g Nuovo Pignone                                                                                                                     No.
STD-ET-117
                                                                        PRE-COMMISSIONING                                               sheet         1 of 1
                 FIRENZE                                                      FORM                                                      date:
                                                                          ELECTRIC LEADS
           System :.....................................................................................................................................................
                                                     INSTRUMENTS USED FOR TESTING
           - Multitester                                                                             - Telephones or radiotelephones
   POS.                                        ACTIVITY                                           CHECKS               DATE                            NOTE
     2.1         Preliminaty checks
                 Correct final position
                 Leads integral (not broken)
                 Correct sequence of connection
     3.0         Final Setup
                 Leads connected to the temporary
                 terminal board
                 Leads marked at the both ends
 Note:
 Contractor:                                                 Nuovo Pignone                                            Final Client:
 .........................................................   ......................................................   ........................................................
STD-ET-117                                                                                                                                          Page 1 of 1