0% found this document useful (0 votes)
95 views4 pages

Significant Ships 2005 Extract

Uploaded by

viralisurs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views4 pages

Significant Ships 2005 Extract

Uploaded by

viralisurs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

HATSU SHINE: a 'green' ship for

Evergreen's UK-flag operations


Shipbuilder:.......Mitsubishi Heavy Industries Ltd Another 'green' feature is the choice of electric drive Number ............................................................................1
for the deck machinery to eliminate possible oil leakage Type of fuel used ..............................................HFO/MDO
(Kobe yard), Japan Output/speed..................................54,900kW/100rev/min
Vessel's name: .................................Hatsu Shine from hydraulic alternatives. Propeller
Hull number: ..............................................S1265 The propelling machinery comprises a Sulzer Material ......................................Nickel-aluminium-bronze
10RTA96C main engine, constructed by the shipbuilder Designer/manufacturer .........Mitsubishi Heavy Industries
Owner/operator: ...............MCC Leasing (No 24) and developing 54,900kW MCR at 100rev/min. The FP Number ............................................................................1
Ltd/Hatsu Marine Ltd, United Kingdom propeller, also a Mitsubishi product, is fitted with a Hub Pitch ..........................................................................Fixed
Designer:..........Mitsubishi Heavy Industries Ltd, Vortex Free Cap, and drives the ship at a service speed Speed...............................................................100rev/min
Special adaptations ........................Hub Vortex-Free Cap
Japan of 25.30knots. The four diesel-driven alternator sets are Diesel-driven alternators
Flag: ..........................................United Kingdom positioned in pairs, port and starboard, and have an Number ............................................................................4
Total number of sister output of 2900kW each, with the number of sets Engine make/type ..........................................MAN B&W/-
ships already completed:..............................Nil operational selected in relation to the demands of the Type of fuel used ..............................................HFO/MDO
Total number of sister 839 reefer boxes carried. Output, each set ...................................................3090kW
In terms of structural design, Hatsu Shine and her Alternator make/type ........................................................-
ships still on order: ..........................................9 three sisters conform with Lloyd's Register's ShipRight Output, each set ...................................................2900kW
notations (with six later sisters for Evergreen classed Mooring equipment
with ABS and having equivalent qualifications) and a Number ................................2 x mooring winch/windlass;
ATSU SHINE is the first of 10 new 'S-class'
H container liners building for the Taiwan-based
Evergreen Group, the first four of which will be
fatigue life of over 30 years. The single deck is without
a forecastle, with cargo protection provided by a slight
sheer forward, and a breakwater in front of No 1 hatch.
6 x mooring winch
Make .....................................................................................-
Lifesaving equipment
operated by Hatsu Marine Ltd, the UK-flag subsidiary. A sunken mooring deck is arranged aft with container Number/type.................................2 x 27-person lifeboats
In essence, these vessels present the now standard large stowage above. Hatch covers
container-ship configuration, varied, perhaps, by All holds can load dangerous cargoes, with the more Design/manufacturer.............Mitsubishi Heavy Industries
having only six cargo holds forward of the machinery extreme varieties carried in Nos 1 and 2. High-type Type ....................................................................Pontoons
space and superstructure, and two aft; however, the lashing bridges are fitted on deck allowing 17 rows/8 Containers
design becomes significant when the 'green ship' tiers to be accommodated there, with 15 rows/9 tiers in Lengths........................................................20ft, 40ft, 45ft
the holds. Total TEU capacity is 7024, with 4000 carried Height...........................................................8ft 6in; 9ft 6in
approach of builder and owner is considered. on deck and 3024 below. Five-panel pontoon hatch Cell guides ...................................................................Yes
Notably, the double-hull layout extends over the covers close most of the cargo holds. Total TEU capacity.....................................................7024
entire ship, and fuel tanks are either arranged on deck ................................................................4000
transversely between the holds, or under the narrow in holds .................................................................3024
compartments forward and aft, but above the tanktop, Reefer plugs ................................................................839
to minimise grounding spills. Larger holding tanks than TECHNICAL PARTICULARS
Length, oa .................................................................300.00m Tiers/rows, maximum
usual are provided for bilge and grey waters, and a large on deck .......................................................................8/17
Length, bp.................................................................285.00m
capacity oily-water separator ensures compliance with Breadth, moulded .......................................................42.80m in holds .......................................................................9/15
MARPOL requirements. An 'air-space' sterntube seal is Depth, moulded ..........................................................24.20m Complement
fitted to avoid leaks from the propeller shaft, and special Draught, moulded, design/scantling ..........................14.20m Officers.............................................................................8
rooms are provided to store galley and other waste prior Gross .......................................................................75,246gt Crew...............................................................................10
to incineration, in line with an EP notation. Deadweight ............................................................78,693dwt Spare................................................................................9
Features of the 'green' characteristics for the Speed, service.......................................................25.30knots Special rudder ..................................................Reaction type
machinery installation are the low NOx emissions from Bunkers Bow thrusters.........................................................................2
both main and auxiliary engines, and an ability to switch heavy oil.................................................................8848m3 Fire extinguishing system
to low-sulphur fuel, with a dedicated tank fitted for this diesel oil...................................................................587m3 Cargo holds.................................................................CO2
purpose. The problem of exhaust emissions in port is Water ballast.............................................................27,349m3
Engineroom...........................................Total flooding CO2
Fuel consumption
dealt with by adopting a so-called 'cold ironing' main engine only ..................................210.50tonnes/day Make .................................................................................-
arrangement. Also known as the AMP (Alternative Classification .................Lloyd's Register+ 100A1, Container Radars
Marine Programme), this system is in use in Los Ship, ShipRight (SDA, FDA, CM), Number ............................................................................3
Angeles and other US west coast ports, and allows the *IWS, L1, EP, + LMC, UMS Models.....................1 x ARPA X-band: 1 x ARPA S-band
ship's alternators to be completely shut down, with port Heel control system...................................Automatic transfer 1 x X-band
Main engine
demands satisfied by bringing a 6.6kV electrical supply Design......................................................................Sulzer
Integrated bridge system ..................................................Yes
on board by cable and converting it to the ship's 440volt Model ................................................................10RTA96C Contract date......................................................23 July 2003
supply (a special reel is fitted on deck for this purpose). Manufacturer .........................Mitsubishi Heavy Industries Launch/float-out date......................................23 March 2005

