GOVERNMENT OF TELANGANA
ELECTRICAL INSPECTORATE
The Chief Electrical Inspector M/s APARNA CONSTRUCTION AND
To Govt.of Telangana ESTATE PVT LTD, Block-C(Marigold),
5th Floor, R&B Building, Sy No 451/p,452/p,459/p ,
AC Guards, Masab Tank, GPochampally(V),Medchal(M),
Hyderabad- 500 004. Medchal Dt-500048,
Lr No :CEIG/TG/EIEx.650V/HT-MDL-2022-10484/D.No.26a/ /Dt: 07-10-2024
Sir,
Sub: The Electricity Act-2003 and Central Electricity Authority (Measures
relating to Safety and Electric Supply) Regulations, 2023 - Inspection
of Electrical Installation of M/s APARNA CONSTRUCTION AND
ESTATE PVT LTD, Block-C(Marigold), Sy No 451/p,452/p,459/p,
G.Pochampally(V), Medchal(M), Medchal Dt. - Under Section 54 of
the Electricity Act- 2003 and Regulation 38 of CEA (Measure relating
to Safety and Electric Supply) Regulations, 2023 Certain defects noticed
~ Instructions issued for Rectification-Reg,
Ref: 1) G.O.MS.No8 Dt 13-02-2012
2) Inspection Date: 06/10/2024
FORM OF ORDER
Whereas the Electrical Installation of Voltage Exceeding 650Volts of
M/s APARNA CONSTRUCTION AND ESTATE PVT LTD, Sy No 451/p,452/p,459/p,
Block-C(Marigold), G.Pochampally(V) Medchal(M), Medchal Dt was inspected on
06/10/2024 and whereas it appears to me that you have not complied with the
following regulations,
You are hereby called upon to comply with the above said regulations and
furnish compliance report duly authenticated by ‘A’ Grade Licensed Electrical
Contractor, so as to reach this office on or before 04/11/2024 . This compliance
report should be fully descriptive, item-wise self-explanatory.
An appeal may be filed against this order under sub-section (2) of Section
162 of The Electricity Act - 2003, within three months of the date on which this order
is served or delivered or is deemed to have been delivered but this order must be
complied with, notwithstanding such appeal, unless the appellate authority on or
before the date specified in paragraph above, suspends its operation.
Cont Page No.1aft
INSTRUCTIONS
PANEL ROOM and Shaft
ru
1
2.
3,
4.
A
8.
9,
Ttis noticed that all metering, panels in the floors are single earthed, the same shall be
double earthed with suitable size earth conductor.
Heat and smoke detectors shall be installed in the: shaft and flats control panel room.
The Glands of all the Cables shall be connected to Earth.
Itis noticed that all LDBs in panel rooms, shafts and cellars are not connected
to earth, the same shall be double earthed with suitable size earth conductor.
All openings of electrical shaft shall be closed with 4 Firs rated fire retardant
material,
‘A suitable exhaust fans shall provide in all panel rooms.
Danger Boards as per Indian Standard 2551 should be affixed permanently on
electrical shaft in each floor.
‘All the Temporary /Loose wiring in your installation shall be remove
immediately and make permanent where ever it is necessary.
Floor gap in electrical shaft shall be filled with non-flammable material.
10, Suitable lighting shall be provide to electrical shaft.
ILFLATS AND COMMON AREA:
i
2
3
‘Switch boards and sockets in bathroom shall be removed.
All sockets in flats shall be placed at a height of 4’ '6" from floor level.
itis noticed that some wires are left with bare conductor in the flats, the same shall
be covered with suitable insulation tape.
It is noticed that earth wires and neutral wires are looped in switch boards, the same
shall avoid and separate connectors shall provide in every board.
Switches/sockets near the sink of kitchen in flats shall be remove and provide
adequate clearance from the sink.
Revised load list shall be submit as per the loads exists in your installation.
Lightning conductor shall be provided on the Top of the Building and it shall be
connected to a separate and independent Earth Electrode with 25x3mm Copper flats
by running on insulators.
Weather proof switches/sockets shall be provide in balconies.
ENERAI
FEN
Instruction charts in English and Telugu for the restoration of Persons suffering from
Electric Shock shall be exhibited at all the Conspicuous Places.
Danger Notices shall be exhibited at all the Conspicuous Places.
Suitable Rubber mats shall be provided in front of all the switch Boards/Panels.
Clear Identification marks shall be provided for the various circuits on the Main Panel
and SDBs/LDBs.
CO2 / DCP type Fire Extinguishers shall be provided atall the conspicuous
places for dealing with Electrical Fires.
Insulated sleeve or cover shall be provided for all lighting poles upto a height of 1.5
Mtrs from the ground
Earth Flats shall be properly connected avoiding air gaps, where ever Joints
were made and where they are connected at Electrodes to have more contact area
and to maintain the continuity of Earth path from Equipment to Earth Electrodes8. i) Suitable Funnels and Covers shall be provided to all the Earth Pits.
!) Identification Marks shall be provicied on all the Earth Pits.
iii) All the Barth Electrodes shall be interconnected.
9. Aclearance of 3.0 Mtrs. in between the Earth Pits and 1.5 Mtrs. from Wall to Earth Pi
t shall be maintained as suggested during inspection.
10, Earth Pits shall be maintained as per IS:3043-1987
11. As the validity of the drawings are expired on 02/11/2023, the drawings
revalidation fee of Rs 7000 shalll pay in the form of challan to this office.
Yours faithfully