WEEKLY PREVENTIVE MAINTENANCE CHECKLIST                                                                             Doc. No.: GSE/Weekly/Oct. 24 Date.
                                                                                                                  Required Values/    Observed Values/
   Sr. No.                                         Check Point Details                              Frequency                                            Present Status                          Remark
                                                                                                                       Status              Status
                                                                                                                    PV Field
        1        Visually inspect for the dirt on modules surface. Clean If necessary.              Weekly             clean
        2        Whether the PV Module glass is broken or not.                                      Weekly          not broken
        3        Street light checking ( PV Plant Area)                                             Fortnight        working
        4        Water Pump & pipeline Checking                                                     Fortnight   working, No leakage
        5        Diesel generator check                                                             Fortnight        working
        6        Module Cleaning check                                                              Fortnight          clean
                                                                                                                      SMB
        7        String current check,SMB cable termination                                         Fortnight        working
        8        Module Power Characteristics Checking                                              Fortnight        working
                                                                                                                  Control room
                 Cleanness of Switch room / cable chamber Cleanness of Control room, door,           Weekly
        9                                                                                                              clean
                 window, Insulation Mat.
                 Check that all the doors, fluorescent lights, CFL Lamps, power points are in        Weekly
     10          good working condition.                                                                             working
                 Check for any unusual smell and abnormal hissing sound from the                     Weekly
     11                                                                                                               normal
                 switchboard
     12          Cable trench checking & cleaning                                                   Fortnight          clean
     13          Sectionwise tools verification                                                     Fortnight       maintain
                                                                                                                    HT Yard
                 Observe for normal operation / noise. If any abnormality observed,                  Weekly          normal
     14
                 take necessary action / report to Concern Person.
     15          Transformer visual checking,Yard Cleaning                                           Weekly       working, clean
     16          VCB/CR Panel Checking ,CT checking ,PT checking                                    Fortnight        working
     17          Lighting arrestor check,Street light checking ( HT Yard)                           Fortnight        working
                                                                                                                    Inverter
                 Visually inspect for the dirt & insects inside the cabinet. If necessary clean &
     18                                                                                              Weekly            clean
                 eliminate the reason
     19          Clean the surfaces of the inverter room interior & exterior                        Weekly             clean
     20          PV inverter filter cleaning                                                         Weekly             clean
                                                                                                                Control Room/CSS
     21          Exhaust/ fresh air fan checking, Exhaust duct checking                             Fortnight          clean
     22          Fire alarm check,CCTV camera                                                        Weekly          working
     23          LT Switch Board Maintenance                                                        Fortnight        working
     24          Air conditioner filter cleaning                                                     Weekly            clean
     25          First aid Box check                                                                Fortnight        maintain
                                                                                                                    LT Panel
     26          Check the status of MFM                                                             Weekly          working
     27          LT/Trafo panel filter cleaning                                                      Weekly
                                                                                                                       UPS
     28          Cleanness of UPS & batteries                                                       Weekly             clean
     29          Check whether any unusual smell and abnormal hissing sound from the UPS            Weekly            normal
     30          Visual check the burn mark on the battery terminals.                               Weekly            normal
     31          Check all Indicators & Display Operation                                            Weekly          working
     32          AC Input Voltage(Volt)                                                              Weekly            230 V
     33          DC Input Voltage(Volt)                                                              Weekly        72/96/200 V
     34          AC Output Voltage(Volt)                                                             Weekly            230 V
     35          AC Input Current(Amp)                                                               Weekly
     36          DC Input Current(Amp)                                                               Weekly
     37          AC Output Current(Amp)                                                              Weekly
     38          Neutral to Ground Voltage                                                           Weekly             0V
     39          Frequency(Hz)                                                                       Weekly            50 HZ
     40          Charging current.(Amp)                                                              Weekly
     41          Temperature                                                                         Weekly           < 45° C
                                                                                                                     SCADA
     42          Desktop maintenance                                                                 Weekly
     43          RTU Maintenance                                                                    Fortnight
     44          OFC checking                                                                       Fortnight
                                                                                                                    Structure
     45          Structure Earthing link checkup                                                    Fortnight     connected, tight
Prepared By:-                                                                                                                         Checked By:-                                Approved By:
Name:                                                                                                                  Name:                                              Name:
Signature:   `                                                                                                       Signature:                                     Signature:
Date:                                                                                                                  Date:                                              Date: