The document outlines the professional services and cost estimates for designing and executing a residence, including various charges for materials and labor. It specifies rates for false ceilings, electrical work, plumbing, carpentry, and finishes, along with a payment schedule and duration of work. The total cost for designing and consultation is Rs. 1,50,000, with additional charges based on actual measurements and work performed.

Uploaded by

atikajain22
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views4 pages

MR Jhawar

The document outlines the professional services and cost estimates for designing and executing a residence, including various charges for materials and labor. It specifies rates for false ceilings, electrical work, plumbing, carpentry, and finishes, along with a payment schedule and duration of work. The total cost for designing and consultation is Rs. 1,50,000, with additional charges based on actual measurements and work performed.

Uploaded by

atikajain22
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

To,

Mr.JHAWAR
KOLKATA

DESIGNING AND EXECUTION JOB OF THE RESIDENCE


With reference to the above, we give below our details for professional services
for supervision and execution of the office to be rendered:

DETAILS OF THE TOTAL COST FOR THE WORK :

DESIGNING AND CONSULTATION CHARGES Rs.1,50,000/-

DETAILS AS PER SFT BASIS :

FALSE CEILING - 140 PER SFT WITH MATERIALS

ELECTRICAL LABOUR - 65 PER SFT

PLUMBING LABOUR - LUM SUM

PATTA PARIS - 45 PER SFT

CIVIL WORK WILL BE GIVEN AS PER ACTUALS PER SFT OR LUMSUM

PAINT - WILL BE QUOTED AS PER MEASUREMENTS

POLISH WORK - LUM SUM

CONTD PAGE -2
:: 2 ::

PU CLEAR MATT - 280 PER SFT + 135 PER RFT

PU COLOUR MATT - 320 PER SFT + 160 PER RFT

PU CLEAR GLOSS - 330 PER SFT + 140 PER RFT

PU COLOUR GLOSS - 340 PER SFT + 165 PER RFT

HAND POLISH - 80 PER SFT + 45 PER RFT

(POLISH CHARGES FOR OTHER ELEMENTS SUCH AS CNC CUTTING ON


MDF/HDF ETC WILL BE GIVEN LATER AS PER DESIGN
APPLICATION ,METALLIC POLISH WILL BE CHARGED
SEPARATELY,MATERIAL USED - ASIAN OR ICA)

CLEANING CHARGES WILL BE ADDED LATER AS PER WORK

SOFA - AS PER DESIGN

CURTAINS AND PADDING - AS PER ACTUALS

WALL TEXTURE - AS PER ACTUALS

CARPENTRY LABOUR

WARDROBE OR FULL HEIGHT STORAGE UNIT - 550 PER SFT(INCLUDES 2


DRAWERS)

SMALL CABINET OR STORAGE CABINET - 550 PER SFT

EXTRA DRAWERS UNIT - 2500 PER DRAWER or PALLA

MAIN DOOR - AS PER DESIGN

DOOR PANELLING - 7500 PER DOOR

DOOR FRAME PANELING - 2500 PER DOOR

CONTD PAGE -3
:: 3 ::

WALL PANELING - 260 PER SFT

PILLAR PANELING - 260 PER SFT

PARTITION - 450 PER SFT

WOODEN CEILING - 380/-

PALMET/LIGHT TRAY - 340 RFT

KITCHEN /PANTRY CABINETS -550 PER SFT

MARBLE AND TILES LABOUR

TILES LAYING FLOORING - 65/- per sft ( size 2’-5” x 5’-0”)

TILES LAYING ON WALL - LUM SUM

CONTD PAGE -4
:: 4 ::

4. MODE OF PAYMENT :

25% PAYMENT AT THE COMMENCEMENT OF THE JOB

REST OF THE PAYMENTS FOR LABOUR AND SUPERVISION WEEKLY AS


THE WORK PROGRESSES

5. DURATION OF WORK:

LAYOUT DIMENSIONS WILL BE CHECKED AT THE SITE BEFORE


COMMENCEMENT OF WORK.

DURATION OF WORK DENOTES APPROXIMATE WORKING DAYS.


PAYMENT CAN BE TAKEN EARLIER IF REQUIRED.

PAYMENT SHOULD BE MADE ON TIME.

EXTRA WORK WILL BE CHARGED AS APPLICABLE.

Thanking you,

Yours truly,

DEFINELINES INTERIORS