0% found this document useful (0 votes)
204 views37 pages

Advanced Production Integration: Rohela Khan

Production integration

Uploaded by

Ravi Ranjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
204 views37 pages

Advanced Production Integration: Rohela Khan

Production integration

Uploaded by

Ravi Ranjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

ADVANCED PRODUCTION INTEGRATION

There are 3 types of manufacturing process followed in SAP Production Planning:

1)Discrete Industry
2) Process Industry
3)Repetitive Industry

DISCRETE INDUSTRY MANUFACTURING PROCESS

In discrete scenario, the manufacturing process is based on production orders. Discrete


manufacturing is characterized by requirements that occur on an irregular basis and a
workshop-oriented process. Basically, the demand and supply varies time to time in this
scenario.

Discrete manufacturing forms an industry type where in the products which are
manufactured can be easily assembled and dis-assembled. They can be reworked upon
easily to a large extent. You can say making pumps, engines, cars, airplanes.
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more

PROCESS INDUSTRY MANUFACTURING PROCESS

The component Production Planning for Process Industries (PP-PI) provides an


integrated planning tool for batch-oriented process manufacturing. It is primarily
designed for the chemical, pharmaceutical, food and beverage industries as well as the
batch-oriented electronics industry.
Industry Type: Chemical, Pharma, Poultry, Dairy and many more.

REPETITIVE MANUFACTURING PROCESS

Company manufactures product in large numbers and production is quantity based and
period based not order based. You can use repetitive manufacturing as either make-to-
stock REM or make-to-order REM such as in the automotive industry.

Repetitive manufacturing form an industry type where in the products manufactured


can be discrete manufactured or process industry type, produced repetitively or
continuously in production lines. This forms the continuous production scenario.
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more

PREPARED BY : ROHELA KHAN


In the below document we are going to explain how the SAP Production Planning integrates
with SAP EWM Advanced Production Integration in SAP S/4 HANA 2023

To achieve this we have to go with following steps


Create 2 raw materials with MRP View Mandatory

2)Create 1 Finished material with MRP view & work Scheduling view
Mandatory

3)Create a storage location which is EWM Managed storage location

4)Assign Storage location to warehouse and plant in Enterprise Structure

5)Create production supply area in S/4 HANA

6)Create work center in S/4 HANA

7)create a Bill of Materials(BOM) for Finished product

8)Create Routing for Finished product

9)Create control cycles in S/4 HANA for Raw Materials

PREPARED BY : ROHELA KHAN


10)Define Production supply Area in EWM

11)Map storage location in Goods Movement

12)Maintain Stock Determination Groups & Determine stock


Determination

13)Define Product group types

14)Define Product group

15)Maintain product group type and product group in Material Master


Under Basic Data 2 tab

16)Maintain BC Sets

17)Maintain Product Group Type for PSA Assignment

18)Maintain Warehouse Parameters for Production

19)Map SAP ERP Order Type to SAP EWM Document Type

20)Map SAP ERP Order Type to SAP EWM Item Type

21)Assign bin to PSA/Product/PED(/N/SCWM/PSASTAGE)

22)Define Production supply area storage type(PMRL with role ‘K’) and
create bin

23.a&b) maintain Warehouse process type for both single order and cross
order components, Create part replenishment and Not relevant for
staging

24)Determine warehouse process type for Single order, cross order along
with Document type and Item type

25) Define Item Types for Production

26) Define Allowed Item Types for Production

27) Maintain strategies

28)Maintain Sock Determination group & Stock Removal Indicator in


/N/SCWM/MAT1

29)Testing

PREPARED BY : ROHELA KHAN


1)Create 2 raw materials with MRP View Mandatory

PREPARED BY : ROHELA KHAN


PREPARED BY : ROHELA KHAN
PREPARED BY : ROHELA KHAN
SINGLE ORDER:501

CROSS ORDER:502

2)Create 1 Finished material with MRP view & work Scheduling view Mandatory

PREPARED BY : ROHELA KHAN


PREPARED BY : ROHELA KHAN
PREPARED BY : ROHELA KHAN
After entering our BOM and routing information click on Check.it will turn into
green colour then our production version will work

PREPARED BY : ROHELA KHAN


3)Create a storage location which is EWM Managed storage location

PREPARED BY : ROHELA KHAN


4)Assign Storage location to warehouse and plant in Enterprise Structure

5)Create production supply area in S/4 HANA(Tcode:PK05)

6)Create a work center in S/4 HANA(Tcode:CRO1)

PREPARED BY : ROHELA KHAN


PREPARED BY : ROHELA KHAN
7)create a Bill of Materials (BOM) for Finished product

8)Create Routing for Finished product

PREPARED BY : ROHELA KHAN


9)Create control cycles in S/4 HANA for Raw Materials
Single order

Cross order

PREPARED BY : ROHELA KHAN


10)Define Production supply Area in EWM(Tcode:/N/SCWM/PSA)

