0% found this document useful (0 votes)
79 views42 pages

3G Swap Survey at Leaf Tower 2021

Uploaded by

migzz2021
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views42 pages

3G Swap Survey at Leaf Tower 2021

Uploaded by

migzz2021
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

Emirates Integrated Telecommunications

Company (du)
3G Swap Survey - Scope 2021
Site ID Site Name Latitude Longitude 3G Swap Survey Date

IAD0099 27DEC20
Leaf tower Al Reem Island residence Part 24.49953 54.39484
Site Details:

1. Location:
Main GSM Room - Telephone Room - 21st Floor – S5
Remote Room - Telephone Room - 14th Floor – S4
Remote Room - Telephone Room - 8th Floor – S3
Remote room - Telephone Room - 4th Floor – S2
Remote Room- Telephone Room – GL Floor – S1
2. Room Access: PARKING SECURITY GUARD
3. Five Sectors Site
4. Existing LTE BTS : FSMF installed for LTE, will use Airscale after swap
5. Swap Type : Cold Swap

6. RF Swap Info : Huawei U2100 RRU to Swap with Nokia AHPMDA


U900 & L800 , FXEB L1800 to swap with AHEGA L1800
Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Summary

➢ DAS Tapping Status: Existing Triplexer will be swapped with Marge Triplexer, 5 Merge
Triplexers will be used for 5 sectors
APM-30 will be swapped with Vertiv Rectifier to power up AMIA,
➢ Power Status:
AHPMDA ( S5, S4, S3 ) & AHEGA ( S5, S4, S3 ), Existing FPMA will be
used to power up AHPMDA S2, S1 & AHEGA S2, S1
➢ FOC Status:
New Fiber Required for Swap from system Module to 3G RF module.
➢ Space Availability: Space available to install 3G 5 AHPMDA & 5 AHEGA

➢ Transmission: NE ID – 9-19055

➢ Other Dependency’s: NA

2 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
TSSR Approvals and Remarks by du Teams

- GPS not installed


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
General Photos - Main GSM Room @ 21st Floor – S5

4 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
General Photos – Remote Room-1 @ 14th Floor – S4

5 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
General Photos – Remote Room @ 8th Floor – S3

6 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
General Photos – Remote Room @ 4th Floor –S2

7 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
General Photos – Remote Room @ GF – S1

8 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Room Layout:
Main GSM
Room sec 5

Proposed location for


new AHPMDA

Proposed location for


new AHEGA

9 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Room Layout:
Remote
Room- Sec 1

Proposed location for


new AHPMDA

Proposed location for


new AHEGA

10 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Room Layout:
Remote
Room-Sec 2

Proposed location for


new AHPMDA

Proposed location for


new AHEGA

12 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Room Layout:
Remote
Room-sec 3

Proposed location for


new AHPMDA

Proposed location for


new AHEGA

12 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Room Layout:
Remote
Room-sec 4

Proposed location for


new AHPMDA

Proposed location for


new AHEGA

13 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey

Transmission Rack general Photos

16 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
MW Transmission Details

3G Ports on Existing RTN LTE Ports on Existing RTN

NE ID Existing 3G connectivity Existing 4G connectivity Electrical free Ports status Optical Free Ports status

9-19055 Connected on GE1 port Connected on GE4 port GE3/GE4/GE5 ports available GE1-5 port available
17 03/07/2021 © Nokia 2014
Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Site Overall Power Connectivity - AC

BM DB 40 Amp 3 Phase Du Isolator 63 Amp Du DB/GSM Room

18 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Rectifier Photos Site Overall Power Connectivity - DC

New Vertiv Rectifier will be installed to


power up FCOB,
AHPMDA ( S5, S4, S3 ) &
AHEGA ( S5, S4, S3 )
19 03/07/2021 © Nokia 2014
Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Rectifier Breaker Photos

APM-30 need to be
replace with Vertiv then
use to power Up [3]
AHPMDA and
[3]AHEGA
For other [3]AHEGA &
[2]AHPMDA we Need
[3] FPMA(Because if we
use Vertiv Rectifier The
power length more
then 150m)

20 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Proposed Location to install AHPMDA & AHEGA sec 1 – GF FLOOR

Proposal#1:
Proposed location to
install AHPMDA &
AHEGA S1

21 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Proposed Location to install AHPMDA & AHEGA sec 2 – 4TH FLOOR

Proposal#1:
Proposed location
to install AHPMDA &
(Cold Swap) AHEGA S2

23 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Proposed Location to install AHPMDA & AHEGA sec 3 – 8th FLOOR

Proposal#1:
Proposed location
to install AHPMDA &
(Cold Swap) AHEGA S3

24 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Proposed Location to install AHPMDA & AHEGA S4 – 14TH FLOOR

Proposal#1:
(Cold Swap) Proposed location
to install AHPMDA &
AHEGA S4

25 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Proposed Location to install AHPMDA & AHEGA S5 – 21ST FLOOR

Proposal#1:
Proposed location
to install AHPMDA &
AHEGA S5

25 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
DAS Tapping

Existing Triplexer will


be Replaced with
Marge Triplexer after
swap for U900, L800,
L1800

Existing Triplexer 900 Band 1800 band 2100 Band


Band Freq Details 790-960 1710-1880 1920-2170

3G 2100& LTE 1800


27 03/07/2021 © Nokia 2014
Directy with Triplexer
Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
DAS Tapping

