Wheat and oil seed Production Enterprise
PROMOTER:- Mr.WERKU ABEBE BORGA
LOCATION:- EAST BALE GOLOLCHA WOREDA
  1|P age   project proposal developed for desert wheat
                   Wheat and oil seed Production Enterprise
       Table of Contents
  CHAPTER ONE ......................................................................................................................................... 7
  A.     Executive Summary ......................................................................................................................... 7
  B.     The vision and mission statement of the project ....................................................................... 7
  C.     Background information of the project ....................................................................................... 7
  1.     Background of the project ............................................................................................................. 8
  1.1.      Objectives of the project .......................................................................................................... 9
  1.2.      key to success/ opportunities .................................................................................................. 10
  1.3.      Present status of the project.................................................................................................. 10
  1.4.      Strategic opportunities ............................................................................................................ 11
  1.5.      Business strategies.................................................................................................................... 11
  1.6.      Expected Benefits ..................................................................................................................... 11
  1.7.      Main Component of the Project ............................................................................................... 12
Table 1 main component to be implemented during project operation ............................................. 12
  1.8.      Management and Organizational Set up ................................................................................. 15
  1.9.      Study of the Project Area ....................................................................................................... 15
  Chapter two ............................................................................................................................................ 17
  2.     Company analysis, legality and physical condition of the farm ............................................... 17
  2.1.      Legal structure of;..................................................................................................................... 17
  2.2.      Business Name and Address..................................................................................................... 17
  2.3.      Project site ................................................................................................................................. 17
  2.4.      Land Ownership (lease, rent, etc) ........................................................................................... 17
  2.5.      Physical and Natural Condition of the project Site ............................................................. 18
  2.5.1.        Climate ..................................................................................................................................... 18
2|P age              project proposal developed for desert wheat
                    Wheat and oil seed Production Enterprise
   2.5.2.        Rainfall ..................................................................................................................................... 18
   2.5.3.        Soil ............................................................................................................................................ 18
   2.6.      Infrastructure condition of the project area....................................................................... 18
   2.6.1.        Communication: ....................................................................................................................... 18
   2.6.2.        Road: ......................................................................................................................................... 18
   2.6.3.        Health centre’s; ...................................................................................................................... 18
   2.6.4.        Financial institution; .............................................................................................................. 19
   Chapter three ........................................................................................................................................ 20
   3.     Marketing Analysis of the project.............................................................................................. 20
   3.1.      Demand Analysis......................................................................................................................... 20
   3.1.1.        Market System Analysis; ...................................................................................................... 20
   3.1.2.        Market segmentation............................................................................................................. 20
   3.1.3.        Risk Analysis ........................................................................................................................... 21
   3.1.4.        Risk management systems..................................................................................................... 21
   3.1.5.        Distribution channels ............................................................................................................. 21
   3.2.      Pricing techniques ...................................................................................................................... 21
   3.3.      Promotional and advertising ..................................................................................................... 22
   CHAPTER 4 ............................................................................................................................................. 23
   4.     ORGANIZATIONAL PROFILE (MANAGEMENT TEAM) ....................................................... 23
   4.1.      Structure of the project which could show level status..................................................... 23
   4.2.      Skilled and unskilled manpower ................................................................................................ 23
Table 2 human resource requirement .................................................................................................... 24
   CHAPTER FIVE ...................................................................................................................................... 24
   5.     Production Process......................................................................................................................... 24
   5.1.      Land Clearing; ............................................................................................................................. 25
3|P age               project proposal developed for desert wheat
                    Wheat and oil seed Production Enterprise
   5.2.       Grubbing; ..................................................................................................................................... 25
   5.3.       Leveling; ....................................................................................................................................... 25
   5.4.       Land Preparation & Sowing ....................................................................................................... 25
   5.5.       Fertilization ................................................................................................................................ 26
   5.6.       Weeding ....................................................................................................................................... 26
   5.7.       Disease & Pest Control .............................................................................................................. 26
   5.8.       Harvesting and Threshing......................................................................................................... 26
   5.9.       Environmental Impact Mitigation ............................................................................................ 27
   5.10.         Crop Rotation: ......................................................................................................................... 27
   5.11.         Soil Fertility: .......................................................................................................................... 27
   5.12.         Soil Sanitation: ....................................................................................................................... 27
   5.13.         Protection of Water Bodies ................................................................................................. 28
   5.14.         Land Management ................................................................................................................... 28
   5.15.         Management of Vulnerable Areas ....................................................................................... 28
   CHAPTER SIX........................................................................................................................................ 29
   6.      Socio-economic Analysis ............................................................................................................... 29
   6.1.       Social Analysis ............................................................................................................................ 29
   6.2.       Market Analysis ......................................................................................................................... 29
   6.3.       Profitability ................................................................................................................................ 30
   CHAPTER SEVEN .................................................................................................................................. 32
   7.      Farming Program, plan, and revenue estimation ........................................................................ 32
   7.1.       Farming Program of the project .............................................................................................. 32
Table 3 Farming program ......................................................................................................................... 32
   7.2.       Production Plan and estimated yield........................................................................................ 32
Table 4 production plan and estimation of revenue for each product.............................................. 33
4|P age               project proposal developed for desert wheat
                    Wheat and oil seed Production Enterprise
   7.3.      Summary of revenue .................................................................................................................. 34
Table 5 summery Revenue........................................................................................................................ 34
   CHAPETER EIGHT ................................................................................................................................ 35
   8.     Financial Analysis ........................................................................................................................... 35
   8.1.      Source of Fund ........................................................................................................................... 35
   8.2.      Total Investment ....................................................................................................................... 35
Table 6: Total investment cost ............................................................................................................... 35
   8.3.      Financing structure.................................................................................................................... 36
Table 7 Financing structure .................................................................................................................... 36
   8.4.      Depreciation & amortization .................................................................................................... 37
Table 8 Depreciation & amortization ..................................................................................................... 37
   8.5.      Fixed Asset Investment ........................................................................................................... 38
Table 9 Estimated Fixed Investment cost of the Project ................................................................. 38
   8.6.      Loan requirement and repayment schedule............................................................................ 38
Table 10 Repayment schedule ................................................................................................................. 38
   8.7.      Project cost estimation............................................................................................................. 39
Table 11 project cost estimation ............................................................................................................ 39
   8.8.      Project Cash Flow ...................................................................................................................... 42
Table 12 Project Cash Flow...................................................................................................................... 42
   8.9.      Project Income Statement....................................................................................................... 42
Table 13 Project Income Statement...................................................................................................... 42
   CHAPTER NINE..................................................................................................................................... 43
   9.1.      Challenges & Opportunities ...................................................................................................... 43
   9.2.      Monitoring & Evaluation (M & E) .............................................................................................. 43
   9.3.      Parameters for M & E ............................................................................................................... 44
5|P age              project proposal developed for desert wheat
                  Wheat and oil seed Production Enterprise
   9.4.     Conclusion .................................................................................................................................... 44
Content of tables
Table 1 main component to be implemented .................................................................................. 12
Table 2 human resource requirement ............................................................................................. 24
Table 3 Farming program .................................................................................................................... 32
Table 4 production plan and estimation of revenue for each product .................................. 33
Table 5 summery Revenue................................................................................................................... 34
Table 6: Total investment cost ......................................................................................................... 35
Table 7 Financing structure ............................................................................................................... 36
Table 8 Depreciation & amortization .............................................................................................. 37
Table 9 Estimated Fixed Investment cost of the Project ...................................................... 38
Table 10 Repayment schedule............................................................................................................ 38
Table 11 project cost estimation ...................................................................................................... 39
Table 12 Project Cash Flow ................................................................................................................ 42
Table 13 Project Income Statement ............................................................................................... 42
6|P age             project proposal developed for desert wheat
           Wheat and oil seed Production Enterprise
CHAPTER ONE
   A. Executive Summary
MR. Wheat AND OIL SEED Production Enterprise ; formed for lease of 200 hectares
of land for its agricultural project. The project mainly focuses on the area of producing
wheat and cotton. The farm will create job opportunities for 52 permanent and more
than 200 temporary persons. The total capital requirement for to the farm will be
estimated For implementing this project a total of 34,000,000.00 Eth birr is required.