56 SIGNIFICANT SHIPS OF 2005


HATSU SHINE

SIGNIFICANT SHIPS OF 2005 57


WAN HAI 501: CSBC delivers 4250TEU
box ship to local owner
Shipbuilder:...........................China Shipbuilding 720rev/min. A rudder skeg is fitted aft, and a 1600kW Mooring equipment
Corp (CSBC), Taiwan thruster, also by Nakashima, is installed at the bow. Number/type ....................2 x mooring winch/windlasses,
Vessel's name: ................................Wan Hai 501 6 x mooring winches
Hull number: ..................................................835 Make .........................................................Nippon Pusnes
Owner/operator: .......Wan Hai Lines Ltd, Taiwan TECHNICAL PARTICULARS Type ........................................................Electro-hydraulic
Designer:........China Shipbuilding Corp, Taiwan Length, oa .................................................................268.80m Hatch covers
Flag: ....................................................Singapore Length, bp.................................................................256.50m Design ...................................MacGregor lift-off pontoons
Total number of sister Breadth, moulded .......................................................32.20m Manufacturer............................................................CSBC
ships already completed:................................4 Depth moulded ...........................................................19.20m Containers
Total number of sister Width of double skin Lengths........................................................20ft; 40ft; 45ft
ships still on order: ..........................................4 side ..........................................................................1.96m Cell guides ...................................................................Yes
bottom ......................................................................1.80m Total TEU capacity.....................................................4252
Draught on deck ................................................................2636

