0% found this document useful (0 votes)
30 views4 pages

Interior Costing of Mrs - Sapna

The document outlines the detailed interior costing for a project by Dreams Decor in Nagpur, specifying various interior work specifications, quantities, sizes, and amounts for different rooms including the living room, kitchen, kids room, guest room, master bedroom, and walking wardrobe. It includes a breakdown of costs for furniture, fittings, and additional services, along with terms and conditions regarding cancellations, payments, and material specifications. The total cost is not explicitly stated in the provided text, but it emphasizes the customization and design aspects of the interior work.

Uploaded by

remoterum8694
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views4 pages

Interior Costing of Mrs - Sapna

The document outlines the detailed interior costing for a project by Dreams Decor in Nagpur, specifying various interior work specifications, quantities, sizes, and amounts for different rooms including the living room, kitchen, kids room, guest room, master bedroom, and walking wardrobe. It includes a breakdown of costs for furniture, fittings, and additional services, along with terms and conditions regarding cancellations, payments, and material specifications. The total cost is not explicitly stated in the provided text, but it emphasizes the customization and design aspects of the interior work.

Uploaded by

remoterum8694
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

DREAMS DECOR INTERIOR AND EXTERIOR, NAGPUR

INTERIOR COSTING OF : Mr.SAPNA

SR NO. INTERIOR WORK SPECIFICATION QUANTITY SIZE AMOUNT

A LIVING ROOM 21.2 X 14'7''


1 T.V. Unit (+ electric fitting) 1 UNIT 6' x 7' 45,000 + 5,000
2 Remaining Wall Panelling 1 UNIT 7' x 9.6 x 2.6 x 6' 38,000
3 Counter Table 1 UNIT 5' x 32'' x 16'' 40,000
4 Wall Shelf 1 UNIT 5' x 3' 35,000
5 Sofa 1 UNIT 7 Seater 84,000
6 Center Table 1 UNIT 2'4'' x 3.4'' 25,000
7 Princess Chair 1 UNIT 2 nos 20,000 x 2= 40,000
8 Coffee Table (Small) 1 UNIT 12,000
9 Outer Door Panelling 1 UNIT 24,000
10 Shoe Rack + Stool 1 UNIT 20,000
11 Mandir 1 UNIT 3'' x 2' x 7' 18,000
12 Manir Partition 1 UNIT 4' x 7' 44,000 + 4,000
13 False Ceiling + Electrical work + lights 1 UNIT 4' x 8.6 20,000 + 5,000
14 Mandir + electric work 1 UNIT 3'10'' x 9' 44,000 + 4,000
15 Mandir Outer Wall Panelling 1 UNIT 4' x 10' 20,000
TOTAL
B KITCHEN PASSAGE
1 BASIN COUNTER 1 UNIT 3' x 32'' x 20'' 14,000
2 Granite 1 UNIT 3' x 32'' x 20'' 6,000
3 Basin 1 UNIT no tap 20,000
4 Plumbing work + Material work 1 UNIT 6,000
5 Crockery Unit + Artifacts shelf only (9.5 kg) 1 UNIT 4.6 x 9' + 4.5 x 9' 45,000
7 Glass Profile Door 1 UNIT 16,000
TOTAL
C KITCHEN 12.6 x 9.6
1 Otta Granite - quartz 1 UNIT 8.6 x 12.6 45,000
2 Granite Molding Polish 1 UNIT 16,000
3 Civil Work installation + Granite Loading ,Unloading 1 UNIT 4,000
4 Bison Sheet 1 UNIT 8,000
5 New Basin 1 UNIT 20,000
6 Plumbing material + labour 1 UNIT 6,000
Otta Cabinet (3 thatch basket + 3 tendom basket 8'' + 4''-6'' 10,000 + 18,000 +
7 1 UNIT
tendom trollys) 18,000
8 Toll Unit 1 UNIT 2' x 6' - 7' 36,000
9 Service Otta Granite 1 UNIT 8' x 32'' 15,000
10 Old Trollies Installation + 6 trollies 1 UNIT 30,000
11 Wicker Basket 1 UNIT 3 nos 20,000
12 Break FAST Counter 1 UNIT 4' x 3' 36,000
Handing Lights point installation (3 light points only) + freeze
13 1 UNIT 4,000
point installation (microwave + mixer point)
14 Otta Overhead Cabinet 1 UNIT 8'.6 x 2.6 60,000
15 Otta UpperOverhead Cabinet 1 UNIT 8.6 x 2.6 60,000
16 Otta Overhead and upper overhead Cabinet 1 UNIT 10' x 2.6 + 10' x 2.6 70,000 + 70,000
17 Otta Overhead + otta Upperoverhead cabinet 1 UNIT 9'.4 x 2.6 + 9.4 x 2.6 1,20,000
18 Rolling Shutter 1 UNIT 2' x 3' 30,000
19 Kitchen Wash area Granite 1 UNIT 5' x 2' 6,000
20 Old Basin Installation + plumbing material + labour 1 UNIT 8,000
21 Ditergent Cabinet 1 UNIT 5' x 2' 20,000
TOTAL
D KIDS ROOM
1 Bed ( hydrolics + headboard Cushionning) 1 UNIT 5' x 6.6 40,000 + 8,000 + 8,000
2 Side table 1 UNIT 2 nos 18,000