From this 30% or 10,200,000.00 birr will be owner’s contribution while the rest 70%
or, 23,800,000.00 Eth birr will be covered by bank loan
   B. The vision and mission statement of the project
Vision:- To be the main and competitive seed producer and supplier as well as wheat crop
producer and supplier company in the region, there by empowering the local community
with modern farm business, agricultural technologies, to enhance their farmproduction.
Beyond this the enterprises participate in social infrastructure development of kebele
and woreda levels.
Mission: - Produce and supply high quality cash crops to the local markets and
international markets.
   C. Background information of the project
   Name                  Mr. Werku Abebe Wheat and oil seed Production Enterprise
   Project Address
           o Region       Oromia Regional state
           o Zone         EAST BALE zone,
           o Woreda       Gololcha Woreda
           o Kebele       will be stated in future
7|P age     project proposal developed for desert wheat
            Wheat and oil seed Production Enterprise
   Type of project        integrated farm
   Total area             200 hr
   Initial capital        34,000,000Birr
   1. Background of the project
This is the business plan for activation and operation of legal project of Mr.Werku
Abebe     Wheat and oil seed     Production farm. It purposes to function as domestic
investor in our country. This document is prepared by the founder of the enterprise.
The exciting economy strategy and concentration of the governments is to enhance the
food security as well as utilize the resources of the country to improve the living
condition of the citizen, by promoting the investment opportunity to domestic investor
as well as foreign investment by providing different type of incentives promised overall
economic climates.
The founder of the project propose to be beneficiary by current economy police and to
take to project as citizen of the country by rebuilding the country economy and hope to
bring change by utilizing the resource with technology in establishing modern farm. As
modern business, the ultimate purpose is operating this project at the profit.
Management at this project will pursue sound, will define policies and execute as an
effective and efficient marketing plan that will optimize profitability.
The major economic importance, farming is typically undertaken by subsistence farmers
on small plots of land. The generally luck capital, proper tools, good economic police,
integration with finance organization like banks and have little or no access to outside
market and technology. Thus, large scale farming and production are still conspicuously
8|P age      project proposal developed for desert wheat
           Wheat and oil seed Production Enterprise
elusive to our country agro-industry, and the advantages they bring are
9|P age     project proposal developed for desert wheat
                Wheat and oil seed Production Enterprise
 not being realized. adequate infusions of capital and injections of vitalizing technology,
 this industry that represents the heart of our economic structure will continuous at it
 slow rate of development. As the life’s blood of socio economic development, agriculture
 must be nurtured on a scale not seen before and rewards that follow must be dispersed
 to the benefits of the larger rural populations.
 Hence, there is an evident needed to promote farm development, improve the condition
 of rural poor, and the overall economy of this land. There for, it is necessary to increase
 the quantity and quality of food in the country, to create employments, to generate
 foreign exchange, and to introduce modernizing technologies. In an effort of fulfill these
 needs, Mr Wheat and oil seed Production is established with clear view of its in place
 in society within which it will operate. It embraces its moral responsibility to help this
 fertile land nourish to our people.
Mr.Werku Abebe         Wheat oil seed Production: formed for leasing 31 hectares ofland
for its agricultural project. The company will produce wheat, wheat and cotton and others
in all the request land.
     1.1. Objectives of the project
 We are by providence placed in a position to provide an oil product specially wheat to the
 world market and onion to the local.
 In short terms:
          safe and clear the designated farm land,
          make permanent residence farm house buildings,
          acquisitions seeds,
          acquire transport and equipment,
 10 | P a g e   project proposal developed for desert wheat
               Wheat and oil seed Production Enterprise
         target regional markets,
         expands distribution networks to neighboring region
         transfer new technology to the local community/ farmers
In long terms:
         make the permanent farm residence office building,
         purchase additional farm equipment ,
         establish infrastructure ,
         create crop seed multiplication and plant nursery in the site
         expands distribution networks to neighbouring countries
         Generate income for the government in the form of taxation
    1.2. key to success/ opportunities
The key to success/opportunities in the projects are:
         sub_ tropical climate _ it characteristics adequate annual rain fall, temperature
         and fertile soils,
         providing environments conductive to produce agricultural products
         high level of ground water resources deemed suitable for irrigation
         flat topography of the land which is suitable for mechanized farming methods
         the absence of industrial pollutants existing in the soil ,ground water, and air
         around the project site
         conducive political stability around the site currently
    1.3. Present status of the project
Mr.Werku Abebe Wheat and oil seed Production Enterprise; starts its operational
activities immediately after the land is given and approved by the regional government
11 | P a g e   project proposal developed for desert wheat
                 Wheat and oil seed Production Enterprise
and has the plan to finish 31 hectares of the land in five production years.
