0% found this document useful (0 votes)
13 views1 page

FGC Chamarajanagara 1

Uploaded by

Manoj H M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

FGC Chamarajanagara 1

Uploaded by

Manoj H M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9.750 9.

750

A B C D E A B C D A B C D
3.300 3.300 2.630 0.185
1. READ THE DRAWING ALONG WITH
RB-1B - 230 X 600
REINFORCEMENT STEEL DRAWING
14 14 14
2.963 2.960 2.180
14 14
RB-1A - 230 X 600 2.180
14 2. ALL DIMENSIONS ARE IN METRE AND MILIMETRE
UNLESS OTHERWISE SPECIFIED.

RB-1 230X600

RB-1 230X600
6.375
6.375 3. DO NOT SCALE THE DRAWING FOLLOW
3.300 3.300

RB-8
3.035 3.035 WRITTEN DIMENSIONS ONLY.
4. TYPE OF STRUCTURE: R.C.C FRAMED
RB-2 - 300 X 600
13 13 13 13 13 13 STRUCTURE HAVING GF + 2, DWG FF
6.375 EXIST GF, DWG WILL BE FOR FIRST FLOOR

RB-1 230X600

RB-1 230X600
6.375
ROOF BEAM,STAIRCASE , F.F SLAB STEEL DETAILS
3.300 3.300 3.000

RB-8
3.000 5. METHOD OF ANALYSIS: FINITE ELEMENT
RB-2 - 300 X 600
METHOD OF DESIGN: LIMIT STATE METHOD
12 12 12 12 12 12
OF DESIGN AS PER IS 456-2000

6.375 6. CLEAR COVER FOR REINFORCEMENT

RB-1 230X600

RB-1 230X600
6.375
3.300 3.300 FOOTING -50mm BEAMS -25mm

RB-8
3.000 3.000 COLUMN -40mm SLABS -25mm
7. FOOTING ARE DESIGNED FOR THE
11 11 11 11 11
RB-2 - 300 X 600
11
Assumed SBC. OF SOIL 20 t/SQM.
8. CONCRETE MIX FOR STRENGTH M-25
6.375

RB-1 230X600
9. GRADE OF STEEL Fe-550D.

RB-1 230X600
6.375
3.300 3.300 10. LAP LENGTH FOR ALL = 50 X DIA OF BAR

RB-8
3.000 3.000
11. ANY DISCREPANCY SHOULD BE BROUGHT
TO THE NOTICE OF THE ENGINEERS.
10 10 10 10 10
RB-2 - 300 X 600
10 BEFORE EXECUTION
6.375 BEFORE CONCRETING REINFORCEMENT SHALL

RB-1 230X600

RB-1 230X600
6.375
3.300 3.300
BE CHECKED BY THE SITE ENGINEER

RB-8
3.000 3.000 SUPERVISION IS NOT IN OUR SCOPE

RB-2 - 300 X 600 12. WHILE EVERY ATTEMPT HAS BEEN MADE IN
9 9 9 9 9 9 THE PREPARATION OF THIS DRAWING TO
AVOID MISTAKES, THE MAKER CANNOT

RB-1 230X600
6.375

RB-1 230X600
6.375
GUARANTEE AGAINST HUMAN ERROR. THE
3.300 3.300

RB-8
3.000 3.000 CONTRACTOR ON THE JOB, MUST CHECK ALL
DIMENSIONS AND OTHER DETAILS AND BE
38.495 38.495 38.495 RESPONSIBLE FOR THE SAME
8 8 8 8 8
RB-2A - 230 X 450
8
6.375

RB-1 230X600
RB-1 230X600
6.375
3.300 3.300

RB-8
3.035 3.035

RB-1C - 230 X 600


7 7 7 7 7 7
17 19 21 23
RB-5
16 18 20 24 1.500 17 19 21 23
22 16 18 20 24 1.500
2.300 22
2.300

RB-3 230X600
2.403

RB-3 230X600

RB-3 230X600
2.403
15
5.230 5.230 15

CB-1
5.000 14 2.000 14
13 5.000 5.000 2.000 5.000 5.000
13
12
11 2.700 12
2.700
11
1.500 8 6 4 1.500
2 8 6 4
1.500 1.500 1.500
2
1.500
7 5 3 5 3
10 9 1 7
6 6 6 6 6
10 9 1
6
RB-1C - 230 X 600 RB-5

RB-1 230X600

RB-1 230X600
3.300 3.300

RB-8
3.035 3.035

RB-2 - 300 X 600


5 5 5 5 5 5

RB-1 230X600

RB-1 230X600
6.375 6.375
3.300 3.300 3.000

RB-8
3.000

RB-2 - 300 X 600


4 4 4 4 4 4

RB-1 230X600
RB-1 230X600
6.375 6.375
3.300 3.300

RB-8
3.000 3.000
7.275 7.275
RB-1A - 230 X 600 RB-1B - 230 X 600
3 3 3 3 3 3
3.300 FUTURE EXPANSION 3.300
FUTURE EXPANSION FUTURE EXPANSION

2 2 2 2 2 2
3.300 3.300

1 1 1 1 1 1
3.300 3.300 2.630 0.185
SAATHVIKA CONSULTANTS
A B C D E A B C D A B C D BUILDING STRUCTURAL DESIGN - 3D
DESIGN - ARCHITECTURAL PLANS - DPR
FUTURE EXPANSION & PMC - ESTIMATION - E-TENDERS
VIJAYANAGARA 4TH STAGE, MYSORE -
TITLE: 01 EXIST GROUND FLOOR COLUMNS GRID SECTION TITLE: 02 EXISTING GROUND FLOOR COLUMNS GRID SECTION TITLE:03 FIRST FLOOR ROOF BEAM SHUTTERING DETAILS MOB: 9731581253
DETAILS DRAWING E-mail - chethann12591@gmail.com
DETAILS DRAWING DRAWING

You might also like