED OUTPUT INDICATOR ACTUAL OUTPUT SIGNATURE
SCHEDULE

1. MA. JOSEFINA D. LUISTRO 8:00AM - 5:00PM October 5, 2024 92% Preparation of Detailed plans for the Construction
Architect I of Multi-Purpose Building at Naga City (FINAL SITE -
Brgy. Balatas, Naga City)

2. LIANNE GRACE A. BRITON 8:00AM - 5:00PM October 5, 2024 70% Preparation of POW/ DUPA/ ABC of the
Architect I Construction of Multi-Purpose Building (Rural Health
Unit), Barangay San Isidro, Magarao, Camarines Sur

3. JAYVEE DC. BOJOCAN 8:00AM - 5:00PM October 5, 2024 48% Preparation of Program of Works (with revisions)
for the Proposed Construction of Multi-Purpose Building
Architect I at Brgy. Carolina, Naga City, Camarines Sur

4. ANGELI GRANADA 8:00AM - 5:00PM October 5, 2024 55% Preparation of Revised QTO (Structural Design) of
Architect I the Construction of Multi-Purpose Building (Bureau of
Fire Protection), Brgy. Carolina, Naga City, Camarines
Sur

5. VENESSE SOFIA R. LUCERO 1:00PM - 5:00PM October 5, 2024 40% Prepared POW, DUPA and updated the price of
Architect I materials as per new CMPD for Construction of MPB
located at Paolbo, Calabanga, Camarines Sur
6. JOHN MICHAEL B. DE VERA 8:00AM - 5:00PM October 5, 2024 80% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur,

7. MARK ANTHONY B. DIVINASFLORES 8:00AM - 5:00PM October 5, 2024 60% Preparation of Preliminary Structural Plans for the
Architect I construction of Multi-Purpose Building (Bureau of Fire
Protection). Brgy. Carolina, Naga City, Camarines Sur

JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.

The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section

RONELO D. DOLOR ROMEO D. DOLOIRAS ROMEO D. DOLOIRAS


Chief, Planning and Design Section District Engineer District Engineer
Date: Date: Date:
Note: To be filled/accomplished once the OT services for the above-indicated period have been rendered.
To be signed by the Division Chief/District Engineer concerned in concurrence with the "actual output" submitted.
REQUEST FOR AUTHORITY TO RENDER
Department of Public Works and Highways
OVERTIME SERVICES (WEEKDAYS)

OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 7 - October 10, 2024

REST DAY/ HOLIDAY


NAME DATE EXPECTED OUTPUT INDICATOR ACTUAL OUTPUT SIGNATURE
SCHEDULE

1. MA. JOSEFINA D. LUISTRO 5:00PM - 7:00/8:00PM October 7-8, 2024 98% Preparation of Detailed plans for the Construction
Architect I of Multi-Purpose Building at Naga City (FINAL SITE -
Brgy. Balatas, Naga City)

2. LIANNE GRACE A. BRITON 5:00PM - 7:00PM October 7-10, 2024 90% Preparation of POW/ DUPA/ ABC of the
Architect I Construction of Multi-Purpose Building (Rural Health
Unit), Barangay San Isidro, Magarao, Camarines Sur

3. MARK A. MORTEGA 5:00PM - 7:00PM October 7-10, 2024 15% Preparation of architectural plans (floor plans,
Architect I elevations, sections) for the construction of DPWH
Camarines sur 3rd DEO materials testing laboratory and
maintenance building, canaman camarines sur

4. JAYVEE DC. BOJOCAN 5:00PM - 7:00PM October 7-10, 2024 70% Preparation of Program of Works (with revisions)
for the Proposed Construction of Multi-Purpose Building
Architect I at Brgy. Carolina, Naga City, Camarines Sur

5. WENDELL WILLIAM S. QUINIANO 5:00PM - 8:00PM October 7-10, 2024 70% Preparation of Revision of Architectural and
Architect I Electrical DED plans of Improvement of DPWH 3RD DEO
Building, (Covered Roof Deck) at Baras, Canaman,
Camarines Sur

6. ANGELI GRANADA 5:00PM - 7:00/8:00PM October 7-10, 2024 60% Preparation of Revised QTO (Structural Design &
Architect I Architectural Finishes) of the Construction of Multi-
Purpose Building (Bureau of Fire Protection), Brgy.
Carolina, Naga City, Camarines Sur

7. VENESSE SOFIA R. LUCERO 50% Prepared POW and DUPA for the revised plan of
Architect I Construction of MPB located at Paolbo, Calabanga,
5:00PM - 7:00PM October 7-10, 2024 Camarines Sur

