0% found this document useful (0 votes)
406 views3 pages

Electrical Inspection Report

Uploaded by

Mahamudul Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
406 views3 pages

Electrical Inspection Report

Uploaded by

Mahamudul Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Date: Revision No.

Issued by : Page No.: 1 of 1

ELECTRICAL INSPECTION REPORT Quarterly Performance Report-Safety Ref No.

Name of the Project: Month: YEAR : No. of Buildings:


Project Head : Project Head: Name of the Contractor :

SL NO Activities Observations Terget Date Remarks

1 CABLE

1.1 Are cables in good condition? Free


from physical damage, not fray.

Are cables laid either underground or


1.2 overhead? No tripping hazards on
enroot of cable.

Are welding cables taken in exclusive


1.3 route? Connected to machines with
lugs.

Is there overlapping of welding cable


1.4
with other cables/gas hoses observed?

2 DBs /SDBs

Are standard DB/SDBs in use at site


2.1 with proper hood? Protection from
rain?
Is Earth lead continued upto
2.2
DBs/SDBs?
2.3 Are the boards overloaded?

Is the boxes/boards closed preventing


2.4
from contacts with energized wiring?

3 ELCB/RCCB
Are all tapping points/plug pins are
3.1
routed through ELCB/RCCB?
Is the sensitivity of ELCB/RCCB
3.2
maintained at 30mA?
Is an approved ELCB tester available at
3.3
site?

Are the ELCBs are tested periodically


3.4
and recorded by a competent person?

4 DG & DG ROOM
4.1 Is the access is clear?
Is it free from oil spill/cotton waste
4.2
etc.?
Is Fire Extinguisher available?
4.3 Inspected, check labels, pressure
condition

4.4 Is PUC available? status, validity

4.5 Are panels in good condition?

4.6 Are gauges in good condition?

4.7 Adequate warning signs provided?

Is Neutral Earthing provided in main


4.8
DB at D.G/ Transformer?

4.9 Is continuity of Earth conductor


checked
Value of Earth resistance/ System of
4.10 periodical check of Earth resistance,
test register.

5 Electrical Machines /Accessories


Is power tapped by approved clad plug
5.1
tops?

IS sheds/protection is adequate for


5.2
welding machines and other panels?

Are halogen fittings are proper and


5.3
cable routed overhead/ underground?

Is portable hand tools of double


5.4 insulation and periodic inspection are
on?

6 Any other observation.

Signature of the Electrical Engineer Signature of the Safety In Charge Signature of Project Head