DREAMS DECOR INTERIOR AND EXTERIOR, NAGPUR
INTERIOR COSTING OF : Mr.SAPNA
SR NO. INTERIOR WORK SPECIFICATION QUANTITY SIZE AMOUNT
A LIVING ROOM 21.2 X 14'7''
1 T.V. Unit (+ electric fitting) 1 UNIT 6' x 7' 45,000 + 5,000
2 Remaining Wall Panelling 1 UNIT 7' x 9.6 x 2.6 x 6' 38,000
3 Counter Table 1 UNIT 5' x 32'' x 16'' 40,000
4 Wall Shelf 1 UNIT 5' x 3' 35,000
5 Sofa 1 UNIT 7 Seater 84,000
6 Center Table 1 UNIT 2'4'' x 3.4'' 25,000
7 Princess Chair 1 UNIT 2 nos 20,000 x 2= 40,000
8 Coffee Table (Small) 1 UNIT 12,000
9 Outer Door Panelling 1 UNIT 24,000
10 Shoe Rack + Stool 1 UNIT 20,000
11 Mandir 1 UNIT 3'' x 2' x 7' 18,000
12 Manir Partition 1 UNIT 4' x 7' 44,000 + 4,000
13 False Ceiling + Electrical work + lights 1 UNIT 4' x 8.6 20,000 + 5,000
14 Mandir + electric work 1 UNIT 3'10'' x 9' 44,000 + 4,000
15 Mandir Outer Wall Panelling 1 UNIT 4' x 10' 20,000
TOTAL
B KITCHEN PASSAGE
1 BASIN COUNTER 1 UNIT 3' x 32'' x 20'' 14,000
2 Granite 1 UNIT 3' x 32'' x 20'' 6,000
3 Basin 1 UNIT no tap 20,000
4 Plumbing work + Material work 1 UNIT 6,000
5 Crockery Unit + Artifacts shelf only (9.5 kg) 1 UNIT 4.6 x 9' + 4.5 x 9' 45,000
7 Glass Profile Door 1 UNIT 16,000
TOTAL
C KITCHEN 12.6 x 9.6
1 Otta Granite - quartz 1 UNIT 8.6 x 12.6 45,000
2 Granite Molding Polish 1 UNIT 16,000
3 Civil Work installation + Granite Loading ,Unloading 1 UNIT 4,000
4 Bison Sheet 1 UNIT 8,000
5 New Basin 1 UNIT 20,000
6 Plumbing material + labour 1 UNIT 6,000
Otta Cabinet (3 thatch basket + 3 tendom basket 8'' + 4''-6'' 10,000 + 18,000 +
7 1 UNIT
tendom trollys) 18,000
8 Toll Unit 1 UNIT 2' x 6' - 7' 36,000
9 Service Otta Granite 1 UNIT 8' x 32'' 15,000
10 Old Trollies Installation + 6 trollies 1 UNIT 30,000
11 Wicker Basket 1 UNIT 3 nos 20,000
12 Break FAST Counter 1 UNIT 4' x 3' 36,000
Handing Lights point installation (3 light points only) + freeze
13 1 UNIT 4,000
point installation (microwave + mixer point)
14 Otta Overhead Cabinet 1 UNIT 8'.6 x 2.6 60,000
15 Otta UpperOverhead Cabinet 1 UNIT 8.6 x 2.6 60,000
16 Otta Overhead and upper overhead Cabinet 1 UNIT 10' x 2.6 + 10' x 2.6 70,000 + 70,000
17 Otta Overhead + otta Upperoverhead cabinet 1 UNIT 9'.4 x 2.6 + 9.4 x 2.6 1,20,000
18 Rolling Shutter 1 UNIT 2' x 3' 30,000
19 Kitchen Wash area Granite 1 UNIT 5' x 2' 6,000
20 Old Basin Installation + plumbing material + labour 1 UNIT 8,000
21 Ditergent Cabinet 1 UNIT 5' x 2' 20,000
TOTAL
D KIDS ROOM
1 Bed ( hydrolics + headboard Cushionning) 1 UNIT 5' x 6.6 40,000 + 8,000 + 8,000
2 Side table 1 UNIT 2 nos 18,000
3 Wardrobe 1 UNIT 6' x 7' 55,000
4 Wardrobe Loft (Overhead Cabient) 1 UNIT 11.6 x 2.6 40,000
5 Study Table + Book shelf 1 UNIT 5.4 x 32'' + 5.4 x 3' 40,000
6 Wallpaper of Bed Back wall 1 UNIT 10'.6'' x 9.6 25,000
TOTAL
E GUEST ROOM
1 Bed wall Mount + (hydrolics + fitting charges) 1 UNIT 5' x 6.6 45,000 + 15,000
2 old Wardrobe Conceiling in conceiled structure 1 UNIT 30,000
3 Table (plank + drawer) 1 UNIT 4' x 32'' 16,000
4 Book Shelf 1 UNIT 3' x 4' 35,000
5 Window Seating 1 UNIT 3.6 x 20'' 24,000
6 Wall Panelling 1 UNIT 7.6 x 7' 24,000
