0% found this document useful (0 votes)
14 views7 pages

Uploaded by

Abdalla Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views7 pages

Uploaded by

Abdalla Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

Date: 19.11.2024
Man Power

SN Name Title

1 MAHMOUD SAID Rescue Team Supervisor

2 RAGHEB ABD ELMAGEED Rescue Team Supervisor

3 HOZIFA ABDULLAH Rescue Team Technician

4 AHMED ELTAHAWY Rescue Team Technician

5 MOHAMMED HASAN Rescue Team Technician

6 MOHAMED MAGDY Rescue Team Technician

7 ABDULLAH MAHMOUD Rescue Team Technician

8 ABDULAZIZ GAMAL Rescue Team Technician

Page 1 of 7
ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

Permits Signed:

SN Area PTW No Activity / Description

B03
1. 22299 Confined Space ( installation )
H021

B04
2. 22741 Confined Space ( Grating Removal )
H001

B04
3. 22774 Working at height (Man basket)
H001 Roof Cladding

B04
4. 22390 Confined Space ( Scaffolding )
H001

B04
5. 22826 Confined Space ( Isolation )
H001

B03
6. 22647 Working at height (Man basket)
T021 Sec Steel

B03
7. 22648 Working at height (Man basket)
T021 Grating

B03
8. 22373 Confined Space (Alignment)
E012

B03
9. 22341 Confined Space (Construction)
Trench Line

B03
10. 22948 Working at Height ( PWHT )
STR100

B03
11. 22938 Working at Height ( Piping )
PR300

B03
12. 22342 Confined Space (test)
Manhole

Page 2 of 7
ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

B03
13. 22960 Working at Height ( Piping )
K001A,B,C

B03
14. 22909 Confined Space (Ladder )
Manhole

B03
15. 22944 Working at Height ( Growled )
K002

B03
16. 22937 Working at Height ( Piping )
PR105-106

B03
17. 22949 Working at Height ( Piping )
STR200

B03
18. 22344 Working at Height (Chipping)
Manhole

B03
19. 22540 Working at Height (installation)
PR500

B04
20. 22628 Confined Space (Chipping )
Manhole

B04
21. 22928 Working at Height ( Man Lift)
H001

B04
22. 22864 Confined Space (Ladder )
Manhole

Q
23. 22358 Confined Space (Hydro test)
BA001

Q
24. 22752 Working at Height ( Grating Removal )
PR101-102

Q
25. 22827 Confined Space (Construction)
BA701 Pump 702 ABC

Q
26. 22946 Confined Space (Installation)
BA001

Page 3 of 7
ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

Q
27. 22945 Confined Space (Installation)
BA002

Q
28. 22947 Working at Height (Installation)
Colling Tawas

Q
29. 22336 Confined Space ( Hydro-Test )
Cooling Tower

Q
30. 22964 Confined Space ( Hydro-Test )
BA001

Q
31. 22933 Work at Height ( Scaffolding )
PR 102

Q
32. 22934 Confined Space ( Scaffolding )
BA001

Q
33. 22931 Confined Space ( Scaffolding )
BA002

Q
34. 22932 Work at Height ( Scaffolding )
PR 101

Q
35. 22494 Confined Space (concrete)
Manholes

M58
36. 22510 Confined Space ( HDBE )
Trench

M50
37. 22872 Confined Space (Chipping )
Man hole

M50
38. 22769 Confined Space ( Construction )
Trench Line

M50
39. 22868 Confined Space ( Scaffolding )
BA601

M
40. 22930 Work at Height ( Scaffolding )
PR 1100

Page 4 of 7
ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

M
41. 22929 Work at Height ( Scaffolding )
PR 1000

M
42. 22927 Work at Height ( Scaffolding )
PR 900

M
43. 22926 Work at Height ( Scaffolding )
PR 900

DHTU
44. Air cooler E-005 A/B/C/D 13058 Confined Space (Alignment)
– E007A/B

DHTU
45. 13240 Working at Height ( Piping )
K001A,B,C

DHTU
46. 13095 Confined Space ( Hydro-Test )
BA002

DHTU
47. 13193 Confined Space ( Piping )
BA002

VDU
48. 13239 Confined Space ( Touch up )
BA002

VDU
49. 13004 Confined Space ( House Keeping )
Man hole

VDU
50. 13136 Working at Height ( Piping )
T001

VDU
51. 13204 Working at Height ( Tray )
T001

Page 5 of 7
ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

Rescue team activity drill


Confined Space – B04 – H001
Scenario: a worker had been tired Inside H001 Scaffolds.

IMG_202410 31_122 018

Page 6 of 7
ASSIUT HYDROCRACKING COMPLEX PROJECT (AHC)

Emergency Team Daily Report

1. Observations / Notes (If any):


2. Signed a rescue plan for T001 Piping Area VDU.
3. Signed a rescue plan for PR100 Piping Area VDU.
4. Signed a rescue plan for PR200 Piping Area VDU.
5. Signed a rescue plan for H001 Cutting WAH Area VDU.
6. Signed a rescue plan for H001 Isolation CONF Area VDU.
7. Signed a rescue plan for H001 Preservation Area VDU.
8. Signed a rescue plan for STR 200 Steel at Area DHTU.
9. Signed a rescue plan for PR101-102-103 Piping at Area DHTU.
10. Signed a rescue plan for STR 100 Piping at Area B03.
11. Signed a rescue plan for H021 Piping at Area B03.
12. Signed a rescue plan for H002 Installation at Area B03.
13. Signed a rescue plan for H001 Installation at Area B03.
14. Signed a rescue plan for H021 Installation at Area B03.
15. Signed a rescue plan for H021 welding at Area B03.
16. Signed a rescue plan for H021 PWHT at Area B03.
17. Signed a rescue plan for H002 Installation at Area B03.
18. Signed a rescue plan for H001 Installation WAH at Area B03.
19. Signed a rescue plan for H021 Installation WAH at Area B03.
20. Signed a rescue plan for H001 Bent house Grating at Area B04.
21. Signed a rescue plan for PR1200 TO 1800 Hydro test at Area M.
22. Signed a rescue plan for PR100 Steel man lift at Area M50.
23. Signed a rescue plan for Trench Hydro test at Area M50.
24. Signed a rescue plan for BA002 Scaffolding Space at Area Q.

Page 7 of 7