Mr. Sushant Agarwal Ji

Uploaded by

spearheadhomes1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

Mr. Sushant Agarwal Ji

Uploaded by

spearheadhomes1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

632/167 kamta chauraha ayodhya road lucknow.

To,
Mr. Sushant Agarawal ji
GOMTI NAGAR LUCKNOW
Dated: 12-june-2024
QUOTATION FOR INTERIOR WORK

S.N. WORK WORK DESCRIPTION QTY RATE AMOUNT


Ceiling Putty & painting work
1 250 35 8750

flooring Pvc flooring 1mm


2 250 40
10000

2’*4’*4.5’ providing & fixing 18


3 Reception table mm commercial ply isi mark - - 26500
laminate with mica 1 mm

provide and installation of


4 Front toughen glass & toughen glass & glass door L/S L/S 22200
glass door with handle

Toughen Fix glass


5 Side wall fix glass L/S L/S 14000
toughen

Discussion table 18 mm commercial ply finish


6 with mica & 4 wheel chair 26,000

19 mm mr grade ply shutter


7 Wall Display reception with - - 8750
side ply and mica as per design
with isi

8 Tv panel 4’*4’ - - 12500


9
Changing room with rack 4’*4 L/S L/S 26,700
on opposite side
With granite counter slab
10 Pantry 5*4 L/S L/S 22,700

4’*6’
Rack
11 L/S L/S 17,000

Product Display 19 mm mr grade ply shutter


12 with ply and mica as per 17 32,000
design with isi channels and 32
hardware.
13 Two shutter covering with 12,000
board finish with mica
provide and installation
14 Pvc panel wallpaper 220 65 14300
work on walls as per design
15 Electrical fitting, 45,000
switch ,wires & mcb
16 Track & focus light 12 focus light & track L/S L/S 28,000

TOTAL 3,26,400
TOTAL SAY RUPEES THREE LAC TWENTY SIX THOUSAND FOUR HUNDRED ONLY

NOTE:
 The above quotation may vary as per market fluctuation this quotation valid up-to 1week.
the advance amount is 50% to be paid to start the work.
 Applicable tax shall be additional (18% gst)
 Fan & tubelight is not included in this quotation
 Any other work which is not specified above shall be charged extra as per actual cost.
 Water & light shall be arranged by client .