    1.4. Strategic opportunities
         Resource advantages; - the enterprise will own the sufficient hectares of land
         which is virgin, very fertile land and able to produce different crops. The lease
         of the time is long and the lease cost is also least.
         Marketing strategies:- the enterprise has the following market advantages
         The ever increase of demand of oil seed crops to domestic and international
         market
         The enterprise also rent tractors for farmers by buying additional tractors.
    1.5. Business strategies
      Market lead production; - which is strongly supported by continuous market
      research assessment and analysis demand and supply of the market based on
      existing market situation. The project produces and supplies the oil seeds and cash
      crops by studying the gap of the markets.
      Production based on highest per hectares productivity level; - the enterprise
      will select the type of crops which have high market demand for production and
      ability to produce highest yield per hectare.
      Resources Requirements; - the project required non related and related resource
      to operate the day to day operation of its farm business. Some of this resources
      are;
               Human power both professional and daily labors
               Financial resource
               Raw material such as; improved seeds, fertilizers, sacks, chemicals and etc.
12 | P a g e      project proposal developed for desert wheat
                      Wheat and oil seed Production Enterprise
                    Machineries and equipments such as tractors, hand tools, vehicles etc.
         1.6. Expected Benefits
              Some of the direct financial benefit are;- very progressive, potential and
              attractive profit to the owner. For financial institutions give interest for their
              loan, export earnings for the government and increase domestic market supply,
              the firm provides competitive selling prices of the produced crops.
              Some of the most vital non financial benefits are;- create on farm and off job
              opportunities to the local community, adopting and diffusion of modernfarming
              technologies and inputs, achieve food self sufficient and so on
         1.7. Main Component of the Project
          Table 1 main component to be implemented during project operation
No_      Main component           The activities under the component
         of the project
1)                                 A. Technology transfer for local societies
                                      The project will farm by modern technology and mechanized
                                      way and it will promote for societies.
           Contribution of
                                   B. Infrastructure development
           the Project for
                                      The projects will old road maintaining and constructing new
                societies
                                      road which serve both for the societies and the project.
                                      supporting health post in material and financially
                                      supporting primary school both by material and financially
     13 | P a g e      project proposal developed for desert wheat
                    Wheat and oil seed Production Enterprise
2)                             Environmental protection plan of the project
                               Seedling indigenous plants and distributing for societies
                               The project plan produce indigenous and economically important
                               Develop Environmental Impact Mitigation on the project
            Environmental
                               Soil Sanitation
           protection plan
                               Protect Water Bodies which is in the project
                               Land Management; which is not suitable for mechanized farm
                               forestation ; covering areas in the project by the forest
                               Protecting soil erosion by planting trees
     14 | P a g e   project proposal developed for desert wheat
                    Mengistu Yeshitila Wheat Production Enterprise
                                Using waste material as fertilizer (composting)
3)                              Out growing plan of the project
                                The project plan to develop training center collaborating with
                                government body like Agricultural and rural development bureau,
          Out growing plan
                                specially establishing Farmer Training Center (FTC) in the
                                kebele where the project will established and train the local
                                societies the way they increase productivities in small land
                                (out growing).
4)                              Capacity and commitment
                                To operate the project success fully, owner has the following
                                Loan from bank ------ 23,800,000Birr
                                Owner equity        10,200,000 Birr
                                Total capital       34,000,000birr
                                will purchase farm machinery in the future like;
                                      4 tractors with full machinery
                                      1FSR ISUZU
             Capacity and             1Pick up
              commitment              1Tracker
                                      1 Dozer
                                      1 combiner
                                      1 planter
                                      1 chemical spry machine
                                      1 transport vehicle
                                      2 motor cycle
                                      2 generator
     15 | P a g e    project proposal developed for desert wheat
                    Mengistu Yeshitila Wheat Production Enterprise
5)                              The overall production plan of the project
          The overall           The project will export 70% of the total production output
          production plan       /edible oil/ and it distribute 30% for international and local
                                market respectively.
6)                              The experience of the investor
           The experience       The owner have experience on producing edible oil and also it
           of the investor      will be managed by experts those graduates in Agronomist and
                                other related fields.
7)                              Value adding of plan of the project
                                after the project will be operational and transfer to production
                                the investor plan in two way
                                   Short run plan; in short run the production product will be
          value adding plan
                                    used as raw material for the factory planted in Addis Ababa.
                                    And producing standardized edible oil.
                                   Long run plan; in long run the project will establish Agro
                                    industry and process the product into edible oil which will
                                    be distributed to local and international market.
8)                              The project plans on working environment
                                The project plan to construct shelters for permanent and
          Creating
                                temporary worker
          conducive
                                The project plan to establish health post, restaurant hall,
          working
                                entrainment area for the employees
          environments
                                The project plan to pay attractive salary
                                Practically advising the worker to deposit the salary they earn
     16 | P a g e    project proposal developed for desert wheat
               Wheat Production
    1.8. Management and Organizational Set up
The proposed organizational and managerial set up of the project comprises management
and technical divisions. The project comprises of managerial, production, financial and
administrative divisions. The project manager, Mr.Werku Abebe will serve both as a
manager and contact person. The duty & responsibility of each division is highlighted
below.
General Manager: The general manager manages the entire business. Moreover, he deals
with strategic planning and decision making matters.
Production division:
         is responsible for crop production, supervision and provision of farm inputs and
         outputs,
         conducts regular follow up and evaluation with regard to farm operations,
         supervises the overall operations of the enterprise,
Finance and administration division:
         Works directly under the manager and is responsible to him,
         Consists of different sections that handle a variety of responsibilities,
         Keeps different books of records,
         Prepares periodic financial plans and reports for the manager as well as external
         users &manages the logistics and human resource aspects of the project.
    1.9. Study of the Project Area
Mr.Werku Abebe Wheat            and oil seedProduction Enterprise will be established in
Oromia Regional State, East Bale Zone, Gololcha Woreda, and kebele's will be stated in
17 | P a g e    project proposal developed for desert wheat
               Wheat Production
the future. The project area experiences sub-tropical temperature and lies in low land
agro- climate zone. The area is selected for investment as it satisfies the following
criteria employed by Ethiopian investment authority.
         The area is fully investment site specially for agricultural sector,
         The area is not covered by both forest and animal species of ecological
         importance,
         For the sake of conserving, developing and properly utilizing the woreda’s
         agriculture, Gololcha woreda were suitable for the envisaged purpose in terms of
         environment.
