Haryana Rera

Uploaded by

kshama.hco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views2 pages

Haryana Rera

Uploaded by

kshama.hco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

HARYANA REAL ESTATE REGUTATORY

HAREBA AUTHORITY GURUGRAM


W* GURUGRAM ofuqrw Wiqil frfrqTqf, qTftfr--rq Uu-qrq-
*w PWD Rest House, Civil Lines, Gurugram, Haryana rufr.sq.S. EgflcTd, frf*offi, Uuqrq,

HARERA/GGM/RPrN/728
28.03.2024

Haryana R.eal Estate negulatoiy M/s DLF Limited.


Authority, Gurugram 3"d Floor, Shopping Mall, Ariun Nagar Marg, DLF
City, Phase 1, Gurugram, Haryana TZZOOZ

Sub: Registration of the group housing project namely "DLF privana


west,,admeasuring
12'5720 acres situated at sector 76 &77, Gurugram - removal
of deficiencies in the
application and clarifications thereof.
with reference to your application having temp project ID: REM-GRG-PR0I-154
0-2024
regarding registration of the group housing project namely "DLF privana
west,, admeasuring
1'2'5720 acres situated at Sector 76 &77,Gurugram,
submitted in the Authority on2g.02.2024
under Section 4 of the Real Estate (Regulation and Development)
Act, 201.6,l have been
directed to intimate that on scrutiny of application, the
following deficiencies have been
observed which are as follows: -

7. Fee cannot be calculated as the building plans


are not submitted and will be calculated after
the submission of the building plans and if the fee comes
out deficit than the same shall be
payable.
2. The annexures in the online application
are not uploaded as well as correction needs to be
done in the online [A-H) application.
3. Online DPI needs to be corrected.
4. The approved building plans are not attached
in the application to ascertain the approval of
phasing by the competent authority, and you rraa
apprieJ for registratio, oi iroject in
phases. The same needs to be clarified.
5. Building plan approval
[BR-lll) alongwith the approved drawings need to be submitted.
6. Environment Clearance needs to be submitted.
7. Fire Scheme approval needs to be submitted.
If applied, then copy of the same needs to be
submitted.
B. Approved service plan and estimates
needs to be subnritted. If applied,
'rr----' then copy of the
same needs to be submitted.
9. Approval Noc's from various agencies for
connecting external services like road needs to
be submitted.
10. Layout plan superimposed on the demarcation plan
needs to be submitted.
11. Draft Allotment Ietter needs to be revised.
12. Draft Builder buyer agreement needs to be revised.
13. Mining permission needs to be submitted,
14. Draft brochure needs to be revised.
15. COI needs to be submitted.
16. Form CHG -1 needs to be submitted.
17. Amount of land cost as per sale deed is not
match with Dpr. Need to be clarify.
18. REP-Il needs to be revised as occupancy date
does not mention.
L9. Challan copy of paid IDC, EDC nu"ds to -be provided.

Email : hareraeunrgram@gmail.com, reragurugram@gmail.com,


website : www.harera.in
An Authoritv constiii:teduna;.i;;;;;A ,i,ifti "q".r"E?ii.c"i;,1;n'aird Deueropment) Act, 2016
{-nr, frft#'
"r
qrra"H#i'fAffi:":1,1'dT.ifl ffi\*
o1 fr-se em qrfr" rd, 6sT irftffi-ffi', ;''
srft-rsr
1.
ffi UARERA
ffi GURUGRAM
not match with DPI'
as project financial details are
20. Proiect report needs to be revised
REP I'
21.. CAcertificate required for
22. CAcertificate io. N.t worth of promoter needs to be submitted. as
same to be 70% collection account
to U. upa'itd for specifying
23. Board ..rotutiJn
"..a,
relating to lawsuits filed
,- i::Itr*tTTro,,"r,s report company has uncertainry outcome
on ongoing arbirration
,, 1?:;T,:ir;"ffff1.,, ..ro., company has consequential impact
andlitigation."tNcLTw'r.tjointventurecompanyanduncertaintiesrelatingto
value of loan in the aforesaid
joint venture.
recoverability of company,s net .,.'vine

Thedeficienciesconveyedvidethisnoticearepreliminaryandnotexhaustiveinnature.Youare of hearing also'


remove/ rectify the deficiencies which are noticed during the course
also liable to
noted
within a period of 15 days. It may be
you are advised to remove the deficiencies/observations hearing i'e',
fixed for the
your repry is not received at least three days before the date
that in case your attention is further invited to section-
your case may not be listed for hearing.
22.O4.Z',4then Rule-S of the Haryana Real Estate
and Development) Act 2016 and
5 of the Real Estate (Regulation in
Rules, your application is liable to be reiected
[Regulation and Development) lqi] :gwhich
30 days'
.rr., th. deficiencies are not cleared within

tary
Haryana Real Estale Regulatory
Authority'
\,:I
Gurugram
1

"1"

R*^^4-
ff^^"{
*; 1(18E,',o07

ft Htr#gtr$ff 3o'u
&'"i:.'Tililffi
AnAuthoritvconstitutedrE,'N'Jg.gi;g***i*,1*m+mqtudcrfr'{sr "XT',ift

q-riua,ffiHffi*;;:,;,iffi'ffi