Existing Triplexer will be


Replaced with Marge
Triplexer after swap for
U900, L800, L1800

Existing Triplexer 900 Band 1800 band 2100 Band


Band Freq Details 790-960 1710-1880 1920-2170

28 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
DAS Tapping

Existing Triplexer will be


Replaced with Marge
Triplexer after swap for
U900, L800, L1800

Existing Triplexer 900 Band 1800 band 2100 Band


Band Freq Details 790-960 1710-1880 1920-2170

3G 2100 and LTE 1800


29 03/07/2021 © Nokia 2014
Connects with
Triplexer
Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
DAS Tapping

Existing Triplexer will


be Replaced with
Marge Triplexer after
swap for U900, L800,
L1800

Existing Triplexer 900 Band 1800 band 2100 Band


Band Freq Details 790-960 1710-1880 1920-2170

30 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
DAS Tapping

Existing Triplexer will be


Replaced with Marge
Triplexer after swap for
U900, L800, L1800

Existing Triplexer 900 Band 1800 band 2100 Band


Band Freq Details 790-960 1710-1880 1920-2170

32 03/07/2021 © Nokia 2014


Site Name : Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Power Consumption Details

Site ID – IAD0099_After Swap


P. Consumption with
HW COUNT Total
100% load
FCOB 1 50 50
ASIB 1 129 129
Site ID - IAD0099 ABIA 2 158 316
AMIA 0 40 0
Total P.Consumption Before Swap (watt)
As per Rectifier 1800 RF module 0 904 0
MCU 2,672 800 RF module 0 510 0
AHPMDA 3 675 2025
AHEGA 3 542 1626
AREA 0 1481 0
Huawei BBU 0 150 0
Huawei RRU 0 250 0
Huawei RTN 1 150 150
Total Load after Swap 4287

33 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey Materials required for Swap
Site proposed BOQ Details

ABIA 0 2 2
AMIA 0 1 1
1800 RF module 0 0 0
800 RF module 0 0 0
AHPMDA 0 5 5
AHEGA 0 5 5
FXEB 5 0 0
Huawei BBU 1 0 0
Huawei RRU 5 0 0
Huawei RTN 1 0 1
FSEE 0 0 0
1/2 RF Superflex Cable (m) – 120 120
DC Power Cable_2core x 16sqmm +2.5 sqmm (m) – 360 360
4.3-10 MALE FOR 1/2IN. SUPERFLEX (PCs) – 36 36
FPMA 0 1 1
Marge Triplexer 0 5 5
Triplexer 6 0 0

34 03/07/2021 © Nokia 2014


Backup Slides

36 03/07/2021 © Nokia 2014


2.0 : Site Location/Information

Southern Region [Abu # Latitude [decimal]: 24.49953


Dhabi]
# Region: □ Eastern Region [Al Ain]
□ Western Region # Longitude [decimal]:
54.39484
# Site Area:
# Emirate: Abu Dhabi [urban, desert, mountain, Urban
etc…
# Address: Leaf tower Al Reem Island residence Part

37 03/07/2021 © Nokia 2014


2.1 : Site Location map

38 03/07/2021 © Nokia 2014


3.1.1 Site Access Requirements:
Padlock Type: DU Yale Padlock
Access Card Type: NA
Access Permit: NA
Access Requirements: NA
Access Time: 24 Hrs
Access SPOC: Approval required from Facility Management team with all inputs

- Site Contact Person: site Security Guard


- Crane Required: No
- Access Road: Normal

3.1.2 HSE Check & Remarks:


• Site main grounding termination: Grounded……………………………………………………………………………………………………………
• Air condition / GSM room temperature: Normal/25 C
• GSM room space status: …Enough space to work for TI Team…………………………………………………………………..
• Issues related to H&S might leads to TI issues: …NA….……………………………………………………………………………………………
• Breakers connected on battery bus bar (other than batteries)
• Tower/RT structure status: OK
• Fall-Arrest System status: OK
Additional HSE Observations:
………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………………
3.1.3 Extra Materials/Waste at Site during TSS:

39 03/07/2021 © Nokia 2014


3.2: Scope Details
□New 3G / LTE □ New 3G only □ 3G Additional to LTE □ New 4G only
□ 3G Swap  3G Swap + LTE Addition □ 3G Swap + LTE Addition + 5G Addition
□3G Swap + Modernization
 du IBS Solo □ du IBS site Share Please mention sharing partner

3.4: Existing GSM Room details

Number of GSM Rooms on site : 6

Please fill this excel file:

40 03/07/2021 © Nokia 2014


Site Name: Leaf tower Al Reem Island residence Part
3G Swap Site Survey
Proposed Location of New FCIA cabinet, Nokia Radios & New rectifier ( If Any )

Propose
Location For
VERTIV
RECTIFIER
VERTIV
RECTIFIER

Propose
Location For
FCOB FCOB

41 03/07/2021 © Nokia 2014


Cabiling Diagram of 3G Before Swap
Sector-1

4
Cabiling Diagram of 3G Before Swap
Sector-2

4
Cabiling Diagram of 3G Before Swap
Sector-3

4
Cabiling Diagram of 3G Before Swap
Sector-4

4
Cabiling Diagram of 3G Before Swap
Sector-5

4
THANKS

57 03/07/2021 © Nokia 2014

You might also like