3 Wardrobe 1 UNIT 6' x 7' 55,000

4 Wardrobe Loft (Overhead Cabient) 1 UNIT 11.6 x 2.6 40,000

5 Study Table + Book shelf 1 UNIT 5.4 x 32'' + 5.4 x 3' 40,000

6 Wallpaper of Bed Back wall 1 UNIT 10'.6'' x 9.6 25,000

TOTAL

E GUEST ROOM

1 Bed wall Mount + (hydrolics + fitting charges) 1 UNIT 5' x 6.6 45,000 + 15,000

2 old Wardrobe Conceiling in conceiled structure 1 UNIT 30,000


3 Table (plank + drawer) 1 UNIT 4' x 32'' 16,000
4 Book Shelf 1 UNIT 3' x 4' 35,000
5 Window Seating 1 UNIT 3.6 x 20'' 24,000
6 Wall Panelling 1 UNIT 7.6 x 7' 24,000
7 Overhead Cabinet 1 UNIT 7' x 2.6 36,000
TOTAL
F MASTER BEDROOM
1 Bed ( hydrolics + headboard Cushionning) 1 UNIT 6' x 6.6 40,000 + 8,000 + 8,000
2 Side table 1 UNIT 1 nos 9,000
3 Bed Panelling 1 UNIT 14'8'' x 9.6 40,000
4 Wardrobe 1 UNIT 8' x 7' 80,000
5 Dressing table 1 UNIT 3' x 7' 28,000
6 Overhead Cabinet 1 UNIT 14.8 x 2.6 45,000
7 T.V. Unit (+ electric fitting) 1 UNIT 6' x 6' 38,000 + 4,000
TOTAL
G WALKING WARDROBE ROOM
1 Old Door Should be Sliding tucked and conceilied 1 UNIT
2 Wardrobe 1 UNIT 5' x 7' + 4'6'' x 7' 55,000 + 48,000
3 Wardrobe loft 1 UNIT 5' x 2.6 + 4.6 x 2.6 38,000
4 Basin Counter only in 3 bathroom 1 UNIT 12,000 x 3 36,000
TOTAL
LOADING & UNLOADING OF ALL INTERIOR MATERIAL (GROUND
NOTE
TO 13TH FLOOR WITH LABOUR)
SUB TOTAL 1
5% SERVICE CHARGES INCLUDES : INNOVATIVE & CONCEPTUAL
DESIGNING, THEME BASED DESIGNING, MAPPING, PLANNING,
SERVICE CHARGES OF
NOTE 1 SITE VISITS, SUPERVISION, ORGANISING TECHNICAL
INTERIOR DESIGNER
WORKFORCE, PROCURING INTERIOR MATERIAL, LAMINATION
SELECTION
SUB TOTAL 2
EXTRA WORK IS NOT INCLUDED GRAND TOTAL
NOTE 2 5% EXTRA SERVICE CHARGES FOR BENEFITS OF 2D & 3D VIEW: IF REQUIRED
Terms & Conditions
25 %NOTE
WILL 3BE DEDUCTED IF ANY LISTED FINALISED INTERIOR ITEM IS CANCELLED BY CLIENT