Chapter two
    2. Company analysis, legality and physical condition of the farm
    2.1. Legal structure of; -
Mr.Werku Abebe Wheat Production Enterprise is formed as private limited company
by the Ethiopian citizen. The company will get its legal registration from B/G/regional
state.
    2.2. Business Name and Address:
         The Name of the project;Werku Abebe wheat and oil sedProduction
         The Owner Address;               England London
         Project offices;-                proposed to open in either Addis Ababa town
         Project Address;-         Gololcha woreda
    2.3. Project site
The project site is found in Oromia Regional state East Bale Zone, Golollcha woreda, the
kebele will be stated in the future. The total area of the project is 200 hectares out of
which around 5-7 hectares assumed covered by forest, stone, hill, valley and which not
18 | P a g e    project proposal developed for desert wheat
               Wheat Production
suitable for crop cultivation.
    2.4. Land Ownership (lease, rent, etc)
The land farm obtains from B/G/regional state in either Gololcha woreda. The land
lease from regional government for 25 years for lease rent 154.50 birr per hectares
annually. Once the land is leased, demarcated and handed over by the concernedauthority
to the project, it will carry out different activity like land development, construction and
building, inter farm development etc.
    2.5. Physical and Natural Condition of the project Site
    2.5.1.      Climate
The project areas are categorized sub tropical, hot low land to warm sub humid moist
low land which is kola. The Golocha woreda are district has average minimum temperature
(25, 27 degree celcues).
    2.5.2.      Rainfall
The average annual rainfall of the study area ranges from 1000mm to1600mm.
    2.5.3.      Soil
In Golocha district, the soil would be sandy clay to loamy clay. The texture is clay with
strong angular blocky structure. These soils have the potential to produce different oil
seeds, cereals crops and vegetable like onion and other.
    2.6. Infrastructure condition of the project area
    2.6.1.      Communication:
In regard to communication, the project area is not connected with telephone
connections, but we hope that, the government will plan to expand the telecommunication
19 | P a g e    project proposal developed for desert wheat
               Wheat Production
service to all area in Ethiopia in these five years.
    2.6.2.      Road: -
Golocha woreda’s were connected roads to region capital city bale .
    2.6.3.      Health centre’s;
In Golocha woreda, health post and clinics are constructing and the health service
coverage is increasing gradually. In order to protect the well being/safety of the worker
and the society around the project, an owner of the project is willing to open his own
clinic in the farm site or should ready to afford any medicines before from nearby
government clinic.
    2.6.4.      Financial institution;-
The enterprise can get financial services from commercial bank Golocha .
Chapter three
    3. Marketing Analysis of the project
    3.1. Demand Analysis
Ethiopia demand for grain continued to increase because of the population pressures,
while supply remain short, and largely for increasing the foreign currency especially from
oilseeds and the domestic demand also increase for those crops. Oil seeds are the
second largest foreign currency earning sector of the country next to coffee. Ethiopia
government has also an ambitious plan to boast different factories that require
agricultural product as input. Ethiopia at the moment is also importing huge quantity of
edible which could have been substituted if the local factories weredeveloped. Export
of wheat has grown from year to year. Due to the above point there exists enough
demand for oil seeds and cereals crops both in domestic and international market.
20 | P a g e    project proposal developed for desert wheat
               Wheat Production
    3.1.1.      Market System Analysis;-
  Market situation for oilseeds and cash crops
The indicators of oilseeds market are;-
       The market for oilseeds and cash crops are expending in international market
       Ethiopia being expand its export market destinations through time to time
       Local production improves and the supply of the crop increase
    3.1.2.      Market segmentation
The enterprise has the following market segmentation
       To the government and private organization for industry with Ethiopia commodity
       exchange. ( ECX)
       To whole seller for exporter or domestic market
       To regional and individual customers
    3.1.3.      Risk Analysis
The major anticipated risks of the enterprise will face the following factors
       Absence of rain fall and erratic nature
       Pest and insect migrations
        Crops failure
       Wild fire
       Infrastructure problems, especially water, electric power, road and financial
       institutions
    3.1.4.      Risk management systems
       Doing experiment and research during cultivation periods
21 | P a g e    project proposal developed for desert wheat
               Wheat Production
       The enterprise get insurance for any risks
       Clear the surrounding place to prevent wild fire
       Digging ground water hole in the project site
       Install generator to the project site
       Use chemical and pest acid inputs for the farm
    3.1.5.      Distribution channels
The enterprise use different distribution channels to makes its product available and
accessible to every end user and trader or Ethiopian commodity exchange (ECX) and in
the future plan to export the product for international market.
    3.2. Pricing techniques
The enterprise has several competitive cost advantage and topographic benefit for the
production of different crops. Due to this, the enterprises use the following pricing
techniques.
     Market penetration price technique i.e. set competitive lower price to the product
     to get larger quantities sales volumes
     Quantity discount pricing techniques;- give discount advantages for large quantity
     buyers to achieve advantages.
    3.3. Promotional and advertising
The enterprise uses the following promotional techniques to penetrate market and to
achieve its forecasted sales targets;
       Personal selling promotions; use sales force to present the crops to target
       customer
22 | P a g e    project proposal developed for desert wheat
                    Wheat Production
            Trade fairs and expansions as means of promotions
            Donations and free technological services to the local community.
     CHAPTER 4
         4. ORGANIZATIONAL PROFILE (MANAGEMENT TEAM)
         4.1. Structure of the project which could show level status
     It is structure of the project that shows how day to day operations are organized in
     such a way that could enable to run smoothly the project activities effectively and
     efficiently.
                                           General Manager
     Financial section and admin
     manager
                                                                        Production and technology
                                                                        section manager
   Accountant           General             Driver
   Cashiers              services            Guards        Crop protection             Technology
   Purchaser             officer             Operator      and production              section
   Office                                    cooker
    secretary
         4.2. Skilled and unskilled manpower
     The farm required 52 permanent and more than 200 casual labourers on average for
     23 | P a g e    project proposal developed for desert wheat
               Wheat Production
each production season.
