0% found this document useful (0 votes)
54 views1 page

Ventilation Plan for Hot/Cold Work

Uploaded by

asapfordocuments
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Ventilation Plan for Hot/Cold Work

Uploaded by

asapfordocuments
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

E-8201

Equip
Tag No: E-8201Ventilation plan(Hot / Cold work)
S/NO ACTIVITIES
1 Equipment Dimensions Qty Unit
1.1 Internal Diameter 3.8 M
1.2 Length 20 M
1.3 Calculated Volume 227 M3
2 Standard Requirements Qty Unit
2.1 Air Exchange Per Hour (ACH) 10 times
2.2 Air Exchange Volume Per Worker For Active Cold Work 84 M3/h
2.3 Air Exchange Volume Per Active Hot Work Person for Active Hot Work 3600 M3/h
3 Standard Air Flow of Blowers Qty Unit
3.1 24" Air Blower @ 80 psi 28713 M3/hr
M1 24"
3.2 20" Air Blower @ 80 psi 18689 M3/hr
3.3 12" Air Blower @ 80 psi 3636 M /hr
3

3.4 16" Air Blower @ 80 psi 8241 M3/hr


3.5 6HP Eductor for (6" - 8" flanges) @ 80 psi 7645 M3/hr
3.6 3HP Eductor for (2" - 4" flanges) @ 80 psi 2888 M3/hr
4 For Confined Entry works Qty Capacity Unit
4.1 Minimum flow rate required for 10 ACH 2270 M3/hr Volume 227 M3
4.2 Total number of workers (cold work) 2 168 M3/hr
4.3 Total number of welders/cutters (hot work) 1 3600 M3/hr
4.4 Minimum flow rate required for Active work (4.2+4.3) 3768 M3/hr
ID - 3.8 M
4.5 Flow required for Confined Space Works 3768 M3/hr L - 20M
5 Total Air Flow Available Qty Unit
5.1 Number of 24" Air Blower/eductor 0 M3/hr
5.2 Number of 20" Air Blower/eductor 0 M3/hr
5.3 Number of 12" Air Blower 0 0 M3/hr
4.3 Number of 16" Air Blower 1 8241 M3/hr
5.4 Number of 6HP Eductor for (6" - 8" flanges) 0 M3/hr
5.5 Number of 3HP Eductor for (2" - 4" flanges) 0 M3/hr
5.6 To Manually Input Airflow if Ducting is used. Refer to Table Below M3/hr
5.8 Total Air Flow Available 8241 M3/hr
6 Does Proposed Ventilation Meet Minimum Requirements?

6.1 Total Ventilation in the confined space area is > requirement -Factor>1
OK 2.19
Legend:
To be filled by user
Calculated value
Not applicable

N2-64''

EXXX Job Description as in TA Scope Master List

Ventilation Plan at Nozzles

SL NO WORK PHASE REMARKS


M1 N2

1 Initial Ventilation 16''HP Eductor

2 Entry at M1 & N2 16''HP Eductor