Path: EASY ACCESS–>SCM EWM–>EWM—>Master Data—>Production Supply


Area—>Define PSA

There are two types of mapping 1) replicate or manual you can map

1) Replicate

/n /SCWM/PSA_REPLICATE - Replicate Production Supply Area (PSA

2)MANUAL
/N/SCWM/PSAMAP

PREPARED BY : ROHELA KHAN


11)Map storage location in Goods Movement

Path:SPRO-->SCM Extended Warehouse Management-->Extended Warehouse


Management---- Interfaces-->ERP Integration-->Goods Movements--->Map Storage
Locations from ERP System to EWM

12)Maintain Stock Determination Groups & Determine stock Determination

Path:SPRO-->IMG-->SCM EWM-->CROSS PROCESS SETTINGS-->STOCK DETERMINATION-


Maintain Stock Determination Groups

PREPARED BY : ROHELA KHAN


13)Define Product group types

Path:Spro->IMG-->SCM EWM-->SCM Basis-->master data-->product ---


>product groups-->define product group types

14)Define Product group

PREPARED BY : ROHELA KHAN


Note:In SAP S/4 HANA 2023 there is no option to assign the product group & type at EWM
global level
15)Maintain product group type and product group in Material Master Under Basic Data 2
tab
Single order

Cross order

PREPARED BY : ROHELA KHAN


16) Maintain BC Sets
For PMR

For Product group production supply

17)Maintain Product Group Type for PSA Assignment

Path: SPRO-->SCM Extended Warehouse Management-->EWM-->Master Data-->


Production Supply--> Maintain Product Group Type for PSA Assignment

18)Maintain Warehouse Parameters for Production

Path: SPRO-->SCM Extended Warehouse Management-->EWM-->Master


Data--> Production Supply--> Maintain Warehouse Parameters for
Production

PREPARED BY : ROHELA KHAN


19)Map SAP ERP Order Type to SAP EWM Document Type

Path: SPRO-IMG-SCM EWM-EWM-INTERFACES-ERP INTEGRATION-PRODUCTION- Map SAP


ERP Order Type to SAP EWM Document Type

20)Map SAP ERP Order Type to SAP EWM Item Type

Path: SPRO-IMG-SCM EWM-EWM-INTERFACES-ERP INTEGRATION-PRODUCTION- Map SAP


ERP Order Type to SAP EWM Item Type

21)Assign bin to PSA/Product/PED(/N/SCWM/PSASTAGE)


Single order

PREPARED BY : ROHELA KHAN


Cross order

22)Define Production supply area storage type (PMRL with role ‘K’) and create bin

PREPARED BY : ROHELA KHAN


23.a&b) maintain Warehouse process type for both single order and cross order components.
Single order

PREPARED BY : ROHELA KHAN


Cross order

24)Determine warehouse process type for Single order, cross order along with
Document type and Item type

25) Define Item Types for Production

Path: SPRO-IMG-SCM EWM-Extended Warehouse Management-Goods Issue


Process-Production Material Request-Define Item Types for Production

26) Define Allowed Item Types for Production

Path:SPRO-IMG-SCM EWM-Extended Warehouse Management-Goods Issue


Process-Production Material Request- Define Allowed Item Types for
Production

PREPARED BY : ROHELA KHAN


27) Maintain strategies

PREPARED BY : ROHELA KHAN


28)Maintain Sock Determination group & Stock Removal Indicator in /N/SCWM/MAT1
Single order

Cross order

PREPARED BY : ROHELA KHAN


29)Testing
To create production order (Tcode:CO01)

Enter the Total Quantity and type is current date

Check the routing, production version and BOM under Master tab

PREPARED BY : ROHELA KHAN


Click on Operations tab check the work center, plant and control key

Click on Components tab check the raw materials for plant and storage locations

Click on yes

Go to Tcode:CO02
Go to-Functions-WM material Staging-Simulate

PREPARED BY : ROHELA KHAN


Go to Functions-WM Material Staging-Execute

Go to /N/SCWM/PMR

PREPARED BY : ROHELA KHAN


Check the PMR Header

PMR Item details for Single order

PMR Item Details for Cross order

PREPARED BY : ROHELA KHAN


To create warehouse tasks, go to (Tcode:/N/SCWM/STAGE)

N/SCWM/MON
1) Single order components

Here we need single order components will be consumed based on production order

PREPARED BY : ROHELA KHAN


2) Cross order components

Here for cross order components there will be no manufacturing


number reference’s components will be consumed based on
combination of multiple Manufacturing orders. If we try to give
manufacturing order with warehouse type system will not execute the
open warehouse tasks

PREPARED BY : ROHELA KHAN


Confirm the Single & cross order open warehouse tasks

Here posting change has happened from F2 stock type to P2 Stock type

Check the physical stock in PSA Before consumption

For Consumption we need to do login RF Device


Go to /N/SCWM/RFUI

PREPARED BY : ROHELA KHAN


PREPARED BY : ROHELA KHAN
PREPARED BY : ROHELA KHAN
Check the Goods issue posting was happened in the monitor

Check whether the goods issue has been happened in MB51

PREPARED BY : ROHELA KHAN


Now we need to change the production order status from released to technically completed

Release status:

Go to Production order in CO02 and click on Complete Technically

By above configurations and testing now you got an idea how to do Advance
production Integration with SAP EWM-managed storage location in one
warehouse in SAP EWM

PREPARED BY : ROHELA KHAN

You might also like