24 | P a g e    project proposal developed for desert wheat
               Wheat Production
      Table 2 human resource requirement
No-      Description                  Qty   Monthly      Total        Total salary
                                            Salary/      salary   per per annual
                                            individual   month
 1.      General manager              1     4,000        4,000        48,000
 2.      Financial section manager    1     3,000        3,000        36,000
 3.      Technology and production 1        3,000        3,000        36,000
         manager
 4.      Accountant                   2     1,500        1,500        18,000
 5.      Casher                       2     1,000        1,000        12,000
 6.      Office secretary             1     700          700          8,400
 7.      General service officer      2     1,000        1,000        12,000
 8.      Driver                       4     1,500        3,000        36,000
 9.      Guard                        4     1,000        2,000        24,000
 10.     Cooker                       4     600          1,200        14,400
         Total                        22                              244,800
25 | P a g e    project proposal developed for desert wheat
               Wheat Production
CHAPTER FIVE
    5. Production Process
As far as production pattern is concerned, the 200 hectare will be proportionally
allocated for different types of production like wheat and others. However, as per the
prevailing market demand and the dynamics of nature, the planned production pattern
will be readjusted.
    5.1. Land Clearing;
Prior to land levelling, removing heavy vegetation growth is advantageous. Clearing land
encompasses removing of some vegetation types such as trees, bushes, trashes and
boulders from the area to be cultivated. This is done either manually or mechanically. As
far as this project is concerned, land clearing shall be carried out both manually and
mechanically.
    5.2. Grubbing;
The process of removing stumps, deep-set stones & old roots as per required. This will
be done by using human labour as well machinery.
    5.3. Leveling;
As mentioned earlier, the project area will be virgin and covered with a variety of
vegetation types. In order to bring the area under cultivation, in the long run, land
clearing & grubbing activities will be carried out in an environmentally friendly manner.
26 | P a g e    project proposal developed for desert wheat
               Wheat Production
    5.4. Land Preparation & Sowing
It is advisable that the preparation of crop fields should be carried out several weeks
prior to planting and as such an activity helps the pre-germination of unwanted or weeds
crops. Otherwise, a delay of the last tillage until the germination of those weeds is
desirable. Appropriate planting dates should be chosen so as to avoid risky environmental
conditions such as delay or extension of rainfall. Planting is recommended after a
thorough preparation of field crops which, in turn, ensures the rapid germination of
seeds as well as crop development. Crop fields should be well ploughed and prepared so
as to ensure proper harrowing and fine filth production. Planting depth should coincide
with common practices of the area in which the project is situated.
 5.5. Fertilization
 The application of fertilizers is to achieve maximum production while considering social,
 economic and environmental factors. Appropriate fertilization depends on soil types,
 environmental conditions and the type of the crop to be produced. The application of
 fertilizers should be on the basis of expertise knowledge and this avoidscontamination
 and environmental pollution.
5.6. Weeding
Proper control of weeds, insect pests and diseases is an integral part of crop production.
Proper weed control is instrumental as it largely facilitates aeration, proper growth of
crops, high yield, and avoids undesirable competition for sunlight, water & minerals. On
the other hand, improper weed control results in undesirable disease and insects which
leads to reduced yield and quality.
27 | P a g e    project proposal developed for desert wheat
               Wheat Production
5.7. Disease & Pest Control
Controlling of both surface and underground insects is important in crop production.
Most underground pests are controlled either by crop treatment or granular insecticides
application. The application of chemicals is essential for controlling insects which feed
particularly the silks, ears and tassels of crops. An integrated pest management program
(IPM), including proper scouting, is recommended. In the same manner, proper disease
control is vital for both quantity and quality crop production. Inaddition, proper disease
control mechanisms avoid the spread of crop borne pathogens. Genetic resistance in
parental lines is preferable but sometimes outstanding lines are susceptible to particular
pathogens present in production fields. In general, the project shares the responsibility
of abandoning the application of the internationally abandoned chemicals.
5.8. Harvesting and Threshing
Late harvesting results in dropping of ears, stalk lodging ear rot development, shelling
of ears and other related negative effects. As a result, harvesting should be done
immediately after maturity when crops form brown layer at the point of attachment with
cobs and the content of moisture is reduced to 20-25%. Harvesting is possible both
manually and mechanically. However, in developing countries like Ethiopia, the former is
more suitable as human labour is abundant and cheap.
    5.9. Environmental Impact Mitigation
Experiences have shown that large scale mechanized agriculture has caused massive
environmental degradation such as deforestation, soil erosion and the like. Environmental
degradation is largely caused by unwise use of natural resources. Vegetative wise, at
present, the project area is mainly covered by savannah vegetation type with flat and
gentler topography. In order to minimize the adverse environmental damages and loss of
28 | P a g e    project proposal developed for desert wheat
               Wheat Production
soil fertility in sustainable manner, crop rotation and wind break mechanisms will be
employed.
5.10. Crop Rotation:
As opposed to the monoculture, crop rotation is a mix of cropping on rotational basis and
has the following merits:
5.11. Soil Fertility:
A rotation of different crops ensures soil fertility for a sustained period of time as
compared to a single crop grown on the same plot year after year. Even though man made
fertilizers like crop residue and compost are believed to be applied immediately after
the commencement of the project, chemical fertilizers such as urea and dap will be
employed as per the demand arises, i.e. when the land loses its virginity and fertilityand
after the approval of agricultural research.
5.12. Soil Sanitation:
Growing the same crop on the same plot continuously accelerates infestation with
diseases, insects and weeds resulting reduction in production and higher cost of
cultivation. A diligent follow up will be carried out in this respect so as to control the
possible adverse effects.
    5.13. Protection of Water Bodies:
 The project gives due emphasis to the protection of water bodies such as rivers &
streams. In doing so, the project moves in accordance with the regional land
administration & uses legal frameworks.
    5.14. Land Management:
In the project area, land management will be ensured by the application of organic
29 | P a g e    project proposal developed for desert wheat
               Wheat Production
fertilizers and other improved agricultural practices. In addition, when the need arises,
the application of chemical fertilizers will be in effect. Nursery practices will also be
undertaken side by side.
    5.15. Management of Vulnerable Areas:
The project gives due emphasis for the protection & conservation of easily vulnerable
areas such as sloppy, swampy and rugged areas. In doing so, such areas, instead ofbeing
cultivated, shall be left out or else managed and protected through terracing, plantation
and other conservation mechanisms.