T HIS latest example of China Shipbuilding's


container ship designs has been developed from
that of a similar, 4050TEU vessel (delivered recently to
design ....................................................................11.00m
scantling ................................................................12.50m
Gross .......................................................................42,579gt
in holds .................................................................1616
homogeneously loaded to 14tonnes ...................2850
reefer plugs .....................................................400TEU
German owner Peter Döhle, a regular customer of the Deadweight Tiers/rows
Kaohsiung shipyard), and is the first of a new series to design ...............................................................41,463dwt on deck .................................................................8/13
join the fleet of a local operator, Taipeh-based Wan Hai scantling............................................................52,146dwt in holds ..................................................................7/11
Lines, whose trading area is centred around South East Speed, service, 90% MCR, 15% sea margin .......24.40knots Ballast control system
Asia, and for whom a number of special requirements Bunkers Make........................................................................Shinko
have been included in the design. heavy oil.................................................................5157m3 Type .......................................................Electric-hydraulic
The hull is arranged with a double skin, and features diesel oil… ...............................................................309m3 Complement
six cargo holds forward of the deckhouse and one aft. Water ballast….........................................................13,008m3 Officers...........................................................................12
The single deck is fitted with a forecastle which has a Fuel consumption Crew...............................................................................11
5m high breakwater at its aft end, giving protection to main engine only ....................................133.6tonnes/day Suez crew ........................................................................6
the 2656 containers carried on deck. To maximise this Classification ....Det Norske Veritas +1A1, Container Carrier, Rooms .................................................................23 single
total, eight tiers of containers can be loaded at the EO, TMON, Nauticus-Newbuilding, CR, 100 Stern appendages .............................................Rudder skeg
house front, reducing to five forward, and the +E, Container Carrier, CMS, CAU + Bow thruster
superstructure has been increased in height to meet Percentage of high-tensile Make.....................................Nakashima Propeller Co Ltd
SOLAS regulations governing line of sight over the steel used in construction .................................approx 50% Number ............................................................................1
bow. Main engine Output ...................................................................1600kW
Because of this extra height, two tiers of lashing Design ..............................................................MAN B&W Bridge control system
bridges have been installed between the stacks, a feature Model ...............................................................8K90MC-C Make...................................................................Nabtesco
which also permits stack loadings for TEU/FEU to Manufacturer ........................................................Hyundai Type .........................................................................M-800
increase to 80/120tonnes. Eleven rows, and five tiers of Number ............................................................................1 One-man operation .......................................................No
normal boxes, plus two tiers of high-cube units, can be Type of fuel used........................................................HFO Fire detection system
accommodated in the holds which are of girderless Output .............................................36,560kW/104rev/min Make..............................................................Nohmi Bosai
construction. Connections are available for 400FEU, Propeller Type .......................................FAC512B-20L addressable
loaded in the first three tiers above deck, to be Material ......................................Nickel-aluminium-bronze Fire extinguishing systems
Cargo holds/engineroom.....................high-pressure CO2
refrigerated, and facilities are available for dangerous Designer/manufacturer .........................CSBC/Nakashima
Make .................................................................NK Co Ltd
goods, excluding IMDG class 1, to be carried in holds Number ............................................................................1
Radars
three to five. As well as the usual TEU and FEU boxes, Pitch ...........................................................................fixed
Number ............................................................................3
Wan Hai 501 is equipped to carry 45ft containers in the Diameter ..............................................................8000mm
Make............................................................................JRC
bays above the upper deck, right aft. Speed...............................................................104rev/min
Models ........................................JMA-9933-SA/9932-7XA
As with many CSBC designs, particular attention has Diesel-driven alternators
Integrated bridge system
been paid to propeller performance and consideration Number .........................................………………………..3
Make............................................................................JRC
of cavitation and force control. The weight of the Engine make/type ..............................Yanmar/8N280L-ZV
Waste disposal plant
propeller has also been optimised, resulting in good Type of fuel used........................................................HFO
Incinerator
vibration performance. The main engine is of the MAN Output/speed each set......................2398kW/720rev/min
Make ..............................................................KangRim
B&W 8K90MC-C design, built by Hyundai and Alternator make/type.............................Taiyo/FEK 70A-10
Model .........................................................KIN-80SDA
developing 36,560kW at 104rev/min. The propeller, Output/speed each set......................2280kW/720rev/min
Sewage plant
designed by the shipbuilder and manufactured by Boilers Make ..........................................................Hamworthy
Nakashima is of the FP type and at 90% MCR and with Number/type ..................................1 x vertical composite Model ...................................................................ST2A
a 15% sea margin, drives the ship at 24.40knots. Model ...............................................................MC351R24 Contract date .....................................................19 May 2003
Electrical supply comes from three Yanmar/Taiyo Make ...................................................................KangRim Launch/float-out date ........................................23 April 2005
diesel-alternator sets, each producing 2280kW at Output ...............................................3000kg/h, each side Delivery date ......................................................22 July 2005

SIGNIFICANT SHIPS OF 2005 123


WAN HAI 501

124 SIGNIFICANT SHIPS OF 2005

You might also like