Part D
Part D
PART – D
Schedule of Quantities
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 278
INDEX- PART-D
1 INDEX 277
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 279
ABSTRACT OF COST
Name of Work: Providing repairs to existing plumbing, drainage, tile flooring, doors
and ducts including internal electrical installations etc in Kakatiya Hall of Residence
(1.0K) at NIT Warangal-Reg. Complete Renovation of toilet, bathrooms, shafts and
approximately 60 damaged Hostel Rooms.
Civil Component
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 280
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 281
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 282
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 283
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 284
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 285
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 286
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 287
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
250x16 mm
6.3.1 550.00 Each 265.41 145975.50
250x10 mm
6.4.1 55.00 Each 117.28 6450.40
Providing and fixing aluminium
handles ISI marked, anodised (anodic
coating not less than grade AC 10 as
per IS : 1868) transparent or dyed to
6.5 required colour or shade with
necessary screws etc. complete :
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 288
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
125 mm
6.5.1 1050.00 Each 67.47 70843.50
Providing and fixing aluminium work
for doors, windows, ventilators and
partitions with extruded built up
standard tubular sections/ appropriate
Z sections and other sections of
approved make conforming to IS: 733
and IS: 1285, fixing with dash
6.6 fasteners of required dia and size,
including necessary filling up the
gaps at junctions, i.e. at top, bottom
and sides with required EPDM
rubber/ neoprene gasket etc.
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 289
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 290
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Sub-Head 8 : FLOORING
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 291
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 292
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 293
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 294
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Sub-Head 9: FINISHING
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 295
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 296
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Two coats.
9.9.1 6500.00 Sqm 145.43 945295.00
Sub-Head 10 : DISMANTLING AND DEMOLISHING
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 297
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 298
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
15 mm to 40 mm nominal bore
10.8.1 300.00 meter 152.57 45771.00
Above 40 mm nominal bore
10.8.2 200.00 meter 164.38 32876.00
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 299
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 300
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 301
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Flexible pipe
11.4.1
32 mm dia
11.4.1.1 260.00 Each 121.75 31655.00
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 302
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 303
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
110 mm dia.
11.10.1 12864.00 metre 402.82 5181876.48
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 304
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 305
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 306
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
12.4.1 45 cm length
150 mm diameter
12.5.1 180.00 Each 226.45 40761.00
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 307
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 308
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 309
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 310
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 311
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Size 120x90 cm
13.4.2
With common burnt clay F.P.S. (non
13.4.2.1 modular ) bricks of class designation 1.00 metre 10780.68 10780.68
7.5
Sub-Head 14 : WATER PROOFING
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 312
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 313
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 314
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 315
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 316
Rate Incl
Cost
Index
Item
Description of item Qty Unit @4.67%& Amount
No
GST
factor
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 317
Electrical Component
S. Description Total
No. Qty Rate Unit Amount
1 Wiring for light point/ fan point/
exhaust fan point/ call bell poin.t with
1.5 sq. mm FRLS PVC insulated
copper conductor single core cable in
surface I recessed medium class PVC
conduit, with modular switch, modular
plate, suitable Gl box and earthing the
point with 1.5 sq. mm FRLS PVC
insulated copper conductor single core
cable etc. as required.
1.1 Group A
1176 1097.00 Point 1290072.00
2 Supplying and fixing of following
sizes of medium class PVC conduit
along with accessories in
surface/recess including cutting the
wall and making good the same in case
of recessed conduit as required.
2.1 20mm
600 138.00 Metre 82800.00
2.2 25mm
400 157.00 Metre 62800.00
3 Supplying and drawing following sizes
of FRLS PVC insulated copper
conductor, single core cable in the
existing surface/ recessed steel/ PVC
conduit as required.
3.1 3 x 1.5 sq. mm 800 102.00 Metre 81600.00
3.2 3 x 4 sq. mm 200 223.00 Metre 44600.00
4 Supplying and fixing following
modular switch/ socket on the existing
modular plate & switch box including
connections but excluding modular
plate etc. as required.
4.1 15/16 amp switch (For Geyser) 42 168.00 Each 7056.00
4.2 6 pin 15/16 amp socket outlet (For
Geyser) 42 213.00 Each 8946.00
5 Supplying and fixing following size/
modules, GI box along with modular
base & cover plate for modular
switches in recess etc as required.
5.1 1 or 2 Module (75mmX75mm) 84 322.00 Each 27048.00
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 318
S. Description Total
No. Qty Rate Unit Amount
5 Supplying and fixing following size/
modules, GI box along with modular
base & cover plate for modular
switches in recess etc as required.
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 319
S. Description Total
No. Qty Rate Unit Amount
10 Dismantling of Following existing
fluorescent fitting, GI boxes/ PVC
boxes, and Exhaust Fans etc.
including shifting of dismantling
materials from site to Client
Department store and transportation,
loading, unloading etc. complete as
required. 1 30000.00 Job 30000.00
Total 3082594.00
Corrections/Omissions/Insertions – NIL AE EE
PART ‘D’ – 320
Name of Work: Providing repairs to existing plumbing, drainage, tile flooring, doors
and ducts including internal electrical installations etc in Kakatiya Hall of Residence
(1.0K) at NIT Warangal-Reg. Complete Renovation of toilet, bathrooms, shafts and
approximately 60 damaged Hostel Rooms.
ABSTRACT OF COST
Name of the Contractor
Percentage % in Total
above or Figures Cost
S.No. Name of Component Estimated Cost
below the
estimated cost
1 Composite Tender Rs. 7,01,90,472/-
Civil Rs.. 67107878.00
Electrical
Rs.3082594.00
Important Note:
1. The estimated cost of tender has been worked out by taking into consideration the
cost index of Warangal for DSR 2023 items, DSR 2022 (E&M Works) and market rates
for NSR items. The Delhi Schedule of Rate 2023 items rates, and GST @ 18% for
construction works as per the latest guidelines of G.O.I., therefore are adjusted
accordingly.
3. If the percentage quoted is not clear, or if the rate is not quoted in percentage, the
tender shall be treated as invalid and will not be entertained as lowest tenderer.
Corrections/Omissions/Insertions – NIL AE EE