CHAPTER SIX
    6. Socio-economic Analysis
    6.1. Social Analysis
The area in which the project is located is slightly poor in terms of infrastructural
provision as well as supply of daily labourers. However, the project tries to handle such
setbacks in a hand-in-hand manner with the regional as well as federal government
development Endeavour’s. As far as daily labourers are concerned, the project tries to
employ daily workers from the indigenous community and, if not, fetches from nearby
localities of other regions. Moreover, in addition to the various endeavour’s made by both
the regional & federal governments, transportation problems shall be alleviated by the
project. The farming system of indigenous community is by far traditional and hence the
project contributes much to the improvement of such practices.
    6.2. Market Analysis
According to Ministry of Finance & Economic Development, MoFED, agriculture is the
30 | P a g e    project proposal developed for desert wheat
               Wheat Production
most contributors to GDP. For instance, in 2008/09, agriculture accounted for 42.5%
of the GDP per annum and, the contribution of crop production to GDP was 2%.
Grain production is the mainstay of the rural population as well as the economy of the
state. Commercial crops especially wheat is the 2nd largest export earner for the country
and a great deal of smallholders are involved in its production. The project has planned
to produce both commercial and consumable crops as the demand for both is increasing
at domestic & international markets.
Despite the difficulty of quantifying and determining the exact demand-supply gap in
the agricultural sector, due to an increase in population size, consumption pattern,
income, import-export transactions and other factors, one can easily imagine that
there is unmet demand-supply gap in the sector. Consequently, market wise, the
products of the project of the project are demanded both locally as well as
internationally. From the view point of the nation’s import-export trend, in 2007/08, the
total export value of Ethiopia, driven by high international prices of agricultural
products, grew by 23.7%. According to annual report of NBE, 2007/08, the value of
major agricultural products such as coffee, wheat, flowers, pulses, live animals and chat
has shown an increase of 23.65%, 16.9%, 57.7%, 105.5%, 11.12% and 16.5%,respectively.
An increase in the price of commodities in global markets has resulted in an increase in
the value of exported items. In the same period, the share of major agricultural
products, namely, coffee, wheat, pulses, flowers and chat from the total value of exports
was 35.8%, 14.9%, 7.6% and 7.4%, respectively.
In general, the existing market environment is quite favorable for the sale of farm
produce and purchase of inputs. In both cases the project can have access to local and
national market center of the country. Since the project is located in food deficit area,
31 | P a g e    project proposal developed for desert wheat
               Wheat Production
it has a vital role in stabilizing the price of food crops in the region. Therefore, the
project can sell its produce to market centers of ARSI, Chagni, Bahir Dar, and Addis
Ababa. Moreover, the sale of the produce at nearby markets is profitable even
immediately after harvesting is completed.
    6.3. Profitability
According to the projected income statement, the project will start generating profit in
the first year of operation.   Important ratios such as the percentage of net profit to
total sales, net profit to equity (return on equity) and net profit plus interest to total
investment (return on total investment) will show an increasing trend throughout the
production life of the project. The income statement and other profitability indicators
show that the project is viable. In line with this, the break-even point of theproject is
estimated by using income statement projection as
  BE =          Fixed Cost = 20 %
                Sales – VC
The investment cost and income statement projection are used to project the pay-back
period. The project's initial investment will be fully recovered within 5 years. Based on
the cash flow statement, the calculated IRR of the project is 18 % and the net present
value at 5.4%. As far as the liquidity of the project is concerned, the project is free
from any liquidity problem throughout its life. Sensitivity analysis is among the crucial
elements of project evaluation. In line with this, the project under consideration has
been evaluated from three points of view: if price/benefit decreasesby 10%, its IRR will
be 10%. Similarly, if investment costs are increased by 10%, its IRR will be 13%.
Consequently, the project is feasible even under conditions unfavorable to it.
32 | P a g e    project proposal developed for desert wheat
                    Wheat Production
     CHAPTER SEVEN
         7. Farming Program, plan, and revenue estimation
         7.1. Farming Program of the project
     The project, with full capacity, commenced production in 2024/25 production season.
     In doing so, the project tries to fully develop the estimated 31 hectare of land within 5
     years. Land clearing activities will be accomplished accordingly.
     Table 3 Farming program
No      Type        of Unit      Yield/   Land development And patricianly production plan
        crops                    ha
                                          2024/25    2025/26     2026/27   2026/27    2027/28
1.      Wheat          Quintal   6        16         20          26        29         31
         7.2. Production Plan and estimated yield
     The enterprise has an estimated area of 31 hectare of land and tentatively planned to
     produce a mixture of crops such as Wheat, cotton, Maize, haricot bean, Soya bean, and
     Sorghum. However, as mentioned above, the planned production pattern will be
     readjusted as per the prevailing market demand and the dynamics of nature.
     33 | P a g e    project proposal developed for desert wheat
                 Wheat Production
  Table 4 production plan and estimation of revenue for each product
Crop                      Yr1          Yr2          Yr3          Yr4          Yr5
1. Wheat
Area in Ha                120          200          300          400          600
Yield/Ha/Qt               6            6            6            7            7
Total production in 760                1200         1800         2,800        4,200
Quintal
Price per quintal         2,800        2,800        2,800        3,000        3,000
Revenue                   2,016,000    3,360,000    5,040,000    8,400,000    12,600,000
2. Wheat
Area in Ha                110          170          225          280          280
Yield/Ha/Qt               40           40           45           45           45
Total production in 4,400              6,800        10,125       12,600       12,600
Quintal
Price per quintal         4,500        4,500        4,500        4,500        4,500
Revenue                   19,800,000   30,600,000   45,562,500   56,700,000   56,700,000
3. Cotton
Area in Ha                30           30           75           120          120
Yield/Ha/Qt               15           15           15           15           15
Total production in 450                450          1,125        1800         1800
Quintal
Price per quintal         1,500        1,500        1,500        1,500        1,500
Revenue                   675,000      675,000      1,687,500    2,700,000    2,700,000
4. Irrigation       of
   vegetable         /
   mango,        lemon,
   avocado, orange
  34 | P a g e    project proposal developed for desert wheat
                   Wheat Production Enterprise
     & others
  Area in Ha                 45           50           60           70           80
  Yield/Ha/Qt                120          120          125          125          130
  Total production in
  Quintal                    5,400        6,000        7,500        8,750        10,400
  Price per quintal          1,000        1,000        1,000        1,000        1,000
  Revenue                    5,400,000    6,000,000    7,500,000    8,750,000    10,400,000
  Total            revenue
  production year            10,216,000 13,260,000 18,697,500 25,205,000 31,055,000
    Note: Yield per hectare in quintal estimation is made based on conventional production
    practices. As a result, it is understood that yield per hectare in quintal can either
    increase or decrease depending on the application of modern farming inputs and the
    prevailing rainfall pattern
        7.3. Summary of revenue
    Table 5 summery Revenue
Revenue type                 Yr1          Yr2          Yr3          Yr4           Yr5
Revenue from wheat           2,016,000    3,360,000    5,040,000    8,400,000     12,600,000
Revenue from wheat           19,800,000   30,600,000   45,562,500   56,700,000    56,700,000
Revenue from cotton          675,000      675,000      1,687,500    2,700,000     2,700,000
Revenue from irrigation 5,400,000         6,000,000    7,500,000    8,750,000     10,400,000
Total revenue                27,891,000   40,635,000   59,790,000   76,550,000 82,400,000
    Note: Revenue from each crop is estimated on the basis of current market prices.
