0% found this document useful (0 votes)
32 views4 pages

08 - Commencement of Works

commencement of works
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
32 views4 pages

08 - Commencement of Works

commencement of works
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
DBL-AHC (JV) yActs HOLDING DILIP BUILDCON LIMITED Ref: No. DBL-Site/NHAI/ Delhi-Vadodara/2020-21/08 Dated: 27-02-2021 To, The Project Director NHAI PIU Kota, A504, Indira Vihar Talwandi, Kota, Rajasthan 324005 Construction of Eight Lane access controlled Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch. 419.000 - 427.300) section of Delhi - Vadodara Green field Alignment (NH- 148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode ~ Commencement of Works - Reg. Kind Attention: - Shri. JP Gupta Ref: 1) Chief Wildlife Warden, Jaipur letter no. F ( ) WLC/CWLW/2019/8629 dated 21.12.2020. 2) MoEF&CC, RO-Jaipur letter No, BaIATHO/ 06/22/2020 /48 dated 24.12.2020 3) Authority's letter No, 63001/148N/Pkg-15/DBL-AHC/1/2020/2553 dated 15.02.2021 Dear Sir, This has reference to the letter 3" cited vide which the Authority has informed the status of Land Acquisition and the status of clearances to be obtained for the project. In this regard, the Concessionaire would like to submit the following: 1) As per Annex II of Schedule A of the Agreement, the width of Full Right of Way from Km. 419+000 to Km.427+300 is stipulated as 100m, However, the Authority, in the letter under Ref(3), has stated that the ROW from Km422.284 to Km.426.141 is 70m., which is less than the width (of 100m.) stipulated in Schedule A of the Agreement. Kindly clarify. 2) The Authority has stated that the land acquisition is done for 57.8455 Ha. and 3G is done for Rs.17,00,69,248/-. In this connection, the Authority is requested to provide the status of availability of hindrance free and vacant access to ROW in terms of the length (available in full width of ROW) of Project highway in accordance with the provisions of clause 3.1{(ti) (a) of the Agreement. 3) The Authority has informed that'the Forest and Wildlife clearance is in progress and the working permission is being pursued with the Forest Department. Kindly inform the status of permission required for felling of trees in the Forest Area, 4) The Authority has informed that itis in the process of obtaining the applicable permit for felling of trees in the non-forest area. Kindly inform the of permission required for felling of trees in the Forest Area. DBL-AHC QV) Page 1 of 2 Plot No-5 Inside Govind Narayan Singh Gate, Chuna Bhatti, Kolar Road Bhopal 4029999 Mob: 9300948396, Fax : 0755-40299" Email: db@dilipbuildcon.co.in, kundankdas@dilipbuildcon.co.in (P) Ph.-0755- 5) The Agreement for the captioned project was entered into between the Authority and the Contractor on 27.01.2021. As per clause 3.1 (Ili) of the Agreement, the Authority is obligated to provide no less than 90% of the required ROW of the Construction zone of the total length of the Project Highway within a period of 30days from the date of Agreement, which shall be in contiguous stretches of length not less than 5Km. The said 30day period is lapsing on 26.02.2021. Therefore, the Authority is requested to expedite the procurement of land and required permissions. 6) The Authority has informed that the Authority's Engineer is appointed on 12.02.2021. Kindly provide the expected date of mobilization of the Authority Engineer. Your response in the matter is solicited at the earliest. ‘Thanking you and assuring you the best of our services at all times, Yours faithfully, For and on behalf of Dilip Buildcon Limited - “ALTIS -HOLDING” CORPORATION (JV) Hajeev P (Authorized i Copy To: 1) The Regional Officer, Regional Office Jaipur, National Highway Authority of India, F-120, Janpath, Shyam Nagar, Jaipur-302 019, Rajasthan. Page 2 of 2 ~ © opsi-ancgy) gyasts DUIRANRUCTUNES BOND Refi No, DBL-Site/NHAI/ Delhi-Vadodara/2020-21/08 Dated: 27-02-2021 To, The Project Director NHAI PIU Kota, PEN A504, Indira Vihar ae Talwandi, Kota, Rajasthan 324005 Sub:- Construction of Eight Lane access controlled Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch. 419.000 - 427,300) section of Delhi - Vadodara Green field ‘Alignment (NH- 148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode - Commencement of Works ~ Reg. Kind Attention: - Shri. JP Gupta Ref: 1) Chief Wildlife Warden, jaipur letter no. F ( ) WLC/CWLW/2019/8629 dated 21.12.2020. 2) MoEFACC, RO-Jaipur letter No. 8#/€T50/ 06/22/2020/0 #49 dated 24.12.2020 3) Authority's letter No. 63001/148N/Pkg-15/DBL-AHC/1/2020/2553 dated 15.02.2021 Dear Sir, This has reference to the letter 3 cited vide which the Authority has informed the status of Land Acquisition and the status of clearances to be obtained for the project. In this regard, the Concessionaire would like to submit the following: 1) As per Annex II of Schedule A of the Agreement, the width of Full Right of Way from Km, 419+000 to Km.427+300 is stipulated as 100m. However, the Authority, in the letter under Ref(3), has stated that the ROW from Km.422,264 to Km,426.141 is 70m, which is less than the width (of 100m) stipulated in Schedule A of the ‘Agreement. Kindly clarify. 2) The Authority has stated that the land acquisition is done for 57.6455 Ha. and 3G is done for Rs.17,00,69,248/-. In this connection, the Authority is requested to provide the status of availability of hindrance free and vacant access to ROW in terms of the length (available in full width of ROW) of Project highway in accordance with the provisions of clause 3.1(li) (a) of the Agreement. 3) The Authority has informed that'the Forest and Wildlife clearance is in progress and the working permission is being pursued with the Forest Department. Kindly inform the status of permission required for felling of trees in the Forest Area, 4) The Authority has informed that it is in the process of obtaining the applicable permit for felling of trees in the non-forest area. Kindly inform the sfqtus.of permission required for felling of trees in the Forest Area. oe wal A is LP) Ph.-0755- DBL-AHC (JV) Page 1 of 2 Plot No-5 Inside Govind Narayan Singh Gate, Chuna Bhatti, Kolar Road Bhopal 4029999 Mob: 9300948396, Fax : 0755-4029998 Email: db@dilipbuildcon.co.in, kundankdas@dilipbuildcon.co.in UMMEDPURA NAYAGAON TUNNEL nore neon DBL letter no. 008 - Commencement of Works- Reg ‘1 message UMMEDPURA NAYAGAON TUNNEL Sat Fob 27, 2021 at 8:53 AM To: kota@nhai.org, kotaplu@gmeil.com, ro.jaipur@gmail.com Co: RAJEEV PATHANIA , SATISH KUMAR KRISHNAMURTHY , CONTRACT DC 1181 Dear Sir, Please find the attached DBL letter no, DBL-Site/NHAV/ Delhi: Vadodara/2020-21/08 - Commencement of Works~ Reg ‘This is for your information and further needful please Thanking you, Site Office DBL-AHC JV Ummedpura-Nayagaon - Tunnel DBL-Site-08 - Commencement of Works Reg.pdf 632K

You might also like