8. MARK ANTHONY B. DIVINASFLORES 5:00PM - 07:00PM October 7-10, 2024 45% Preparation of Preliminary Plans for Revision for
Architect I the construction of Multi-Purpose Building (Bureau of
Fire Protection). Brgy. Carolina, Naga City, Camarines
Sur
9. RICCI MARK I. LAURENTE 5:00PM - 8:00PM October 7-10, 2024 10% preparation of DED Plans Architectural (Spot
Details, Elevations & Sections), Structural (Schedule of
Architect I Beams & Columns) for the Construction of Multi
Purpose Building , Paolbo Calabanga Camarines Sur,

10. JOHN MICHAEL B. DE VERA 5:00PM - 7:00PM October 7-10, 2024 90% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur,

JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.

The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section

RONELO D. DOLOR ROMEO D. DOLOIRAS ROMEO D. DOLOIRAS


Chief, Planning and Design Section District Engineer District Engineer
Date: Date: Date:
Note: To be filled/accomplished once the OT services for the above-indicated period have been rendered.
To be signed by the Division Chief/District Engineer concerned in concurrence with the "actual output" submitted.
REQUEST FOR AUTHORITY TO RENDER
Department of Public Works and Highways
OVERTIME SERVICES (SATURDAY)

OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 12, 2024

REST DAY/ HOLIDAY


NAME DATE EXPECTED OUTPUT INDICATOR ACTUAL OUTPUT SIGNATURE
SCHEDULE

1. LIANNE GRACE A. BRITON 8:00AM - 5:00PM October 12, 2024 80% Preparation of DED Plans of the Construction of
Architect I Multi-Purpose Building (Rural Health Unit), Barangay
San Isidro, Magarao, Camarines Sur

2. MARK A. MORTEGA 8:00AM - 5:00PM October 12, 2024 25% Preparation of architectural plans (reflected ceiling
Architect I plans, ceiling framing plans, bay sections and details)
for the construction of DPWH Camarines sur 3rd DEO
materials testing laboratory and maintenance building,
canaman camarines sur

3. WENDELL WILLIAM S. QUINIANO 8:00AM - 5:00PM October 12, 2024 80% Preparation of Revision of Architectural and
Architect I Electrical DED plans of Improvement of DPWH 3RD DEO
Building, (Covered Roof Deck) at Baras, Canaman,
Camarines Sur

4. ANGELI GRANADA 8:00AM - 5:00PM October 12, 2024 65% Preparation of Revised QTO (Architectural Finishes)
Architect I of the Construction of Multi-Purpose Building (Bureau of
Fire Protection), Brgy. Carolina, Naga City, Camarines
Sur

7. YOBERT P. BAÑAGA 5:00PM - 7:00PM August 27-29, 2024 50% preparation of initial plans from the validation of
Architect I MPB (Evacuation Center) at Barangay La Purisima
Nuevo, Ocampo, Camarines Sur

5. VENESSE SOFIA R. LUCERO 8:00AM - 5:00PM October 12, 2024 55% Prepared POW and ABC of the Final Plan for
Architect I Construction of MPB located at Paolbo, Calabanga,
Camarines Sur

6. JOHN MICHAEL B. DE VERA 8:00AM - 5:00PM October 12, 2024 95% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur

7. ALJO P. BELMES 8:00AM - 5:00PM September 14, 2024


Architect I

7. MARK ANTHONY B. DIVINASFLORES 8:00AM - 5:00PM October 6, 2024 20% Preparation of DED Plans for the construction of
Architect I Multi-Purpose Building (Bureau of Fire Protection). Brgy.
Carolina, Naga City, Camarines Sur
7. MICHAEL ANGELO L. OSEA 8:00AM - 5:00PM October 12, 2024 70% Preparation of Revised Structural Analysis and
Engineer I Design of MPB at Paolbo, Calabanga

8. RICCI MARK I. LAURENTE 8:00AM - 5:00PM October 12, 2024 13% preparation of DED Plans Architectural (Spot
Details, Elevations & Sections), for the Construction of
Architect I Multi Purpose Building , Paolbo Calabanga Camarines
Sur
JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.