    Consequently, such prices are subject to market fluctuations such as inflation and other
    related factors.
    35 | P a g e     project proposal developed for desert wheat
               Wheat Production Enterprise
CHAPETER EIGHT
    8. Financial Analysis
    8.1. Source of Fund
The total investment of the project is estimated to be an Ethiopian Birr 34,000,000birr.
Of which 70% (23,800,000) will be financed by the development Bank of Ethiopia in long
term. The remaining 30% (10,500,000) will be covered by the project owner. Other major
assumptions for financial analysis of the project are summarized hereunder. For the
sake of simplicity and financial analysis purpose, the life time of the project is assumed
to be 5 years. The project bears costs to a number of central facilities to support the
implementation of it. All fixed assets shall be replaced at the end of the expected
economic life based on three respective depreciation rates. A straight line depreciation
method is adopted for cumulative annual depreciation changes.
    8.2. Total Investment
The overall investment required by the project includes fixed asset investment,
production cost, administration cost and working capital, and is estimated to be
34,000,000Ethiopian birr.
Table 6: Total investment cost
Description                       measurement Quantity       Unit price   Total
Land development                  Hectare        1,000       5,000        5,000,000
Pick up vehicle                   No.            1           3,500,000 3,500,000
Motorbike                         No.            2           35,000       70,000
FSR ISUZU                         No.            1           1,500,000    1,500,000
36 | P a g e    project proposal developed for desert wheat
               Wheat Production Enterprise
Generator                         No.          2            45,000      90,000
Tractor with accessories          No.          2            1,400,000   2,800,000
Dozer                             No.          1            2,000,000 2,000,000
Combiner                          No.          1            1,750,000   1,750,000
Planter                           No.          1            1,500,000   1,500,000
Building & construction           Lump sum     -            -           300,000
Office equipment                  Bulk                                  200,000
Infrastructure cost               Bulk                      2,000,000 4,000,000
Working Pre-operating             Bulk                                  11,629,930
Expenditure
                                                                Total 34,000,000
Note: The cost estimations are made based on current market prices. Therefore, they
are not exhaustive and hence they are subject to change due to inflation and related
factors.
    8.3. Financing structure
Table 7 Financing structure
Description                   Equity               Bank loan             Total
                              Amount      %        Amount       %
Land development              1,500,000   30       3,500,000    70       5,000,000
Pick up vehicle               1,050,000   30       2,450,000    70       3,500,000
FSR                           21,000      30       49,000       70       70,000
Motorbike                     450,000     30       1,050,000    70       1,500,000
Generator                     27,000      30       63,000       70       90,000
37 | P a g e    project proposal developed for desert wheat
               Wheat Production Enterprise
Tractor with accessories     840,000      30     1,960,000      70      2,800,000
Dozer                        600,000      30     1,400,000      70      2,000,000
Combiner                     525,000      30     1,225,000      70      1,750,000
Planter                      450,000      30     1,050,000      70      1,500,000
Building & construction      90,000       30     210,000        70      300,000
Office equipment             60,000       30     140,000        70      200,000
Infrastructure cost          1,200,000           2,800,000      70      4,000,000
Working Pre-operating        6,188,979    30     14,440,951     70      20,629,930
expenditure
                             10,500,000          23,800,000             43,339,930
    8.4. Depreciation & amortization
Table 8 Depreciation & amortization
Description                  Cost         Rate                1-5 yr
Land development             1,000,000    20%                 200,000
Pick up vehicle              500,000      20%                 100,000
Tractor with accessories     800,000      10%                 80,000
FSR                          1,000,000    20%                 200,000
Generator                    90,000       10%                 9,000
Building and constructions   300,000      20%                 60,000
Office equipment             200,000      5%                  10,000
Working Pre-operating        1,040,000    2%                  20,800
expenditure
                                                    Total 679,800
38 | P a g e    project proposal developed for desert wheat
               Wheat Production Enterprise
    8.5. Fixed Asset Investment
The major investment items of the project include: Purchase of tractor with accessories,
4wd double pickup, FSR and Purchase of office equipment, Construction ofoffice and
residence.
Table 9 Estimated Fixed Investment cost of the Project
Description                     Quantity     Unit price        Total
Building & construction         Lump sum     300,000           300,000
Tractor with accessories        2            1,400,000         2,800,000
FSR                             1            1,500,000         1,500,000
4wd pickup                      1            3,500,000         3,500,000
Generator                       2            45,000            90,000
Motorbike                       2            35,000            70,000
Office         equipment    & Lump sum       200,000           200,000
Furniture
Total fixed asset investment                                   8,460,000
Note: The cost estimations are made based on current market prices. Therefore, they
are not exhaustive and hence they are subject to change due to inflation and related
factors.
    8.6. Loan requirement and repayment schedule
Table 10 Repayment schedule
Loan amount          Principal repayment   Interest           Out ball
23,800,000                                                    23,800,000
23,800,000           3,033,795.1           3,640,554.1        27,304,155.9
27,304,155.9         3,033,795.1           3,276,498.7        24,270,360.8
39 | P a g e   project proposal developed for desert wheat
               Wheat Production Enterprise
24,270,360.8       3,033,795.1             2,912,443.3           21,236,565.7
21,236,565.7       3,033,795.1             2,548,387.9           18,202,770.6
18,202,770.6       3,033,795.1             2,184,332.5           15,168,975.5
15,168,975.5       3,033,795.1             1,820,277.1           12,135,180.4
12,135,180.4       3,033,795.1             1,456,221.6           9,101,385.3
9,101,385.3        3,033,795.1             1,092,166.2           6,067,590.2
6,067,590.2        3,033,795.1             728,110.8             3,033,795.1
3,033,795.1        3,033,795.1             364,055.4
Note: A term of four years loan repayment period and a grace period of nine months are
taken in to account. Plus, a 9.5% lending rate is taken in to account.