7 Overhead Cabinet 1 UNIT 7' x 2.6 36,000
TOTAL
F MASTER BEDROOM
1 Bed ( hydrolics + headboard Cushionning) 1 UNIT 6' x 6.6 40,000 + 8,000 + 8,000
2 Side table 1 UNIT 1 nos 9,000
3 Bed Panelling 1 UNIT 14'8'' x 9.6 40,000
4 Wardrobe 1 UNIT 8' x 7' 80,000
5 Dressing table 1 UNIT 3' x 7' 28,000
6 Overhead Cabinet 1 UNIT 14.8 x 2.6 45,000
7 T.V. Unit (+ electric fitting) 1 UNIT 6' x 6' 38,000 + 4,000
TOTAL
G WALKING WARDROBE ROOM
1 Old Door Should be Sliding tucked and conceilied 1 UNIT
2 Wardrobe 1 UNIT 5' x 7' + 4'6'' x 7' 55,000 + 48,000
3 Wardrobe loft 1 UNIT 5' x 2.6 + 4.6 x 2.6 38,000
4 Basin Counter only in 3 bathroom 1 UNIT 12,000 x 3 36,000
TOTAL
LOADING & UNLOADING OF ALL INTERIOR MATERIAL (GROUND
NOTE
TO 13TH FLOOR WITH LABOUR)
SUB TOTAL 1
5% SERVICE CHARGES INCLUDES : INNOVATIVE & CONCEPTUAL
DESIGNING, THEME BASED DESIGNING, MAPPING, PLANNING,
SERVICE CHARGES OF
NOTE 1 SITE VISITS, SUPERVISION, ORGANISING TECHNICAL
INTERIOR DESIGNER
WORKFORCE, PROCURING INTERIOR MATERIAL, LAMINATION
SELECTION
SUB TOTAL 2
EXTRA WORK IS NOT INCLUDED GRAND TOTAL
NOTE 2 5% EXTRA SERVICE CHARGES FOR BENEFITS OF 2D & 3D VIEW: IF REQUIRED
Terms & Conditions
25 %NOTE
WILL 3BE DEDUCTED IF ANY LISTED FINALISED INTERIOR ITEM IS CANCELLED BY CLIENT
COMPANY SUPPLY RAW MATERIAL IN EXCESS ON SITE TO
COMPLETE THE INTERIOR WORK , AFTER COMPLETION OF
NOTE 4
LISTED INTERIOR PRODUCT ITEMS , THE REMAINING RAW
MATERIAL IS THE PROPERTY OF COMPANY
AFTER THE COMPLETEION OF INTERIOR WORK , THE SHOOTING
NOTE 5 OF ALL INTERIOR WORK WILL TAKE PLACE , WHICH WILL BE
UPLOADED IN COMPANY'S SOCIAL PLATFORMS
ALL FURNITURES WILL BE CUSTOMISED AND DESIGNED BY
NOTE 6 INTERIOR DESIGNER WITH MAPPING AND PLANNING OF
INTERIOR DESIGN WORK WILL BE DONE ON TURNKEY PROJECT .
INTERIOR WORK DESIGN ONCE FINALISED WILL NOT BE
CHANGED , IF ANY CHANGE IN DESIGN IS REQUIRED BY
NOTE 7
COSTUMER , THEN EXTRA PAYMENT WILL BE CHARGED FOR
MATERIAL AND LABOUR CHARGES.
ELECTRIC FITTING WILL BE ONLY PROVIDED FOR T.V. UNIT AND
NOTE 8
POP RELATED LIGHTS & BUTTONS ONLY
IF ANY ITEM IS CANCELLED BY CLIENT FROM THE FINALISED
COSTING LIST THANT THE PRODUCTION / SUPPLY OF
NOTE 9
COMPLIMENTARY INTERIOR ITEMS WILL BE CANCELLED, HENCE
IT WILL BE NOT PROVIDED TO THE CLIENT.
IF THE ADVANCE PAYMENT CHEQUES ARE NOT CREDITED /
CLEARED BY CLIENT’S BANK ON THE PAYMENT SCHEDULED
DATES AGREED UPON THE AGREEMENT, THEN ADDITIONAL 2
DAYS WILL BE GRANTED TO THE CLIENT TO RESOLVE THE
NOTE 10
PAYMENT ISSUE, OTHERWISE RESULTING IN A STOP OF
PRODUCTION / SUPPLY OF THEIR INTERIOR & FURNITURE WORK,
AS THE MATERIALS & LABOUR PAYMENTS ARE DONE BY
RECIEVED / PAID CLIENT PAYMENTS ONLY.
IF EXTRA WORK ADDS IN THE MAIN FINAL COSTING, THEN THE
NOTE 11 SERVICE CHARGES WILL BE INCREASED AS PER THE FINAL
COSTING
MATERIAL SPECIFICATION: WE WILL BE USING M R GRADE
ALTERNATE PLY : 18MM FOR STRUCTURE, 12MM FOR BACK
PANELLING, 19MM FOR OPENABLE WARDROBES OF HARDWOOD,
NOTE 12
25MM FOR SLIDING WARDROBE, 0.8MM MICA/ LAMINATE, 0.8MM
INNER & OUTER LAMINATE, BWP PLY, HINGES: GODREJ
COMPANY: SOFT CLOSE, CHANELLS: GODREJ REGULAR