The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section

RONELO D. DOLOR ROMEO D. DOLOIRAS ROMEO D. DOLOIRAS


Chief, Planning and Design Section District Engineer District Engineer
Date: Date: Date:
Note: To be filled/accomplished once the OT services for the above-indicated period have been rendered.
To be signed by the Division Chief/District Engineer concerned in concurrence with the "actual output" submitted.
REQUEST FOR AUTHORITY TO RENDER
Department of Public Works and Highways
OVERTIME SERVICES (WEEKDAYS)

OFFICE: Planning and Design Section - Building Unit PERIOD COVERED: October 14 - October 17, 2024

REST DAY/ HOLIDAY


NAME DATE EXPECTED OUTPUT INDICATOR ACTUAL OUTPUT SIGNATURE
SCHEDULE

1. MA. JOSEFINA D. LUISTRO 5:00PM - 7:00/8:00PM October 14-17, 2024 10% Preparation of preliminary plans for the
Architect I Construction/Improvement of MPB (Market) at Brgy.
Poblacion Central, Ocampo, Camarines Sur

2. LIANNE GRACE A. BRITON 5:00PM - 7:00PM October 14-17, 2024 90% Preparation of DED Plans of the Construction of
Architect I Multi-Purpose Building (Rural Health Unit), Barangay
San Isidro, Magarao, Camarines Sur

3. MARK A. MORTEGA 5:00PM - 7:00PM October 14-17, 2024 35% Preparation of architectural plans (schedule of
Architect I doors/ windows and details) for the construction of
DPWH Camarines sur 3rd DEO materials testing lab and
maintenance bldg, canaman camarines sur

4. JAYVEE DC. BOJOCAN 5:00PM - 7:00PM October 14-17, 2024 90% Preparation of POW (with revisions) for the
Proposed Construction of Multi-Purpose Building at
Architect I Brgy. Carolina, Naga City, Camarines Sur

5. WENDELL WILLIAM S. QUINIANO 5:00PM - 8:00PM October 14-17, 2024 90% Preparation of Revision of Architectural, Electrical,
Architect I and Electronics DED plans of Improvement of DPWH
3RD DEO Building, (Covered Roof Deck) at Baras,
Canaman, Camarines Sur

6. ANGELI GRANADA 5:00PM - 7:00PM October 14-17, 2024 70% Preparation of Revised QTO,DUPA & POW of the
Architect I Construction of Multi-Purpose Building (Bureau of Fire
Protection), Brgy. Carolina, Naga City, Camarines Sur

7. VENESSE SOFIA R. LUCERO 70% Prepared POW, ABC and BOQ for final of the
Architect I Construction of MPB located at Paolbo, Calabanga,
5:00PM - 7:00PM October 14-17, 2024 Camarines Sur

8. MARK ANTHONY B. DIVINASFLORES 5:00PM - 07:00PM October 14-17, 2024 48% Prep. of Prelim Plans for Revision for the
Architect I construction of MPB (Bureau of Fire Protection). Brgy.
Carolina, Naga City, Camarines Sur

9. JOHN MICHAEL B. DE VERA 5:00PM - 07:00PM October 14-17, 2024 95% preparation of DED Plans & Program of Proposed
Architect I Construction of MPB @ San Roque, Bombon, Camarines
Sur

10. ALJO P. BELMES 5:00PM - 7:00PM October 14-17, 2024 95% Preparation of DED PLANS, POW, DUPA & QTO for
Architect I the PROPOSE CONSTRUCTION OF MPB at Barangay Del
Rosario, Naga City, Camarines Sur

11.YOBERT P. BAÑAGA 5:00PM - 7:00PM October 14-17, 2024 95% preparation of initial plans from the validation of
MPB (Evacuation Center) at Barangay La Purisima
Architect I Nuevo, Ocampo, Camarines Sur
95% preparation of initial plans from the validation of
MPB (Evacuation Center) at Barangay La Purisima
Nuevo, Ocampo, Camarines Sur
9. RICCI MARK I. LAURENTE 5:00PM - 8:00PM October 14-17, 2024 16% preparation of DED Plans Architectural (Spot
Details, Elevations & Sections), for the Construction of
Architect I Multi Purpose Building , Paolbo Calabanga Camarines
Sur

JUSTIFICATION(S): Subject to the condition that the general guidelines in the rendition of overtime services stipulated under D.O. 03 s. 2024 are met.

The above-mentioned tasks cannot be accomplished during regular office hours due to voluminous Conforme: RONELO D. DOLOR
workload. Chief, Planning and Design Section

RONELO D. DOLOR ROMEO D. DOLOIRAS ROMEO D. DOLOIRAS


Chief, Planning and Design Section District Engineer District Engineer
Date: Date: Date:
Note: To be filled/accomplished once the OT services for the above-indicated period have been rendered.
To be signed by the Division Chief/District Engineer concerned in concurrence with the "actual output" submitted.

You might also like