    8.7. Project cost estimation
The cash flow of the project reveals that the project, including its loan, can easily settle
its financial obligation without difficulties. Even if the project shows short of cash in
the first year of operation due to pre-production expenditures, it turns in to liquidity
after the 1st year of operation. Details are shown below.
Table 11 project cost estimation
40 | P a g e   project proposal developed for desert wheat
                                   Wheat Production Enterprise
     Cost items                          Year 1       Year 2     Year 3      Year 4    Year 5
     Seed                                412,400     514,800     618,000    720, 597   823, 597
     Chemicals                           42,000       52,500     62,800      73,250    83,500
     Spare parts                         44,420       110,450    116,725     128,061   139,464
     Wage                                542,000     562,000     572,000    576,000    585,000
     Fuel                                112,500      117,500    122,500    222,500    322,500
     Land rent                           154,500     154,500     154,500   154,500     154,500
     Packing materials                   115,000      117,000    122,000     125,000   130,000
     Salary                              114,000     246,000     244,800    244,800    244,800
     Repair & maintenance                 5,000       14,400     26,970      40,970    50,970
     Insurance                           20,000       20,000     20,000      20,000    20,000
     Office supply                       15,000       30,000     30,000      35,000    40,000
     Oil & lubricant                     140,000     180,000     200,000     212,000   221,000
     Travel &per diem                    10,000       15,000     20,000      20,000    20,000
     Depreciation & amortization         43,313       86,626     129,939    259,878    346,504
     Tractor                            2,400,000    2,400,000   400,000    400,000       -
     4D pick up                         2,750,000        -          -           -         -
41 | P a g e   project proposal developed for desert wheat
                               Wheat Production Enterprise
     Motor bike                           -          35,000           -          35,000        -
     Generator                        250,000        45,000           -             -       45,000
     FSR ISUZU                        1,500,000         -         1,500,000         -      1,000,000
     Dozer                                -         2,000,000         -             -      1,500,000
     Total operational cost        8,670,133      6,700,776     4,340,234     4,046,959   6,226,835
42 | P a g e   project proposal developed for desert wheat
                 Wheat Production Enterprise
        8.8. Project Cash Flow
  Table 12 Project Cash Flow
Description              Yr1              Yr2              Yr3             Yr4            Yr5
Total revenue from
Sales                    27,891,000       40,635,000       59,790,000      76,550,000     82,400,000
Total cost
                         8,670,133        6,700,776        4,340,234       4,046,959      6,226,835
Annual loan payment       3,033,795.1      3,033,795.1      3,033,795.1     3,033,795.1    3,033,795.1
Interest payment          4,004,609.5      4,004,609.5      4,004,609.5     4,004,609.5    4,004,609.5
Revenue before tax         12,182,462      26,895,819       48,411,361      65,464,636     69,134,760
Income tax
                          4,263,861.8      9,413,536.8     16,943,976.5    22,912,622.7    24,197,166.1
        8.9. Project Income Statement
  Table 13 Project Income Statement
Description           Year 1          Year 2           Year 3             Year 4          Year 5
Total revenue         27,891,000        40,635,000       59,790,000       76,550,000      82,400,000
Operating cost         8,670,133        6,700,776        4,340,234         4,046,959      6,226,835
Annual loan           3,033,795.1     3,033,795.1        3,033,795.1      3,033,795.1     3,033,795.1
payment
Interest              4,004,609.5 4,004,609.5            4,004,609.5      4,004,609.5     4,004,609.5
payment
revenue before        12,182,462        26,895,819       48,411,361       65,464,636      69,134,760
tax
Income tax            4,263,861.8     9,413,536.8 16,943,976.5 22,912,622.7 24,197,166.1
Net profit            7,918,601       17,482,283 31,467,385               42,552,014      44,937,594
  43 | P a g e    project proposal developed for desert wheat
               Wheat Production Enterprise
CHAPTER NINE
         9.1. Challenges & Opportunities
The project is viable to natural catastrophes such as climate changes like delay or
extension of rainfall. In addition, it is subject to market dynamics such as inflation which,
in turn, affects the import-export Endeavour’s of the project. Plus, the rise and fall of
market prices may also affect the project both negatively and positively.
At international level, the demand for agricultural products, both commercial & food
crops, is increasing at an alarming rate. This, in turn, leads investors to be beneficiary
& competent in the area. In other words, investors in question will be encouraged to
produce more in terms of both quantity and quality, and hence benefit from the
international arena.
The Ethiopian government has given due attention to the sector and has developed a
conducive investment policy together with a variety of incentives. In connection to this,
as the country is witnessing a double digit growth, different industries are expanding
which, in turn, creates a back-forth linkage between the sector & industries.
         9.2. Monitoring & Evaluation (M & E)
The day-to-day activities of the project will be monitored by the agronomist. The general
manager shall visit the project site when necessary. The physical and financial plans as
well as reports of the project will be prepared and submitted to the general manager on
time. According to the reports submitted, the project will check and verify through
supervision. The financial and physical audits will be undertaken at the end of each year
either by internal or external auditors. In general, both heads of the management and
technical divisions, assisted by other relevant sectors, are the main responsible bodies
44 | P a g e    project proposal developed for desert wheat
               Wheat Production Enterprise
for monitoring and evaluation of the project and a variety of
45 | P a g e    project proposal developed for desert wheat
               Wheat Production Enterprise
criteria shall be taken in to account. In other words, the monitoring and evaluation part
will be carried out in an integrated manner.
         9.3. Parameters for M & E
As per the stages of the project, the parameters to be monitored and evaluated
include project establishment, project implementation & progress, post implementation,
environmental management, data management, camp set up, protection of water
management, land management, application of modern agricultural inputs, and composition
of machinery and so on.
         9.4. Conclusion
According to the study made, the aggregate and planned cost required to establish the
project is estimated to be 34,000,000Ethiopian birr. Out of the total financial
requirement, 30% will be covered by the investor and the remaining 70% will be covered
by loan from banks. In addition, the project is financially, socially, politically and
environmentally viable. In other words, the establishment of the project has immense
importance in this regard.
46 | P a g e    project proposal developed for desert wheat