COMPANY SUPPLY RAW MATERIAL IN EXCESS ON SITE TO
COMPLETE THE INTERIOR WORK , AFTER COMPLETION OF
NOTE 4
LISTED INTERIOR PRODUCT ITEMS , THE REMAINING RAW
MATERIAL IS THE PROPERTY OF COMPANY
AFTER THE COMPLETEION OF INTERIOR WORK , THE SHOOTING
NOTE 5 OF ALL INTERIOR WORK WILL TAKE PLACE , WHICH WILL BE
UPLOADED IN COMPANY'S SOCIAL PLATFORMS
ALL FURNITURES WILL BE CUSTOMISED AND DESIGNED BY
NOTE 6 INTERIOR DESIGNER WITH MAPPING AND PLANNING OF
INTERIOR DESIGN WORK WILL BE DONE ON TURNKEY PROJECT .
INTERIOR WORK DESIGN ONCE FINALISED WILL NOT BE
CHANGED , IF ANY CHANGE IN DESIGN IS REQUIRED BY
NOTE 7
COSTUMER , THEN EXTRA PAYMENT WILL BE CHARGED FOR
MATERIAL AND LABOUR CHARGES.
ELECTRIC FITTING WILL BE ONLY PROVIDED FOR T.V. UNIT AND
NOTE 8
POP RELATED LIGHTS & BUTTONS ONLY
IF ANY ITEM IS CANCELLED BY CLIENT FROM THE FINALISED
COSTING LIST THANT THE PRODUCTION / SUPPLY OF
NOTE 9
COMPLIMENTARY INTERIOR ITEMS WILL BE CANCELLED, HENCE
IT WILL BE NOT PROVIDED TO THE CLIENT.
IF THE ADVANCE PAYMENT CHEQUES ARE NOT CREDITED /
CLEARED BY CLIENT’S BANK ON THE PAYMENT SCHEDULED
DATES AGREED UPON THE AGREEMENT, THEN ADDITIONAL 2
DAYS WILL BE GRANTED TO THE CLIENT TO RESOLVE THE
NOTE 10
PAYMENT ISSUE, OTHERWISE RESULTING IN A STOP OF
PRODUCTION / SUPPLY OF THEIR INTERIOR & FURNITURE WORK,
AS THE MATERIALS & LABOUR PAYMENTS ARE DONE BY
RECIEVED / PAID CLIENT PAYMENTS ONLY.
IF EXTRA WORK ADDS IN THE MAIN FINAL COSTING, THEN THE
NOTE 11 SERVICE CHARGES WILL BE INCREASED AS PER THE FINAL
COSTING
MATERIAL SPECIFICATION: WE WILL BE USING M R GRADE
ALTERNATE PLY : 18MM FOR STRUCTURE, 12MM FOR BACK
PANELLING, 19MM FOR OPENABLE WARDROBES OF HARDWOOD,
NOTE 12
25MM FOR SLIDING WARDROBE, 0.8MM MICA/ LAMINATE, 0.8MM
INNER & OUTER LAMINATE, BWP PLY, HINGES: GODREJ
COMPANY: SOFT CLOSE, CHANELLS: GODREJ REGULAR

You might also like